Post Job Free
Sign in

Electrical Project

Location:
Dubai, DU, United Arab Emirates
Salary:
7000 USD/Month
Posted:
November 08, 2015

Contact this candidate

Resume:

Curriculum Vitae

Personal Details

Name : Mr. Joko Susanto

Nationality : Indonesian

Place-Date of birth : East Java-Indonesia, November 05th, 1976

Marital Status : Married

Religion : Moslem-Islam

Permanent Address : Legenda Bali Block E7 No.11 Batam, Indonesia

Current Location : Abu Dhabi-UEA

Contact Number : +971********* & +971*********

Email : *************@*****.***

Passport No. : B0092989

Skype : jokosusanto4

Availability : 1 Month

Expected Salary : Negotiate

Background Education

Title of qualification awarded : Bachelor degree of Electrical Engineering

Majoring in Power System Engineering (July 1996 till June 2000)

Name and type of organization : National Institute of Technology (ITN) – Malang

Career Achievement and Qualification

Performed & directly representing for Oil & Gas, Rrefinery company (TAKREER Refinery, ZADCO, ADMA-OPCO, EXXON MOBILE, TOTAL E&P) Client in the implementation of Project Quality Control.

Monitor and supervised electrical and instrumentation system /equipment erection/installations, Pre-commissioning/commissioning and plant start-up till hand-over to client.

Summaries Supervision/Inspector in Total E&P Project:

Total E&P Myanmar - Offshore Yadana Subsidence Project (Fabrication-Installation)

Total E&P Indonesie – Offshore Sisinubi & Peciko Project (Fabrication-Installation)

Total E&P Indonesie - TP11S-Offshore Platform Fabrication and Installation

Training Approved & Technical Qualification

Electrical & Instrument Inspector Certified by Offshore Technology Institute Batam Oil-Gas & Marine Professional Training (License OTI.EI-IV.0610.07) www.batamtraining.com

T-BOSIET Training OPITO Cert. Number 52515501150414121808

Gulf Technical & Safety Courses (GTSC) -Abu Dhabi

Basic H2S Training OPITO Approved Cert. Number 52519014160414121875

Gulf Technical & Safety Courses-Abu Dhabi

ZADCO Optima (Offshore Passenger Travel Management) approved No. 564571

ZADCO HSE Induction, LOTO-Commissioning & PTW System

TAKREER Refining HSE Induction, commissioning training

TEPM-Total E&P Myanmar safety Offshore Training

TEPM-Total E&P Myanmar Permit To Work, Task Risk Assessment, LOTO & SIMOPS training

APAVE – France Ability Certificate LV/HV Cable Installation (Preparation for Electrical Approval)

Supervisory Management course Certified by Matshusita Electric Asia Pte Ltd

TPM (Total Preventive Maintenance) Certified by Productivity Quality Management Consultant (PQM)

7QC Tools and The Seven Management & Planning Tools Certified by Productivity & Quality Management (PQM) Consultants.

Summary

A highly skilled and quality conscious Electrical & Instrument with more than 12 years’ experience on combined as field in Electrical & Instrument Inspection, Supervision, Construction activities in Oil&Gas Offshore Platform & Onshore (Brownfield/Greenfield/Topside/Fabrication), Refinery and Power Plant industries.

Experience for Pre Commissioning-Commissioning and start Up for oil & gas onshore/offshore, Assisted Package commissioning unit leader to prepare and execute commissioning activities and operation test procedure (OTP), OPERCOM methodology, Coordinate with ICAPS & Electrical & Instrument.

Familiar with electrical equipment Installation & testing of Electrical Cables LV/ELV/HV/EHV, Sub Station/Electrical House built 220/132/33/22 kV i.e.MV GIS Switchgear-Bust Duct-Transformer, HV/LV Motors, AC/DC UPS-Battery, Earthing System, Cathodic Protection System (ICCS), Heat Tracing System, etc.

Understand with Instrument, Fire &Gas, Telecom system Installation, Inspection & Testing such as Hook up instrument, Tubing testing, Instrument of calibration, Loop Test, Fiber optic Cable, DCS-ESD Configuration, ICSS-PCS-SIS-Cause Effect Diagram, heat detector, gas detector, PAGA, CCTV, etc.

Employment History

Period : From Sept 2014 to present

Company : Bureau Veritas S.A Abu Dhabi – UAE

Position : E&I Inspector (TPA-TPI/PMC/Client Representative)

Approved Assignment as TPI (Third Parties Inspection)/Client Representative for:

Company : Zakum Development Company (ZADCO), Jun 2015 – Now

Project : UZ 750K PROJECT P-7511- EPC1 (OFFSHORE PLATFORM)

Position : Electrical & Instrument Inspector (Client Representative)

PMC : AMEC

Contractor : Technip France & NPCC (National Petroleum Construction Company)

Line Project:

SUBSEA PIPELINES, CABLES, OFFSHORE STRUCTURES & BROWNFIELD (EPC-1)

Major Task:

Inspection and Testing (Precomm-Assist Commissioning) for 22 kV HV GIS Switchgear.

Inspection and Testing for LV/HV Cables (<1.0 kV/11 kV/33 kV) from island to Platform.

Inspection and Testing Fiber Optic through to subsea and connecting to Junction Box Platform.

Installation, Inspection and Testing for control valve, on/Off Valve/Shut down Valve and local control panel.

Company : ADMA-OPCO (Abu Dhabi Marine Operation Company)-UAE, March 2015 to May

Project : EPC Works for Zakum Field WHT’S Electrification ZWSC/ZCSC TOPSIDE Electric

Works Package “A “(Contract No. 172700) – Fabrication

Position : QA/QC E&I Inspector Team Leader (TPI/Client Representative)

Contractor : Control Contracting & Trading Co. Pvt WLL – Yard Fabrication Abu Dhabi

Line Project :

New Installation & Modified Electrical System at ZWSC (Zakum West Super Complex Platform) & ZCSC (Zakum Central Super Complex Platform) Electrical System comprises of Power Generation Platform (PGP) and Gas Gathering Platform (GG2).

As a part of this project:

Pre Fabrication-Fabrication-Installation a new containerized package substation with in-built 6.6 kV MV switchboard and ECMS system is installed at ZWSC BST-S1 & ZCSC PGP called Electrical Platform (EP)

Installation MV/LV transformers, shunt reactors, NERs and splitter boxes to feed power supply to the WHTs at this BST-S1 Utility Platform (UP).

Installation topside facilities like transformers, DBs and DC UPS systems

Installation subsea cables (Cables rated for 11kV voltage grade) at 6.6kV Voltage levels.

Company : Zakum Development Company (ZADCO), Sept 2014 to Feb 2015

Project : Zirku Island - Satah Full Field Development (STFFD) Greenfield Project No. P7218

Position : QA/QC Electrical Inspector (TPI/Client Representative)

Pre commissioning/Commissioning Inspector (TPI/Client Representative)

Contractor : Technip France & NPCC (National Petroleum Construction Company)

Line Project :

Modification in offshore existing Well Head Panel and Production Manifold Platform (PMP)

Installation new field Flow Lines between WHP's and Pump Gas Pipe Line from PMP to Zirku Island, Gas Injection Pipe Line from Zirku to WHP-09 and WHP-01 through PMP and Umbilical.

Modification and installation of new facility at onshore Satah Plant and Zirku Plant.

Major Task:

Inspection for installation and pre commissioning for Substation System with in-built 22kV HV GIS Switchgear (Schneider), 380V LV Normal/Emergency Switchboards (Larson & Toubro) and Bus duct.

Inspection for installation - pre commissioning 12.5 MVA ABB Oil Immersed Transformer & 22 kV/6.6 kV & 2.5 MVA Oil Transformer 22 kV/0.4 kV.

Inspection for installation - pre commissioning (Continuity, IR, HIPOT)-pre commissioning of Cables LV/HV/EHV (<1.0/6/10/15/20/33kV/132 kV up to 220kV) directly buried trenches, Ladder/Tray and duct laid.

Inspection for installation and pre commissioning for GE Energy HV Motor (8 MW/6.6 kV) for Gas Injection Compressor Package – VSD-VFD

Inspection for installation - pre commissioning, motor pump for generated Dehydration Unit Package, Electric Motor in Instrument Air Compressor Package, Electric Motor in drain Pump Motor, etc

Inspection and Testing for Normal/Emergency/Essential Lighting and Small power distribution board.

Inspection and Testing for UPS system (24 VDC, 48 VDC, 125 VDC and 220 VAC)

Inspection and Testing for cathodic Protection System, ICCS system (Transformer Rectifier, Anode, JBs, Test Point (Reference Electrode) & Positive/Negative DC Cables.

Inspection and Testing Heat Tracing System (DBs, Self-Regulating Heat Cables, Temp. Control RTD, JBs, etc.)

Responsibilities:

Review and comment on ITP’s, Method Statements, Project Procedures and Technical Specifications as and when required.

Performs routine surveillance of assigned areas and disciplines to ensure compliance with applicable codes, standards, specifications and drawings. Closely monitors surveillance activities of subordinates to ensure compliance to agreed plan.

Witness/inspection and control Quality aspects of Electrical and Instrumentation construction and installation activities to ensure that they and are consistent with project specifications, procedures and relevant international codes and standards.

Review daily RFI’s and allocate amongst subordinates as appropriate.

Regular and timely response to contractor raised RFI’s to witness and verify technical inspections as required by ITP’s and AFC Drawings

Co-ordinate site inspection and ensure fabricated, installation & testing are in accordance with the ITP’s, contract/project specification, procedure, Site Drawings approved and Method Statements.

Witness pre-commissioning test (Check list/ test Sheet-ITR) and ensure safety of commissioning process of Electrical & Instrument installations.

Witness and sign off individual system and subsystem prior pre-commissioning check list ad test sheet.

Sign-off individual discipline pre-commissioning dossiers and associated discipline acceptance certificates.

Ensure NCRs are raised and closed out in timely manner in order not to delay completed project.

Punch point closing shall be monitored and ensure closing in timely manner and shall be witness.

Maintain all QA/QC records at site ensure that all activities complied from updated documents, code standard and specification required by the quality system.

Regularly attend QA/QC Weekly Meeting with contractor and contribute to resolution of quality issues that occurred within a week.

Coordinate with the (PMC) project management consultant on matters pertaining to electrical & instrumentation inspection activities.

Closely cooperate with PMT Construction/HSE departments in order to ensure work is being performed in a safe manner and within stipulated time by promoting pro-active approach.

Ensure all activities are undertaken in compliance with Company Safety, Health and Environment and Quality policies, regulations and standards.

Issuing Daily reports to the QA/QC Team Leader/Project Manager.

Period : From March 2014 to Aug 2014

Company : Bureau Veritas S.A Abu Dhabi – UAE

Project : ADNOC-TAKREER REFINING ABU DHABI

RRE-RuwaisTakreer Refining Expansion Project

- EPC-4 Tankage & Piping Interconnection”

- CARBON BLACK & DELAYED COKER (CBDC Project)

Position : Instrument Inspector (TPI/Client Representative)

Contractor : Daewoo E&C & Samsung E&C

Responsibilities:

Reviewing and comment sheet for Quality Control Plan/ITP’s, Method Statements and other technical document related in accordance with company requirements.

Carrying out Third Party Inspection base on RFI (Request for Inspection) on Electrical & Instrument installations according to established ITP’s and ensuring compliance of installations with standard requirements and according with project specification, contract, Procedure and code & Standard.

Responsible for inspection/witnessed the testing of all electrical & instrumentation equipment prior to fabrication, installation to ensure that all equipment testing activities are in meet with the quality requirement/approved procedures & HSE requirements.

Performing Witness / Review for all instrument calibration, electrical equipment and cables test as per constructional requirement of acceptance test and criteria.

Witnessing Loop check (Cold/Hot) and review & signed for all document Loop folder

Witnessing IFAT-FAT for Panels ICSS-DCS&ESD Field Cabinet-Marshaling Cabinet for Carbon Black & delayed Coker project at Yokogawa Middle East & Africa Factory.

Inspection for Field Instrument installation, Testing/Pre commissioning & commissioning.

Tubing testing (Leak test/Pressure test) and field calibration for control valve, On/off Valve and Shut down valve

Punch list clearance and review Mechanical Completion Dossier (for RFC).

Witnessed for Pre commissioning –commissioning activities according with system-subsystem

Period : December 2013 to March 2014

Company : Exxon Mobile Cepu Limited

Project : Oil - Onshore Central Processing Facilities (CPF) project EPC-1

Position : Electrical Inspector

Contractor : Tripatra - Samsung Engineering Consortium (EPC)

Major Task:

Banyu Urip EPC1 Onshore Project, Witnessing of FAT-SAT 6.6/11 kV MV Switchgear and Electrical control Monitoring system (ECMS) at ABB-Malaysia Factory.

Banyu Urip EPC1 Onshore Project Witnessing of Factory Acceptance Test of Fiber Optic Cable.

Responsibilities:

Reviewing Quality Control Plan/Inspection and Test Plans, Method Statements and work procedure in accordance with company Requirements.

Reviews drawings, specifications and other documents prepared by contractors / consultants.

Visual Inspection appearance & Construction check for MV Switchgear (Construction & Dimensional, LV Compartment, Equipment Specification, Coating)

Witness for MV Switchgear Cable, Bus Bar testing (Insulation resistance test, Dielectric test/HIPOT)

Witness for MV Switchgear Function test (Electrical function Circuit function test, relay function test, Sequence test: measuring equipment function test).

Witness for MV Switchgear Protective circuit function test and main circuit connection (Earthing Switch, Disconnecting Switch, Circuit Breaker or Contactor)

Witness for MV Switchgear Interlock system & interconnection configuration system Current Transformer/Voltage Transformer, CT Function test-VT Function test

Fiber optic Cable FAT:

Witness FAT of Fiber Optic Routine Test (Attenuation, Dimensional, Water penetration, Temperature cycle test & mechanical test)

Witness Fiber optic Type Test ( Fire Resistance & Flame Retardant)

Period : From September 2012 to November 2013

Company : Total E&P Myanmar (TEPM) – Guna nusa Utama Fabrication Yard

Position : E&I Supervisor

Contractor : PT. Guna Nusa Utama Fabricator (EPCC)

Project :

Total E&P Myanmar Offshore Yadana Subsidence Project (SIMOPS)-Brownfield

EPSCC1 Package construction of new flare, bridge, and new living quarter (jacket 2700MT MSF 3000MT).

EPSC2 package relocation of equipment located on wellhead and compression platform to secure flied exploitation with platform subsidence

Responsibilities:

Review Inspection Test Plan, Method Statement, specifications, and procedures and verify where exceptions are taken together with the necessary engineering approval sign off.

Ensure all referenced documents (latest revisions) are included in the work pack and that the Fabrication, Installation Contractor understands and complies with the requirements for specification and quality.

Supervises and coordinate the Quality Control functions/activities of a project or its parts, Including Quality Control inspection schedules and the collection of Quality Records.

Witness and control Quality aspects of Electrical and Instrumentation construction and installation activities to ensure that they and are consistent with project specifications, procedures and relevant international codes and standards.

Verify Contractor / Subcontractor Quality management systems, plans, procedures, and Processes are in Place.

Review Contractor’s field inspection and test reports and ensure that inspections are carried out as per Approved ITP requirements.

Coordinate & Supervises inspections, reports and the documentation issued by inspectors (Check List/Test Sheet) and collect and file the required Quality Records.

Conduct inspection of or observe construction activities performed by the contractor and subcontractors to ensure compliance with the contract documents.

Conduct or observe tests to determine if work was performed in accordance with contract specifications.

Coordinate and review the work pack completion inspection and documentation required for final acceptance and contract close out.

Coordinate with ICAPS & Punch list coordinator for clearance of items

Assisted Pre commissioning & Package commissioning unit leader to prepare and execute commissioning activities follow up using OPERCOM methodology

Sign on behalf of Pre commissioning & package commissioning unit leader all ICAPS sheet attached to Electrical/instrument activities.

Responsible for comment of all Electrical/instrument OTP’s issued by EPCCs before execution of operational test at site.

Ensure that the mechanical completion dossier is duly completed. Define requirements for preservation of the Instrumentation and Electrical installations prior to commissioning, start up and hand over of the work pack as part of a system.

Auditing of on-site Contractors against approved procedures and control plans

Ensure that TEPM Standing instruction, Site Operating procedure, and additional operating procedure such as SIMOPS are known by the team and enforced,

Establish the HSE activities.

Period : August 2011 to September 2012

Company : PT.TRUBA JAYA ENGINEERING (EPC)

Position : QA/QC E&I Engineer

Client : Shanghai Electric Corporation Co, Ltd- Owner PLN - Electrical Government

Project :

Coal Fired Power Plant 3x350 MW Palabuhan Ratu, West Java-Indonesia

Responsibilities:

Ensured that all Quality Manuals/Documents needed for the project is available at site.

Strictly Implemented the Approved Project Quality Plan including Inspection and Test Plan.

Ensured that all necessary resources needed for carrying out QC activities are available at site.

Ensured that all equipment used at site are calibrated Review and Maintained files of Calibration Certificates.

Review and Check Electrical / Instrumentation Drawings, Design Packages, Specifications and Vendor Drawings.

Coordinated with Construction Manager / Superintendent, QA/QC Manager QC inspectors regarding all Quality matters.

Ensured that proper coordination with the client for the witnessing is being observed.

Prepared Test Reports, Check Lists, ITP, Method of Statements and preservation of approval.

Ensured that QC Inspectors are working to define the Quality procedures.

Coordinated and attended technical meetings for the Quality Status of the project

Reported to the QA/QC Manager on regular bases.

Period : From February 2010 to July 2011

Company : PT.GUNA NUSA UTAMA FABRICATOR (EPC)

Position : QC Electrical Inspector (Fabrication/Construction/Installation & Pre Commissioning)

Project :

HESS Ujung Pangkah Development Offshore Phase II (CPP+AUP) Platform EPCC.

Responsibilities:

Ensure that all Electrical related activities are performed safely and in compliance with project specifications, company standards, and regulatory requirements.

Ensure that all required E&I related inspections are performed properly.

Responsibilities of all Electrical site inspection as per inspection test plan (ITP).

Checking, Verification and Testing of fabrication, construction and installation work perform by contractors/sub-contractors in order to confirm that the applicable rule, code and standard are being meet and that the project requirements on the design drawing/specification

Monitor construction of electrical facilities and ensure they are completed as per approved engineering documentation and project specifications

Executes the inspections on materials, equipment and construction/installation activities on site & witnessing SAT (Site Acceptance Tests) and FAT (Factory Acceptance Tests) of Electrical

Checking and review the vendor documents (datasheet, calibration certificate and ATEX certificate) for electrical.

Prepare & perform inspection/test reports and ensure according with approved engineering drawing, specification or code & standard and maintain the QA/QC files related to assignment

Perform inspection during fabrication and installation support of electrical (support Cable tray/ladder, Support equipment etc)

Perform inspection Cable tray/ladder, Electrical Equipment (Switchgear, Switchboard, Panel Distribution, Transformer, electric motor, Junction Box, Lighting, Navigation Aids, Grounding/earthing, etc) installation.

Perform inspection for cables installation (Puling, glanding & termination and marking system accordance with engineering design).

Monitor and witness continuity, insulation resistance inspection & HIPOT Test for cables/Motor/Transformer.

Monitor and/or evaluate electrical tests and inspections such as ground fault, ground resistance, insulation resistance, polarity, circuit integrity, load and other electrical tests as required.

Witnessing the pre commissioning/Commissioning test and other test if any

Prepare, review and compiling the dossier for electrical & Establish the HSE activities

Perform daily and weekly report to QA/QC Manager

Period : From May 2009 to January 2010

Company : PT. Surveyor Indonesia Batam Branch (Government Company)

Position : Electrical Inspector - 3rd parties Inspection

Major Project :

Oil Well Drilling Equipment Inspection (TPI)

Client: Schlumberger, BJ Services (Baker Hughes) & Expro Oil Gas Service Company

(Inspection base at Singapore)

Building Certification/Inspections at Eni Saipem Karimun Yard – Indonesia

Position as Team Leader Inspection/Certification.

Scope Certification of Electrical-Fire Fighting-Environmental

Period : Feb 2008 – April 2009

Company : PT.GUNA NUSA UTAMA FABRICATOR (EPCI)

Position : QC ELECTRICAL & INSTRUMENT INSPECTOR

Project :

TP11S-Total E&P Indonesie - Offshore Platform Fabrication and Installation

Responsibilities:

Witness and control Quality aspects of Electrical and Instrumentation construction and installation activities to ensure that they and are consistent with project specifications, procedures and relevant international codes and standards.

Perform Inspection activities based on approved Inspection and Test Plan (ITP) with ensure all Electrical & instrument fabrication/construction and installation according with project specification, procedure and relevant international code/standards.

Verify material verification, check certificates and test report to ensure incoming materials conform to specification.

Participate in the final check out, witness simulation / functional test and approval of FAT’s (Factory Acceptance Test) and SAT’s (Site Acceptance Test) of Electrical and Instrumentation equipment as per approved Purchase Order.

Issue Non-Conformity Report (NCR) where construction is not in accordance with project requirements.

Performing Witness / Review for all instrument calibration, electrical equipment and cables test as per constructional requirement of acceptance test and criteria.

Witnessing Loop check then review & signed for all document Loop folder Inspection for Field Instrument installation, Testing/Pre commissioning & commissioning.

Tubing testing (Leak test/Pressure test) and field calibration for control valve, On/off Valve and Shut down valve

Punch list clearance and review Mechanical Completion Dossier (for RFC).

Witnessed for Pre commissioning –commissioning activities according with system-subsystem

Review and check Mechanical Completion Packages for Electrical and Instrumentation activities as per project Handover Packages Documentations. (Precommissioning Check list & Test sheet approved)

Coordinate with ICAPS & Punch list coordinator for clearance of items.

Maintain good record keeping of activities carried out and inspection reports, surveillance reports, etc.

Implement Administrative Rules and Regulations of the Company and Enforce Safety Regulations.

Reporting to the QA/QC Manager on regular basis.

Period : From July 2006 to Jan 2008

Company : PT. Mc Dermot Batam Indonesia Fabrication Yard

Position : QA/QC E&I Inspector

Project :

SuTuVang– ConocoPhillips Vietnam Project

Responsibilities:

Carried out site inspection from receipt of materials, construction till pre commissioning using the latest approved Quality Documentation / Procedures and Specifications / Drawings.

Performed Inspection activities based on approved Inspection and Test Plan (ITP), Method Statement and recorded on Check ITR (Inspection test Record).

Generated Inspection Request and coordinate with client to witness the inspection activities and obtain their approval signatures.

Ensured that appropriate Quality Records for each activity carried out are documented and filed.

Witness for Continuity & Insulation Test, High Voltage test cable/Bus Bar for HV, MV & LV cable,

Conducted installation inspections of instrument equipment such as LT, PT, TT, PG, PSV, and Control/On-Off/Shut down Valve.

Witnessing of Calibration of instruments such as PSV,PG, PDG, LT, TT, PT,TG & etc.

Witness for Tubing Testing

Loop Check and instrument function Test works requirements and associated activities at site.

Rise up & close the punch list during inspection.

Assist in the completion of the fabrication final dossier documentation process for final hand-over of the construction, installation, inspection and test work scopes.

Maintained Quality Records for the project activities according to project Handover Packages Documentations.

Implemented Administrative Rules and Regulations of the Company and Enforce Safety Regulations.

Reported to the QA/QC Manager on regular basis.

Period : From April 2005 to July 2006

Company : PT.JGC INDONESIA

Position : Electrical Engineer

Project :

Design Engineering KNPC, Middle East,

Proposal Bronzonk Ethanol Project, West Java, Indonesia.

Responsibilities:

Performs design calculations and electrical system study according to project specifications and industry accepted engineering calculation methods with minimal mistakes and ensure design calculations are in accordance with project requirements and done within schedule and budget man-hour

Prepares specifications, data sheets, requisitions, technical evaluations and vendor data review according to project specifications with minimal mistakes and ensure the outputs are in accordance with project requirements and done within schedule and budget man-hour.

Designs and drafts construction drawings and sketches according to project specifications with minimal mistakes and ensure the drawing outputs are in accordance with project requirements and done within schedule and budget man-hour.

Normally coordinates with Technical Auditor, Clients, subcontractors and vendors regarding technical matters pertaining to basic and detailed design proceedings to guarantee that all outputs have been checked and verified for correctness and adequacy and that all project requirements are clear and complete.

Normally performs electrical estimation works including BM/BQ to check and verify that estimated materials are complete and in compliance with applicable standards and client requirements.

Occasionally conducts field surveys necessary in the preparation of field change sheets or front-end engineering in coordination with other disciplines to ensure correctness of design.

Maybe assigned as Field Engineer at construction site to assume responsibility of checking and revising drawings for construction, coordination with Client, Vendors and subcontractors, and inspection and testing of electrical equipment.

Performs other functions that may be assigned by superiors.

Period : Dec 2004 to April 2005

Company : PT. Sempec Indonesia

Position : Electrical Inspector/Supervision

Project :

Oil & Gas - BCD3/NGF Petrochina Project -Jambi, Indonesia

Responsibilities:

Review work procedures and method statements for compliance with good work practices and the customers contract specializations

Witnessing and sentencing of all site inspections within Electrical disciplines

Ensure that all inspection reports are accurate and that all attached documents are current status

Ensure all work is correctly prepared prior to any inspection being undertaken

Assist the site subcontractors in the resolution of drawing interpretation.

Liaise with the site construction engineers and provide assistance when requested

Review all inspection reports for compliance

Prepare nonconformance reports to the QA manager and assist in developing corrective actions

Coordinate with the site subcontractors to ensure that communications exist and are maintained

Punch list Activity to keep Quality at Project requirement.

Assist in the reviewing, verification and closing of punch items generated from ITRs.

Period : From Feb 2001 to Nov 2003

Company : PT. TEAC ELECTRONIC BATAM

Position : Senior Process & Quality Control Engineer

Responsibilities :

Organize, coordinate and control the activities Manufacturing Process and Quality.

Monitor process performance indices on qualified processes and establish good controls to maintain process performance

To work on projects which include the concept design, cost calculation, and successful Implementation.

Ensuring that all contractual Quality Standards and Inspections

Process and material study upon receiving the non-conformance from production.

Conducts internal audits following regulatory, industry and internal quality guidelines including ISO.

Conducts process audits and follow up closure of open audits.

Develops and initiates standards and methods for inspection, testing and evaluation.

I declare that the information given above is complete, true and accurate. Any false particulars or suppression of material facts will render me liable to disqualification and if appointed to dismissal without notice from your company.

Sincerely Yours

Joko Susanto



Contact this candidate