Jayne M. Mooney
Bettendorf, Iowa 52722
Email: ***********@*****.***
OBJECTIVE
To expand my engineering potential with an innovative and growing company
EXPERIENCE
January 2005 - Harrington Signal, Moline, Illinois
Present Quotation/Process/Document Engineer
- Work on a daily basis in manufacturing environment with the
following types of operations: printed circuit board assembly
(surface mount technology and through hole), mechanical
assembly and Machine Shop
- Helped create and implemented new ECO system in M2M MRP
system
- Create and maintain Build Instructions with pictures in Microsoft Word
- Update Routings, BOMs and Build Instructions due to customer/
process flow changes
- Process Quote packet received from Sales for the Quote
Management Team and hold Quote Meeting
- Using View Mate and PDFill create .pdf prints from PCB Gerber
files and plot the prints for Quote Meeting
- Figure labor on Quote Packet then pull together with material
and test information to present to Manufacturing Manager
- Enter accepted Quotes into M2M by creating new part numbers,
Routing and BOM
- Give work direction to Document Control
- Access circuit board component specification sheets on Internet
for entering the part into M2M or to resolve production problems
- Analyze actual time versus standard time and update Routings to
reflect accurate costs and production times
January 2000 - Harrington Signal, Moline, Illinois
April 2003 Quotation/Process/Document Engineer
- Figure labor on Quote Packet then pulled together with Material
and Test information to present to Sales
- Write Build Instructions in text format then in 4th Shift MRP
System
- Analyze actual time versus standard time on completed orders
- Main contact in shop for production problems
- Write ECOs then updated Routings, BOMs and Build
Instructions per the change
- Update Routings, BOMs and Build Instructions due to customer
or process flow changes
- Coordinator for Bring Your Daughter To Work Day for three
years
December 1996 - McLaughlin Body Company, Moline, Illinois
November 1999 Industrial Engineer
- Conduct time studies with computerized pre-determined motion
analysis (EASE) or stopwatch while analyzing for most efficient
and safe production method
- Create and maintain detailed process assembly sheets containing
pictures
- Line balance main assembly line with its subassembly lines
- Create new and revised plant layouts
April 1996 - Brammer Manufacturing Company, Davenport, Iowa
December 1996 Engineering Database Manager
- Supervised employees responsible for maintaining and
supporting MRP database
- Documented plant layouts in AutoCAD
April 1994 - Penberthy Inc., Prophetstown, Illinois
March 1996 Industrial Engineer
- Research, write train and implement OSHA mandated safely
programs
- Implement safety committee
- ISO 9002 auditor
July 1993 - Char-Nor Enterprises, Milan, Illinois
February 1994 Maintenance Supervisor/Safety Manager/Industrial and Plant
Engineer/Purchasing Agent
- Supervise Maintenance employees
- Obtain quotes then procure parts and supplies for projects
- Investigate and implement solutions to safety issues
- Organize and run employee Safety Meetings
- Analyze and organize proposed projects for efficiency
August 1990 - HON Company, Muscatine, Iowa
February 1993 Industrial Engineer
- Work as a Team Member in Steel Case Goods to resolve
manufacturing problems
- Establish and maintain time standards with use of MTM or
stopwatch
- Interact with Product Engineering to introduce new product into
production and enter BOM into MRP system
- Coordinate and implement plant layout changes
December 1988 - GE Appliance Controls, Morrison, Illinois
August 1990 Industrial Engineer
- Specify, plan procurement and coordinate installation of
equipment, tools and fixtures on a high volume, automated
production line that produces high technology automotive air
conditioning pressure switches
- Implement and complete cost improvement projects that involved
creating and implementing plant layouts plus designing, installing
and updating work stations
- Worked as a team with Foreman, Quality Control Engineer and
Production Engineer to address production line problems
- Advisor to production line employees to assist with evaluating
and answering employee suggestions
- Establish and audit time standards
June 1985 - ATT Information Systems, Naperville, Illinois
December 1988 Circuit Pack Planner and Physical Designer
- Coordinate design and schedule from initial design to
introduction into factory in Oklahoma City for production on
computer circuit boards
- Design interface to manufacturing plant in Oklahoma City on
documentation issues for new and existing circuit boards
EDUCATION
University Of Wisconsin – Stout, Menomonie, Wisconsin
Bachelor of Science: Industrial Technology
Concentration: Manufacturing Engineering
Minor: Business Administration
GPA: 3.7/4.0
REFERENCES AVAILABLE UPON REQUEST