Post Job Free
Sign in

Engineer Industrial

Location:
Bettendorf, IA
Posted:
November 02, 2015

Contact this candidate

Resume:

Jayne M. Mooney

**** **** ***** ****

Bettendorf, Iowa 52722

563-***-****

Email: acsawz@r.postjobfree.com

OBJECTIVE

To expand my engineering potential with an innovative and growing company

EXPERIENCE

January 2005 - Harrington Signal, Moline, Illinois

Present Quotation/Process/Document Engineer

- Work on a daily basis in manufacturing environment with the

following types of operations: printed circuit board assembly

(surface mount technology and through hole), mechanical

assembly and Machine Shop

- Helped create and implemented new ECO system in M2M MRP

system

- Create and maintain Build Instructions with pictures in Microsoft Word

- Update Routings, BOMs and Build Instructions due to customer/

process flow changes

- Process Quote packet received from Sales for the Quote

Management Team and hold Quote Meeting

- Using View Mate and PDFill create .pdf prints from PCB Gerber

files and plot the prints for Quote Meeting

- Figure labor on Quote Packet then pull together with material

and test information to present to Manufacturing Manager

- Enter accepted Quotes into M2M by creating new part numbers,

Routing and BOM

- Give work direction to Document Control

- Access circuit board component specification sheets on Internet

for entering the part into M2M or to resolve production problems

- Analyze actual time versus standard time and update Routings to

reflect accurate costs and production times

January 2000 - Harrington Signal, Moline, Illinois

April 2003 Quotation/Process/Document Engineer

- Figure labor on Quote Packet then pulled together with Material

and Test information to present to Sales

- Write Build Instructions in text format then in 4th Shift MRP

System

- Analyze actual time versus standard time on completed orders

- Main contact in shop for production problems

- Write ECOs then updated Routings, BOMs and Build

Instructions per the change

- Update Routings, BOMs and Build Instructions due to customer

or process flow changes

- Coordinator for Bring Your Daughter To Work Day for three

years

December 1996 - McLaughlin Body Company, Moline, Illinois

November 1999 Industrial Engineer

- Conduct time studies with computerized pre-determined motion

analysis (EASE) or stopwatch while analyzing for most efficient

and safe production method

- Create and maintain detailed process assembly sheets containing

pictures

- Line balance main assembly line with its subassembly lines

- Create new and revised plant layouts

April 1996 - Brammer Manufacturing Company, Davenport, Iowa

December 1996 Engineering Database Manager

- Supervised employees responsible for maintaining and

supporting MRP database

- Documented plant layouts in AutoCAD

April 1994 - Penberthy Inc., Prophetstown, Illinois

March 1996 Industrial Engineer

- Research, write train and implement OSHA mandated safely

programs

- Implement safety committee

- ISO 9002 auditor

July 1993 - Char-Nor Enterprises, Milan, Illinois

February 1994 Maintenance Supervisor/Safety Manager/Industrial and Plant

Engineer/Purchasing Agent

- Supervise Maintenance employees

- Obtain quotes then procure parts and supplies for projects

- Investigate and implement solutions to safety issues

- Organize and run employee Safety Meetings

- Analyze and organize proposed projects for efficiency

August 1990 - HON Company, Muscatine, Iowa

February 1993 Industrial Engineer

- Work as a Team Member in Steel Case Goods to resolve

manufacturing problems

- Establish and maintain time standards with use of MTM or

stopwatch

- Interact with Product Engineering to introduce new product into

production and enter BOM into MRP system

- Coordinate and implement plant layout changes

December 1988 - GE Appliance Controls, Morrison, Illinois

August 1990 Industrial Engineer

- Specify, plan procurement and coordinate installation of

equipment, tools and fixtures on a high volume, automated

production line that produces high technology automotive air

conditioning pressure switches

- Implement and complete cost improvement projects that involved

creating and implementing plant layouts plus designing, installing

and updating work stations

- Worked as a team with Foreman, Quality Control Engineer and

Production Engineer to address production line problems

- Advisor to production line employees to assist with evaluating

and answering employee suggestions

- Establish and audit time standards

June 1985 - ATT Information Systems, Naperville, Illinois

December 1988 Circuit Pack Planner and Physical Designer

- Coordinate design and schedule from initial design to

introduction into factory in Oklahoma City for production on

computer circuit boards

- Design interface to manufacturing plant in Oklahoma City on

documentation issues for new and existing circuit boards

EDUCATION

University Of Wisconsin – Stout, Menomonie, Wisconsin

Bachelor of Science: Industrial Technology

Concentration: Manufacturing Engineering

Minor: Business Administration

GPA: 3.7/4.0

REFERENCES AVAILABLE UPON REQUEST



Contact this candidate