OMAR AL-ZOUBI, PMP®
TEL-+1-780-***-**** E-MAIL *************@*****.***
PAGE 1 OF 5
Project Construction Management
PROFILE
Team-spirited professional, patient and resourceful. Positive, and strategic creative thinker/problem solver using Value Engineering techniques – Effective in streamlining operations, improving productivity, and reducing costs. Able to handle multiple responsibilities, set priorities, clearly communicate ideas to others, and respond positively to demanding situations. Recognized for speed, accuracy, quality of work, and outstanding customer service. OBJECTIVE
I have diversified vast professional experience in the construction industry. I have managed and worked with mega complex projects and have implemented them successfully, efficiently and quality. Have expertise in project cost estimation, budgeting, scheduling, material and procurements, field engineering
(specially piping field). Have up to date knowledge about various project management techniques. Seeking a senior position in a competitive Engineering & Consulting firm where I could prove my expertise and vast experience gained in this area.
EDUCATION & CERTIFICATES
1989 – 1994 ● B.E. in Mechanical Engineering from Jordan University of Science and Technology March 2003 ● IRCA QMS Internal Auditor Certified from BVQI (based on ISO 9001:2000) May 2009 ● Project Management Professional – PMP
April –Sep 2012 ● INSEAD executive management training program – INSEAD Campus Abu Dhabi branch
● Pursuing Master degree of Engineering Management HIGHLIGHTS OF ACHIEVEMENTS
• Key person among project team who managed successfully obtaining U & U2 ASME stamp – for construction requirements of ASME Section VIII, Division 2 Pressure Vessel Code, 2007 Edition.
• Leading training & instruction team to develop fresh graduate staff/engineers and prepared handout books for reference study.
• Organized and managed (internal/external) technical and commercial audit for projects
• Organized Risk management work shop for project management team to identify project risks, risk assessment, proposing risk response planning, and risk monitoring and control. COMPUTER SKILLS
• Applications: Primavera P3, Microsoft office, Auto Cad 2000
• Languages: Foxpro-2.6, D-base-3, and MS Access
COURSES & TRAINING SEMINARS
• QMS Internal Auditor-Iso-9000:2000 ● Delegation
• Contractual Obligations & Rights ● Negotiation
• Risk Management Evaluation & Calculation ● Construction Planning & Scheduling
• Leader Ship & Management program ● 360 degree evaluation system, HR
• Cost Control and Budgeting ● Risk Management
• Quality management system ● INSEAD Executive management training
● Texas University Seminar for project management and productivity improvement course PROFESSIONAL EXPERIENCES
Major Projects executed
1. LNG Projects:
1. Qatar Liquid Gas Project (QLNG) (1 year) Doha, Qatar 2. Onshore Gas Development Phase 2 Project (OGDII) (1 years) UAE 3. QATAR GAS 2, 3 & 4 expansion Projects. (6 years) Doha, Qatar 4. Ras Lafan LNG Facilities Project (RLL). (3 years) Doha, Qatar 2. PIPE LINES Projects
1. RMSGP SWEET GAS PIPELINE PROJET (1year) Doha, Qatar 2. Gas Sweetening facilities Project and pipe line (3 years) Doha, Qatar 3. Petrochemical Projects
1. Qatar Chemical Company Project (Q-CHEM) (1.5year) Doha, Qatar 2. Qatar Vinyl Company Project (QVC) (1 year) Doha, Qatar 4. Infrastructure and Buildings Project
1. KHALEFA Stadium Project (KSH) (1 year) Doha, Qatar 2. Qatar Polyethylene Facilities (QAPCO). (1 year) Doha, Qatar OMAR AL-ZOUBI, PMP®
TEL-+1-780-***-**** E-MAIL *************@*****.*** PAGE 2 OF 5
1. SHELL CANADA, PROJECT AND TECHNOLOGY JAN 2014 TO PRESENT CALGARY, CANADA o HEAVY OIL SAND PORTFOLIO,
Project Control Analyst: Benchmarking Engineer:
Benchmarking system delivery, including data collection, analysis, visualization by Fire spot to provide norms and ratio of cost, schedule, and other parameters
Perform external Benchmarking with Independent Projects Analysis (IPA) for every project gate phase
Perform benchmarking analysis with Construction Owner Alberta Association (COOA/CII
Prepare close out of projects and collaborate in the Global benchmarking system of Shell data base.
Project Control analyst, support cost management, scheduling, and progress monitoring system
Provide support for estimate, and project execution team based on historical data of portfolio
Plan, organize, and perform external benchmarking with various companies in the market based on certain study requirements
Continuous update and development of project control procedure and alignment to benchmarking requirements
Provide benchmarking training and implementation in projects
Project top quartile plan delivery
FEEL index and Project Control Index Calculation 2. TECHNIP
o Qatar Polyethylene Facilities EPC (QAPCO). (90 Million USD ) June 1994 – June 1995 Doha, Qatar Mechanical Engineer Site: Responsible for:
Preparation of field piping isometrics, shop drawing, material takeoff, high frequency pipe bending calculations, and as built drawing.
provided technical and engineering support to site at execution phase
prepared pipe line designation table for testing and operation process based on piping and instrumentation diagram (P & ID)
Shut down job cards preparation, scheduling and coordinate of Hot tapping tie in works
Preparation of piping system for startup (Blowing/flushing/and cleaning circuits for piping system).
3. CONSOLIDATED CONTRACTOR INTERNATIONAL COMPANY (CCIC) o Gas sweetening facilities Project. July 2010 to Nov 2013 Doha, Qatar Contract Value: USD. 660,000,000
Main contractors: Petrofac International Limited
Project Owner: Qatar Petroleum
Project Controls Manager: Responsible for:
Subcontract & Contract: Subcontract selection and award, Subcontracting strategy and alignment with business plan. Negotiating subcontract terms and conditions.
Cost Control & Scheduling: Budgeting & project cost report review and approval, Review and approve project scheduling and resources loading
Interface Management: Coordination and preparation of business plan, Pool resources management and allocation to work packages, Performance review and project excellence, KPI and project control index (PCI) establishment and calculation
Project Reporting: Yearly portfolio reporting for resources (budgeting, cost estimate, expenditures), cost performance and project performance improvements initiative, Resources planning for mobilization and demobilization plan, Technical and commercial project review and analysis.
o QATAR GAS 3 & 4 LNG Expansion Projects. Dec 2008 to June-2010 Doha, Qatar Contract Value: USD. 1,491,920,000
Main contractors: Chiyoda/Technip Joint Venture
Owner: Qatar Gas Company
Deputy Project Controls Manager: Responsible for:
Subcontract & Contract: detailed review & study of Contract documents to ensure thorough understanding of Contract requirement & contractual obligations/rights. Prepare work packages for subcontractors, negotiate subcontracts terms/condition & claims
Cost Control & Scheduling: Budgeting & forecasting cost at completion, lead a team providing planning, progress monitoring & cost control services. Manage invoicing procedure (Milestones & Progress payments). Monitoring scope of work, and evaluation of cost and time impact on different work packages
Field Engineering Services: Leading mobilization task for temp site facilities/camps including design & material procurements, Manage field Eng.(detailing) for various disciplines, Issue an weekly productivity reports and highlighting deficiencies thereof. Quantity surveying strategy in line with project BOQ for billing & procurements purposes OMAR AL-ZOUBI, PMP®
TEL-+1-780-***-**** E-MAIL *************@*****.*** PAGE 3 OF 5
Warehousing & Procurements: Prepare Procurement Plan for permanent & consumable material, Directing stores strategy to maintain Min. stock principle, Material reconciliation strategy & store work flow
o QATAR GAS II LNG Project. Oct-2005 to Dec-2008 Doha, Qatar Contract Value: USD. 1,491,920,000 (Main Subcontractor) Main contractors: Chiyoda Technip Joint Venture
Owner: Qatar Gas II, 3 & 4
PMC Sr. Project Engineer (Office): Responsible for:
Piping System (Hydrotest, Drying, Steam Blowing, Boxing)
Chemical cleaning/ Lub-Oil flushing/ Leak test work/ Air _N2 drying work packages preparation for subcontracting
Ensure that the system is properly checked, tested and all check sheets and test sheets are properly filled out and signed off for necessary completion and obtaining MC certificates
Ensure that the piping pre-commissioning and commissioning activities are properly organized, scheduled and conducted in a structured and safe manner in accordance with the requirements set out in the project specifications, drawings, procedures, method statements and quality plans.
Prepared daily and weekly reports to Commissioning Manager for all precom activities covering system, subsystem, tags, ITR, MC, punch list tracking.
Reviewed isometrics, P & ID, line list to ensure matching and eliminate discrepancies in the final handover documents for project turn over
Liaise with various departments & Client to ensure compliance of mechanical completion, documentation and hand over to commissioning using WINPCS application for turnover Ras Laffan To Mesaeed Sweet Gas Pipeline Project (EPC) Nov 2004-Oct 2005 Doha, Qatar Contract Value: USD. 95 million (EPC Contract)
Owner: Qatar Petroleum
Engineering & Procurement Manager: Responsible for
Reviewed design drawings according to site condition and providing feedback to home design office using Value Engineering techniques and constructability at site.
Reviewed pipe line and associated facilities design drawings using ASME applicable codes
(ASME 31.8), and pressure vessels design using API 598 codes (fuel tanks) for compliance
Prepared method statements, specification, and procedure documents.
Provided technical and engineering support to construction works at site.
Permanent material procurements and material selection/approval (include pipe line pigging )
Technical and commercial assessment for vendors and suppliers
Managed various subcontractors at site, i.e. insulation & fireproofing, painting, cladding, tanks fabrication, and misc.
o KHALEFA Stadium Project (KSH) Feb2004-Aug 2004 Doha, Qatar Contract Value: QR. 524 millions
Owner: Sports City Development Committee
Sr. Project Engineer Control (Steel Structure): Responsible for:
Structural Steel Fabrication Shop supervision for work flow, priorities, Optimization and automation
Controlled material logistics, shipment receive, issue, and reconciliation
Setting up a system by using STRUCAD software to extract quantities which used for QS and billing purposes and for planning for scheduling
Steel structure cutting plan optimization using 2D Cutter software for material waste control
Steel structure material selection and approval based on market availability o QAPCO4 Expansion Project June -2002- Jan-2004 Doha, Qatar Contract Value: $175 millions
Client, Qatar Petrochemical Company
Main Contractor: Krupp Uhde Com.
Project Control Engineer: Responsible for
Preparation of project budget codes (chart of account)
Monitored of project budget allocation, cost analysis, preparing cost overrun reports, and project cash flow
Preparation and updating of project invoicing.
Produced monthly cost report and forecasting the project man-hours and equipment Cost to completion.
Following up project change order; proposal, evaluation, and approval
Estimating & budgeting additional work change orders.
Prepared construction productivity report and provide analysis, recommendation, and variance analysis.
OMAR AL-ZOUBI, PMP®
TEL-+1-780-***-**** E-MAIL *************@*****.*** PAGE 4 OF 5
o Qatar Chemical Company Project (Q-CHEM) Nov-2000- June-2002 Doha, Qatar Contract Value: $257 millions
Client: Qatar Petrochemical Company
Contractors: Brown & Root/ Technip JV
Planning Engineer: Responsible for
Develop, control, monitor, analyze and report on schedule related aspects for designated project using P3 application.
Establish and monitor progress, cost, resource loading, logic link, baseline plan for the project in accordance with Program Office processes
Capture project budgetary costs and resources in the plan to determine time phasing of expenditure and the total project budget.
Work with the Project Manager and the Project team to establish the project activities, cost and durations and ensure that these reflect project scope, constraints and commitments. Challenge as necessary to ensure compatibility and compliance.
Support the Client’s business planning process.
Challenging schedule and cost variances against the baseline plan with individual task leaders/contractors
Integrate 3rd party schedules and data into the overall project plan.
Contribute to progress meetings, as required, in support of the Project Manager.
Establish robust Work Breakdown in terms of project scope. o Qatar Vinyl Company Project (QVC) Feb-2000- Nov-2000 Doha, Qatar Contract Value: $110 millions
Client: Qatar Petrochemical Com.
Main Contractors: Krupp Uhde & Technip- Italy
Office Engineer Mechanical/Piping: Responsible for:
Setting up engineering applications for piping Isometrics and plot plan extraction from 3D PDMS system and pressure testing
Procured material for pipe supports fabrication, building plumbing systems.
Generated piping isometrics drawings by extracting coordinates from GA and producing spool shop drawing
Releasing spools and pipe supports for fabrication
Monitoring fabrication status and progress of fabrication shop
Coordinated with the client for all technical and engineering issues. o Onshore Gas Development Phase 2 Project (OGDII) April-1999- Feb-2000 UAE Contract Value: $1.3 Billions
Client: ADNOC
Main Contractors: Joint Venture TECHNIP/BECHTEL
Mechanical Engineer (Plant shut down Site Coordinator) Responsible for:
Shut down execution packages preparation (Job Cards) for piping system, mechanical equipment, electrical and instrumentation, and pre-commissioning Packages.
Supervised shut down execution work including dismantling of existing piping system, revamping of old equipment and modifying existing steel structure, Hot Tapping.
Preparation of piping system for startup: Blowing/flushing/cleaning of piping system o Ras Lafan LNG Facilities Project (RLL). June1996- April-1999 Doha, Qatar Contract Value: $400 millions
Client: Ras Gas Company RLL
Main Contractors: JGC-KELLOG JV
Mechanical Engineer Site: Responsible for:
Prepare method statement and JSA for job execution (mechanical and piping disciplines)
Plan and execute the Installation of LNG plant facilities including: Piping system, equipment’s (static and rotating), steel structure, tanks, skids, modules
Manpower management and allocation at site
Monitoring of labour production and producing daily productivity report.
Ensure compliance with safety regulation, project specification and quality plan
Coordinated equipment’s allocation and movement in fabrication shops
Preparing of P & ID system limits and breakdown to test loops
Following welds repair, closing NCR, & troubleshooting technical problems at site
Prepared red line as built for isometrics, plot plan, underground utilities and steel structure OMAR AL-ZOUBI, PMP®
TEL-+1-780-***-**** E-MAIL *************@*****.*** PAGE 5 OF 5
o Qatar Liquid Gas Project (QLNG). July.1995- June-1996 Doha, Qatar Contract Value: $180 millions
Owner: Qatar Gas Main Contractor: CHIYODA CORP.
Site Engineer Piping: Responsible for:
Preparation of shop drawing, material takeoff, high frequency pipe bending calculations, shortage material list and as built drawing at the fabrication yard
Monitoring fabrications shop activities and ensured compliance with standard and project specification
Released spools and pipe supports for fabrication and set priorities
Ensured safety compliance and smoothness of material movement at the fabrication yard PROFESSIONAL MEMBERSHIPS
APEGA
Project Management Institute
INSEAD executive management
LANGUAGES
• Fluent in English, and Arabic.
PERSONAL INFORMATION
• Marital Status - Married