Post Job Free
Sign in

Engineering, Manufacturing, Business Analyst

Location:
Canton, IL, 61520
Posted:
January 20, 2016

Contact this candidate

Resume:

Scott E. Yerbic

**** *. ******

Canton, IL *****

309-***-****

EDUCATION

Bachelor of Science Industrial Technology, Western Illinois University, Macomb, Illinois, May 1998

EXPERIENCE

Weatherford International, Houston, TX Global Technology Support Manager Aug 2008 to Dec 2015

Gatekeeper for all Chemical products

Responsible product lines; Engineered Chemistry and Pressure Pumping

Developed and Implemented approval process for all Chemicals

Link between; Sales, Supply Chain, Product Line Managers, R&D, Product Safety, Regulatory, Trade Compliance, Health & Safety, Environmental, Quality, Engineering, and Manufacturing

Creation of new products (Manufactured or Purchased) and formulation changes were done using Windchill (PTC)

Review all information submitted for chemicals for compliance.

Responsible for maintaining list of approved products from suppliers for all raw materials.

Give weekly reports to Managers on status of products in approval process

Collect data for each product to determine delays to approve chemicals to manufacture

Audit each group in approval process to number of days to approval and how to reduce issues.

Set-up Manufacturing locations in JD Edwards once products are approved for manufacture.

Worked remotely from home successfully since August 2010

eServ, A Perot Systems Company, Peoria, IL PDM Administrator Aug 2005 to Aug 2008

Windchill (PTC) Administrator

Lead contact for Production Support for Windchill.

Responsible for writing Engineering Procedures for Windchill.

Troubleshoot user interface problems and diagnose errors for user community.

Set-up Organizations, users and groups accesses within their roles.

Train users on the Windchill functionality

Assist with Quality Team to make sure engineers follow the Quality Plan in Windchill.

Manage eOps Center and organize customer presentations

Worked with Windchill 7, 8, and successfully tested Windchill 9.

Weatherford International, Houston, TX Business Analyst Nov 2002 to Aug 2005

Windchill (PTC) Global Administrator for Weatherford International.

Lead contact for Production Support for Windchill.

Responsible for writing Engineering Procedures for Windchill.

Troubleshoot user interface problems and diagnose errors for user community.

Analyze Engineering processes to conform to business processes in Windchill.

Train users and local administrators on the Windchill functionality.

Help coordinate process between Windchill and JD Edwards One World.

Set-up user and group access for roles within the organization.

Supervise subject matter experts during cleansing of legacy information and systems.

Responsible for validations of legacy system for clean up before Windchill loading.

Analyze multiple product line to develop product tree structure.

Used Allowed Values Tool to handle data constraints to load into Windchill.

Traveled to location for implementation project assistance.

Johnson Screens, Inc., A Weatherford Company, Galesburg, IL & Wytheville, VA Product Engineer Sept 2000 - Nov 2002

Product Engineer for two locations, Galesburg, IL and Wytheville, VA.

Designed welded screens for Mining, General Industry, and Water Process market groups.

On-site Engineering Manager; direct client interaction; ensure all customer commitments met.

Key Engineering resource to establish product standards and cost data.

Calculated loading, stress, and deflection for screen applications utilizing MathCAD.

Developed product drawings utilizing AutoCAD 2000 and Mechanical Desktop.

Plant Layout Team Coordinator for Product flow improvements.

Shop floor work cell coordinator for corporate cost cutting projects.

Hands on shop floor experience needed for multi project duties.

Coordinated production meetings for plant manager, sales, purchasing, and engineering.

On-site Quality Manager responsible for implementing and coordinating reports/ISO 9000 audits.

Used JD Edwards World for Engineering part number, BOMS, Routers, and Inventory Control

Dove Equipment Co., East Peoria, IL Project Engineer Apr 1999 – Sept 2000

Designed fluid painting systems for: Case, John Deere, United Airlines, and Caterpillar.

Responsible for a wide variety of projects including: fluid, electrical, and pneumatic designs.

Responsible for project coordination / supervision / training with on-site installers and customers.

Utilized RS Logic 500 for PLC programming and AutoCAD Lt97 for drawings.

Responsible for purchasing and expediting project materials.

Provided direct project status reports to the Vice President of Engineering.

General Electric, West Burlington, IA Engineering Intern Jan 1998 – Dec 1998

Responsible for improving processes to achieve ISO and 6 Sigma quality in Shipping & Receiving.

Implemented a Freight Claim procedure to process claims regarding transportation companies.

Provided Cycle count analysis where work-in-process data is determined for quantity and location.

Coordinated supply meetings for shop floor personnel.

Tracked and analyzed shop orders to minimize open orders and to meet customer request dates.

Revised and documented Purchasing procedure documents.

REFERENCES:

Available upon request



Contact this candidate