Date:Oct-**
COVER LETTER
Dear Sir!
I have done INDUSTRIAL & MANUFACTURING ENGINEERING from University of Engineering & Technology, Lahore. I came to know about the vacancy in your organization from a reliable source. I would like to begin employment with an organization in which my effective performance will fulfill your organizational requirements.
I am proficient in the use of various automated solutions including current releases of
Matlab, Auto CAD, Solid Works. I had done industrial visits during my study period which includes following industries
1.Visit to study manufacturing of Tetra Pak, LHR.
2.Visit to study manufacturing of Surgical Instruments, Sialkot.
3.Visit to Heavy Mechanical Complex,Texila.
4.Visit to Shezan,Hattar.
5.Visit to KSB Pumps,Hasan Abdal.
6.Visit to Kohinoor Textile Mills LTD,Rawalpindi
I have applied classroom learning to innovative and esteemed organizations.
In Millat Tractors Ltd, Railways work shop. Where I got awareness of industrial environment and tried my best to gather sound knowledge of field study in different shops of these well-reputed firms as Tractor Assembly shop, Machine Shop & Maintenance, Heat treatment shop, NDT laboratory.
Thank you for taking a moment to consider my application. I look forward to hearing from you.
Sincerely,
KHAWAR ZAMAN
S/o Muhammad Rafaqat
181 Street #B/1121 Catholic Church
Kot Kamboh Lahore.
acs38r@r.postjobfree.com
KHAWAR ZAMAN
Industrial & Manufacturing Engineer/ Mechanical Engineer
Profile:
I am a flexible and ambitious engineering graduate with proven skills and understanding of engineering concepts, ability to deliver assigned jobs on time, skill of managing stress situations efficiently.
Personal Info:
Address: 181 Street # B/1121 Catholic Church Kot Kamboh Bund Road LHR
D.O.B: 10.10.1987
TEL#: +92-334-*******
N.I.C#: 35202-4523652-3
Email: acs38r@r.postjobfree.com
Education:
MS. Industrial Engg.(U.E.T Lahore) 2013 Result Awaiting
BSc. Industrial & Manufacturing. 2011 3.56/4
Engg. (U.E.T Lahore)
Intermediate(BISE Lahore) 2007 81.00%
Matriculation (BISE Lahore) 2004 78.24%
Certifications & Trainings:
Development Course for Supervisors. PIM
Trigger your performance for achieving peak performance PITAC
Reliability Centered Maintenance(RCM) IRCM
Building High performance team. Lead. Edge
Level-5 Leadership. MEL
Semester projects:
Designing & Fabrication of Bending Die.
Desiging & Casting of Bike Brake Handle.
Comprehensive study of Adhesive Bonding
Final Year Project:
Characteristics analysis of rapid Prototyping by using MIG welding
Under the super vision of Prof. Dr. Pervaiz Mughal (UET Lhr)
Internships:
4-weeks internship at MTL (Millat Tractors Ltd).
Areas Covered: Machine shop, Fabrication shop, Assembly Shop, NDT laboratory, Tool room.
4-weeks internship at Railways Engine workshops, Lahore.
Areas Covered: Engine Section, Pumps & Nozzle Section, Turbo Shop.
4- Weeks internship at U.E.T Power House.
Areas Covered: Planning, scheduling and monitoring of operation.
Work Experience:
Millat Equipment ltd (Dec-11 to Present) ~3.9 Yrs
Quality Assurance Deptt. (June-13 to Present)
Implementing of ISO-9001.
Implementation of SPC on critical machinery.
Calculating OEE, Quality factor of lower reliability machines.
Conducting Vendor visits.
Assuring Supplier Quality Control(SQC).
Root cause analysis of major field & line rejection.
Calibration of Gauges acc. to BS standard.
Gauge and Instrument Calibration Control
Gauges and Instruments Procurement and Inventory planning
Statistical Data Analyst
Measurement System Analyst
Implementation of 7 Tools of Quality
SPC control Charts
Root Cause Analyst
Failure Mode and Effect Analysis (FMEA)
Engineering Metrology Lab Equipment Supervision
Gear Involute Profile Testers
Coordinate Measuring Machine (CMM)
Gear Roll Tester
Surface Analyzers
TQM and Lean Trainer
Projects.
Designing and fabrication of Over Pin Dia Measuring Gauge for the measurement of Dia Over two pins of Spur Gears
Measuring the effect of Repeatability and Reproducibility on Process variation using Measurement System Analysis (MSA)
Line Balancing through time and motion study for overtime reduction and effective utilization of man power.
Gauge Size Calculator Design for Plug and Caliper type of gauges as per BS 969 Standard
Gauge and Instrument Calibration system Design for ERP
Productivity Enhancement through effective implementation of Lean Techniques.
Broach Design for Gears and couplers
Maintenance Deptt. (Dec-12 to June-13)
Maintaining cooling tower efficiency & cooling rate.
Assuring quality & un-restricted supply of Utilities to process facility.
Designing Piping network against newly developed work station.
Development and Refurbishment of machinery.
Conducting breakdown, preventive & corrective maintenance.
Development of hydraulic circuits and heat exchangers.
CAPEX proposal drafting and implementation.
Planning & Documentation (MTTR & %DT reduction).
Production Dept. (Dec-11 to Dec-12 )
Planning and monitoring Production Targets.
Line balancing, inventory management, buffer stock calculation
Looking after Line staff and handling machine and production related issues
Focusing on new advancements in manufacturing techniques and tooling.
Waste reduction awareness and techniques implementation to increase efficiency.
Projects.
Designing and fabrication and procurement of Magnetic conveyor for removal of swarf from bottom of Broach
Indexing of Hobbing Machine as well as Shaper Machine
Designing and Fabrication of Fixture for hobbing Machine to enhance the production of Spur Gears
Designing and Fabrication of Fixture for Shaper Machine to enhance the production of Internal Gears(Ring Gears)