EMPLOYEE’S NAME Roberto, Escoto Badato
Address :
Kepler st.Phase 4 block 407 lot 19 Heritage Hom0e Loma De Gato Marilao Bulacan
Contact Numbers :
Mobile : 091*-******* / 091*-******* / 092*-*******
Landline: 044-***-**-**
E-mail Address :
acs2dl@r.postjobfree.com / acs2dl@r.postjobfree.com
SUMMARY OF QUALIFICATIONS
21+ years solid experience in Rigging, Erecting, Heavy Lifting and Slinging in the Oil & Gas And Power
Generation Industries
Extensive hands-on experience in various rotating equipment,Including General Electric Gas Turbines Frames Fr6B, Fr7E,Fr 91E & 9FA,and AN200 compressor
Westinghouse GT W501B4 and W501D5. 18KU Mitsubishi,14KUmitsubishi V type diesel engine
Can operate Gantry Crane, telescopic crane,Pay Loader and Heavy Duty Forklift.
Knowledge in using precession Measuring Instrument
3/2006 up to present Granite International Services Incorporated
GLOBAL MANPOWER DISTRIBUTION
Mechanical Technician (Certified Rigger)
HOT GAS PATH INSPECTION /MAJOR,MINOR INSPECTION of general electric gas turbine
Frame 6B General Electric
Frame 7E General Electric
Frame 91E General Electric
Frame9FA General Electric
AN200compressor novo pig none
Perform combustion major inspection GE GT Fr6B,7E,91E,9FA removing of fuel line, air manifold, pigtail
replacement of primary and secondary fuel nozzle, liner And Flow sleeve Transition piece, and
des-assembly, re-assembly of combustion can. Measuring of 6 point Clearance gap of T.P. Leap seal
Lifting of combustion wrapper, turbine casing,replacement of 1st., 2nd., and 3rd. Stage of nozzle segment
And 1st., 2nd., and 3rd. stage of shroud block. Replacement of transition piece, liner Primary and
secondary fuel nozzle Des- assembly re-assembly of flow sleeve, and combustion can.
Replacement of damage pig tail and checking for linked. Measuring of six point clearance gap of
T.P. leaps seal checking of rotor zero to rotor 17 stage blade tips clearance and stator 1 to stator 17 tips
clearance
Perform major inspection des-assembly and re-assembly GE GT 9FA lifting of exhaust side panel,
Turbine casing, outer combustion wrapper casing, forward & aft. Compressor casing, exhaust frame,
Exhaust diffuser, compressor discharge casing, inner compressor discharge casing, inlet casing,
Bearing housing #2, replacement of primary and secondary fuel nozzle, liner and Flow sleeve
Transition piece, and des-assembly, re-assembly of combustion can des-assembly and Re-assembly
Of air manifold, high-low pressure check valve, fuel line, pig tail, replacement of first stage
Nozzle assembly, Second and 3rd. Stage nozzle segment, 1st, 2nd. 3rd..stage of shroud block. Checking of
compressor stator blade
Tips from R1, S1 has found clearance checking of bearing clearance UN couple of turbine and compressor
Flange lifting of turbine and compressor rotor assembly.
1/1991-10/2005
Mirant Philippines corp. (formerly Southern Energy Phils., Corp)
Mechanical Specialist ( Philippines)
Company Profile : Independent Power Producer
4 x 30 megawatt MS6001B GEC Alston Gas Turbine Power Barges
5 x 30 megawatt MS6001B John Brown Engineering Gas Turbine Power Barges
3 x 70 megawatt W501B4 Westinghouse Gas Turbine
1 x 100 megawatt W501D5 Westinghouse Gas Turbine
4 x 3.75 megawatt 14KU Mitsubishi Diesel Engine
2 x 5 megawatt 18KU Mitsubishi Diesel Engine
DETAILED WORK EXPERIENCE
Performed a minor and major combustor inspection hot gas path and major overhaul inspection of four unit of GEC Alstom and five units John Brown Gas Turbine Power Barge.
Lifting of Gas Turbine part such as exhaust frame, exhaust baffle, Turbine casing, Combustor Chamber, Compressor casing, Inlet guide vane, Air intake duct.
Disassembly and reassembly of Gas Turbine Bucket, Shroud Block.
Checking of load gear and bearing
Performed a minor and major combustor inspection, Hot Gas path and major overhaul inspections of 3 units W501B4, 1 unit W501D5 Gas Turbine
Lifting of Gas Turbine part such as exhaust stack, exhaust strut, Turbine extension, Turbine casing, Blade ring., Combustor casing, Compressor casing, Inlet Guide Vane, Air intake manifold, Turbine and Compressor Shaft, and Generator rotor.
De-blading and re-blading of compressor blade from low pressure to high pressure
Alignment of starting motor and triple S clutch
Disassembly and reassembly of compressor diaphragm
Disassembly and reassembly of vane segment and inter stage seal
Disassembly and reassembly of combustor basket, Transition piece, clam, shell, fuel nozzle assembly.
Performed operation and maintenance work.
Re-conditioned fuel nozzle assembly.
Overhauling of 14KU Mitsubishi Diesel Engine.
Top overhauling of piston and replacement of O-ring
Replacement of Cam Shaft Bearing
Replacement of Cam Shaft
1.
Position :
Mechanical technician
Duration :
06-2015 / 06-2015
Company :
Granite services international inc.
Customer :
Onee power plant
Location :
Maroc morocco
Project :
General electric
Job Description :
Hot gas pot inspection of 9E GE GAS TURBINE
2.
Position :
Mechanical technician
Duration :
05-2015 / 05-2015
Company :
Granite services international inc.
Customer :
CPC Rades 2, Tunisia
Location :
Republic of Tunisia
Project :
General electric
Job Description :
Hot gas pot inspection of 1x9E GE GAS TURBINE
3.
Position :
Mechanical technician
Duration :
11-2014 / 03-2015
Company :
Granite services international inc.
Customer :
Sabija power station
Location :
State of Kuwait
Project :
General electric
Job Description :
Major overhauling / hot gas pot inspection 4x9FA GE GAS TURBINE
4.
Position :
Mill Wright
Duration :
05 / 2014 - 06/ 2014
Company :
Granite services international inc.
Customer :
Qatar gas
Location :
Doha Qatar
Project :
General electric novo pignone
Job Description :
Modular replacement frame 6
5.
Position :
Mechanical technician
Duration :
02 / 2013 - 04 / 2013
Company :
Granite services international inc.
Customer :
Sabija power station
Location :
State of Kuwait
Project :
General electric
Job Description :
Performed combustor inspection of 3X 9FA G E gas turbine
6.
Position :
Mechanical technician
Duration :
09 / 2012 - 11 / 2012
Company :
Granite services international inc.
Customer :
Hajret power plant
Location :
Republic Algerienne Democratique Populaire
Project :
General electric
Job Description :
Performed major over hauling of 9FB G E gas turbine and G E generator
7.
Position :
Mechanical Technician/ Rigger
Duration :
10/2011-12/2011
Company :
Granite Services International Inc
Customer :
Fujairah SembCorp Power Plant, U.A.E
Location :
Fujairah U.A.E.
Project :
General Electric
Job Description :
Performed heavy lifting, slinging works during Combustion Inspection on x2 units of GE GT Fr91E & wet tie repair
8.
Position :
Mechanical Technician/ Rigger
Duration :
9/2011-10/2011
Company :
Granite Services International Inc
Customer :
Bir M’Cherga, Tunisia
Location :
Republic of Tunisia
Project :
General Electric
Job Description :
Performed heavy lifting, slinging, & rigging works during Hot Gas Path Inspection of GE GT Fr91E
9.
Position :
Mechanical Technician/ Rigger
Duration :
5/2011-6/2011
Company :
Granite Services International Inc
Customer :
Phu My 2-2 Power Station, Vietnam
Location :
Vietnam
Project :
General Electric
Job Description :
Performed Major Inspection of GE GT Fr9FA
10.
Position :
Mechanical Technician/ Rigger
Duration :
4/2011-5/2011
Company :
Granite Services International Inc
Customer :
Sur Muscat LNG- Oman
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
Performed heavy lifting and rigging works during Bearing inspection of 3MCL 1004 + Siemens Compressor inspection
11.
Position :
Mechanical Technician/ Rigger
Duration :
3/2011-4/2011
Company :
Granite Services International Inc
Customer :
Al Taweelah A1 Cogen/ Desal Plant, U.A.E.
Location :
U.A.E.
Project :
General Electric
Job Description :
Performed heavy lifting, slinging, and rigging works during Major Inspection of GE GT Frame91E
12.
Position :
Mechanical Technician/ Rigger
Duration :
3/2011-3/2011
Company :
Granite Services International Inc
Customer :
Al Taweelah A1 Cogen/ Desal Plant, U.A.E.
Location :
U.A.E.
Project :
General Electric
Job Description :
Performed heavy lifting, slinging, and rigging works during GT 17 Combustion Hot Air Leak
13.
Position :
Mechanical Technician/ Rigger
Duration :
1/2011-3/2011
Company :
Granite Services International Inc
Customer :
Fujairah SembCorp Power Plant – U.A.E.)
Location :
Fujairah U.A.E.
Project :
General Electric
Job Description :
Performed heavy lifting, slinging, and rigging works during Major Inspection of GE GT Fr9E + water cooled check valves & tubing.
14.
Position :
Mechanical Technician
Duration :
11/2010-12/2010
Company :
Granite Services International Inc
Customer :
Sembcorp Sakra Cogen – Singapore
Location :
Singapore
Project :
General Electric
Job Description :
Performed Major Inspection of GE GT Fr9FA
15.
Position :
Mechanical Technician/ Rigger
Duration :
1020/10-10/2010
Company :
Granite Services International Inc
Customer :
Al Kamil Power Station – Muscat, Oman
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
Performed heavy rigging and lifting works during Combustion Inspection of GE GT Fr9E
16.
Position :
Mechanical Technician
Duration :
9/2010-9/2010
Company :
Granite Services International Inc
Customer :
Piltun – Astokhskoye – B (PA-B) Platform, Sakhalin
Location :
Sakhalin Russia
Project :
General Electric
Performed Internal Transition Piece Change – Out.
17.
Position :
Mechanical Technician
Duration :
6/2010-7/2010
Company :
Granite Services International Inc
Customer :
Sakhalin II- Yuzhno, Sakhalin, Russia
Location :
Sakhalin Russia
Project :
General Electric
Job Description :
Performed LNG Combustion Inspection of MS7001EA on Train#1
18.
Position :
Mechanical Technician/ Rigger
Duration :
2/2010-3/2010
Company :
Granite Services International Inc
Customer :
Fujairah Power Plant – U.A.E.
Location :
Fujairah U.A.E
Project :
General Electric
Job Description :
Performed slinging and heavy lifting on CI of GE GT Frame91E + water cooled check valves + tubing.
19.
Position :
Mechanical Technician/ Rigger
Duration :
11/2009-12/2009
Company :
Granite Services International Inc
Customer :
Fujairah Power Plant –U.A.E.
Location :
Fujairah U.A.E
Project :
General Electric
Job Description :
Performed major slinging and heavy lifting on Major Inspection of GE GT Frame91E x2 units.
20.
Position :
Mechanical Technician/ Rigger
Duration :
9/2009-10/2009
Company :
Granite Services International Inc
Customer :
Sur Muscat LNG, Oman
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
AN200 compressor shutdown
21.
Position :
Mechanical Technician/ Rigger
Duration :
6/2009-7/2009
Company :
Granite Services International Inc
Customer :
LNG Sur Oman, Muscat
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
Performed Major Overhauling of GE GT Fr6B
22.
Position :
Mechanical Technician/ Rigger
Duration :
3/2009-5/2009
Company :
Granite Services International Inc
Customer :
LNG Sur Oman, Muscat
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
Performed Hot Gas Inspection on GE GT Frame6 and Frame7
23.
Position :
Mechanical Technician
Duration :
2/2008-5/2008
Company :
Granite Services International Inc
Customer :
North Cairo power plant, Egypt
Location :
Egypt
Project :
General Electric
Job Description :
Planned Combustion Inspection of Frame 9FAs.
Assigned as Overhead Crane Operator for Heavy Lifting GT Modules, Rotor of Frame 9FA.
24.
Position :
Mechanical Technician / Rigger
Duration :
11/2007-12/2007
Company :
Granite Services International Inc
Customer :
Bouchemma Power Station, Tunisia
Location :
Republic of Tunisia
Project :
General Electric
Job Description :
Performed Major Inspection of GE Frame 9E Gas Turbine including Generator Inspection and BOP on Turbine Auxiliaries.
25.
Position :
Mechanical Technician
Duration :
9/2007-11/2007
Company :
Granite Services International Inc
Customer :
CPC Rades 2, Tunisia
Location :
Republic of Tunisia
Project :
General Electric
Job Description :
Performed Major Inspection of Frame9E GE Gas Turbine, BOP and auxiliary works.
Assigned as Overhead Crane Operator for Heavy Lifting GT Modules, Rotor of Frame9E
26.
Position :
Mechanical Technician
Duration :
8/2007-8/2007
Company :
Granite Services International Inc
Customer :
Feriana, Tunisia
Location :
Republic of Tunisia
Project :
General Electric
Job Description :
Performed Hot Gas Path Inspection of GE GT Frame9E
27.
Position :
Mechanical Technician / Rigger
Duration :
4/2007-5/2007
Company :
Granite Services International Inc
Customer :
Shell Muscat Sur, Oman
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
Performed Combustion Inspection of GE GT Fr6 &Fr7
Performed Major Inspection of AND Compressor of GE GT Fr6
Performed Minor Inspection of AN200 Axial compressor
28.
Position :
Mechanical Technician/ Rigger Foreman
Duration :
1/2007-2/2007
Company :
Granite Services International Inc
Customer :
GECAD / Takoradi Thermal Power Plant, Ghana)
Location :
Ghana Africa
Project :
General Electric
Job Description :
Performed Hot Gas Path Inspection of GE Gas Turbine Frame 9E.
Performed Gas Conversion of x1 unit of GE GT Frame 9E
Performed rigging and slinging works.
29.
Position :
Mechanical Technician/ Rigger
Duration :
11/2006-12/2006
Company :
Global Turbine Services Inc
Customer :
Shell Muscat Sur, Oman
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
Performed GE Oil & Gas Major Inspection of Frame6B GE Gas Turbine.
30.
Position :
Mechanical Technician/ Rigger
Duration :
10/2006-10/2006
Company :
Global Turbine Services Inc
Customer :
Baymina Power Station, Ankara, Turkey
Location :
Turkey
Project :
General Electric
Job Description :
Performed Hot Gas Path Inspection of GE GT Frame9FA.
Performed rigging works
31.
Position :
Mechanical Technician/ Rigger
Duration :
7/2006-9/2006
Company :
Global Turbine Services Inc
Customer :
CPC Rades, Tunisia
Location :
Republic of Tunisia
Project :
General Electric
Job Description :
Performed Major Inspection of GE GT Frame9E
Performed rigging & slinging works
32.
Position :
Mechanical Technician/ Rigger
Duration :
4/2006-5/2006
Company :
Global Turbine Services Inc
Customer :
GE Oil & Gas – Shell, Oman
Location :
Sultanate of Oman
Project :
General Electric
Job Description :
Performed major rigging jobs and rigging supervision during Major Inspection of Fr7E and Fr6B GE Turbine
33.
Position :
Mechanical Technician/ Rigger
Duration :
3/2006-3/2006
Company :
Global Turbine Services Inc
Customer :
GECAD / Takoradi Thermal Power Plant, Ghana
Location :
Ghana Africa
Project :
General Electric
Job Description :
Performed Combustion Inspection of GE GT Fr9E
Performed rigging works and slinging
34.
Position :
Mechanical Specialist 1
Duration :
1/1991-10/2005
Company :
Southern Energy Phils., Corp(formerly) H-H Hopewell Holding
Mirant Philippines power corp.
Company profile
Independent Power Producer
Location :
Philippines
Project :
Gas turbine Westing house /power barge gec alstom
Job Description :
Operations and Maintenance
TRAININGS / SEMINARS ATTENDED
DATE
COURSE TITLE / TOPIC
April 2013
Basic Mechanical Skills
Asia Training Center – Manila, Philippines
April 2013
Riverhawk Gas Turbine & Steam Turbine Stud Tensioning Training
Asia Training Center – Manila, Philippines
April 2013
Safe Bolting: Principles and Practices
(8 Hour HYTORC Course with practical)
Instruction given in cooperation with Granite Services
International, Inc. Manila, Philippines
April 2013
THE Granite Services – ITH Bolt Tensioning Tooling Safety and Operation course
Asia Training Center – Manila, Philippines
January 2012
Hytorc Bolting Technology
GSII Philippines, Makati City, Philippines -
November 2010
Signalmen course
( REF No: 008-***-*****)
Ministry of Manpower, Singapore
November 2010
Riggers Courses
( REF No: 008-***-*****)
Ministry of Manpower, Singapore
January 2009
Rigger B +
Phil-Asia Technical Consultant & Gen. Services, Inc
Manila, Philippines
January 2009
Hydraulic Crane Operator B +
Phil-Asia Technical Consultant & Gen. Services, Inc
Manila, Philippines
January 2006
Heavy Equipment Operator
( RIGGER – GENERAL II)
1.Rigging and Derrigging Crane
2.Performing Load Handling
3.Preparing Rore/Cable for Connection/Attachment
4.Repairing and Maintaining Rigging Gears
TECHNICAL EDUACTION AND SKILLS DEVELOPMENT AUTHORITY
January 2006
Heavy Equipment Operator
( TRUCK MOUNTED CRANE)
1.Performing Pre-Operation/post Operation Procedure
2.Mobilizing/Demobilizing truck Mounted Crane
3.Performing Productive Operation
4.Performing Daily Preventive Maintenance
TECHNICAL EDUACTION AND SKILLS DEVELOPMENT AUTHORITY
January 2006
RIGGER (GENERAL)
(Written and Practical Test)
ASSOCIATION OF CARRIERS & EQUIPMENT LESSORS, INC
Pasig City Philippines
January 2006
TRUCK MOUNTED CRANE OPERATOR (CLASS B)
(Written and Practical Test)
ASSOCIATION OF CARRIERS & EQUIPMENT LESSORS, INC
Pasig City Philippines
July 2002
Crane Safety
Mirant Philippines, Navotas Power Station
July 2002
Rigging Safety
Mirant Philippines, Navotas Power Station
December 2003
Emergency Response Procedures
Mirant Philippines, Navotas Power Station
December 2003
2nd Inter Mirant Health & Safety Committee Conference
Mirant Philippines, Pagbilao Power Station
June 2002
Basic Life Support Training
(Community CPR)
The Philippine National Red Cross Safety Services
May 2002
First Aid Training
(Standard)
The Philippine National Red Cross Safety Services
June 2000
Fire Brigade Training
Navotas Power Station. Navotas M.M
March 2000
Fire Prevention and Industrial Safety
Philippine Society Of Mechanical Engineers
NCR Metro South Chapter
September 1999
Performance Management Program
Navotas, Metro Manila Philippines
March 1998
22nd NCR Regional Conference
Philippine Society of Mechanical Engineers
Pasay City, Philippines
September 1995
Forklift Safety Management
Philippine Society of Mechanical Engineers
Pasay City, Philippines
July 1994
Basic Water Safety and Rescue Training Course
Hopewell Group of Co.
Batangas City, Philippines
June 1993
Crane Safety Operation
Safety Organization of the Philippines, Inc.
Mandaluyong M.M.
EDUCATIONAL BACKGROUND
HIGHEST EDUCATION
Educational Level :
Third year
Course :
School / University :
Dep-ed department of education
Location :
Pasig metro manila
Year Graduated :
1993
PERSONAL DATA
Date of Birth :
JUNE 21 1960
Gender :
MALE
Civil Status :
MARRIED
Height :
5’5’’
Weight :
170lbs.
Nationality :
Filipino
Religion :
Catholic
Roberto E. Badato