Justin Potor

***-*** ********** ****** *******,M4C5M6,416-***-****

O

bjective

Looking for something to allow using my skills. Assistant Site Superintendent, Assistant Project Manager.

Career Overview

Over 17 years of experience in construction with a solid background in civil engineering. Areas of expertise include site management (production, safety and quality control) as well as layout.

Skills

Ability to analyze and interpret drawings and specifications

Strong communication and leadership skills.

Extensive experience to manage and schedule sub trades activities

Expertise in concrete structure, concrete and rebar log.

Expertise in site management

Excellent time management skills

Good computer skills using ACAD, Microsoft Office.

Flexible and able to work in a fast paced environment.

Extensive experience to manage and schedule sub trades activities

Proven ability to establish goals and set priorities

Ability to work well within teams

Excellent understanding of construction drawings, specifications, contract documents and equipment specifications.

Experience with survey equipment such as Total Station, Transit and Optical Level.

Used critical thinking and independent judgment to deal with unexpected situation.

English,Romanian,Spanish,German,Italian.

PROFESSIONAL EXPERIENCE

2015 April-present

SAS POINTLINE Toronto

Sr.Field Engineer

Project:”Beverly Hills” Richmond Hill. Providing Field Engineering services for AVENUE Company.

Tasks:

Making as-built drawings for all the slabs poured.

Assisting Site Superintendent giving solutions, information and do everything to ensure the work performed complying project standard requirements.

Ordering concrete, rebar log, verifying the quality of concrete

Preparing weekly reports for work performed

grid, construction, changes RFI and maintains and updates on site as-build drawings ensuring lines, levels, surveys, monitoring requirements, planning and coordinating according to the architectural the work is in compliance all the specification and standards.

Coordinated and controlled all shop drawing requirements from trades to ensure timely production and approval by consultants.

Identify & manage design problems proactively

Critically analyze drawings during construction and provide valuable engineering solutions to support efficiency & effectiveness

Completed concrete quantity take offs daily and managed the concrete while communicating with all the sub trades on the site

Placed reference lines in the building for use by the sub trades and ensured that the building is lined up properly.

2015 february-2015 april

STRABAG EUROPA-BUCHAREST

Site Manager

PROJECT:PARKVIEW LAKE BUCHAREST

Tasks:

Complying with the internal and ISO procedures, occupational protection, maintaining a constant relationship investor.

Approval of payments, drafting of estimates, work statements

Ordering concrete, rebar log, verifying the quality of concrete

Assessment of subordinated staff

Complying with the technical requirements, engineering processes, the quality and quantity requirements.

Supplying the site with materials, supervising the subordinated staffs in terms of meeting the requirement related to quality, quantity

The compliance with workplace safety, maintaining a close relationship with the Beneficiaries

Taking care of the correspondence on site

Taking part in meetings, appointments, as well as maintaining a close collaboration and staying constantly in touch with the authorities

2014 september-2015 February

CONARG AG Bucharest

Site Manager

Project: Commercial Building in Bucharest, located in Frunzei Street.

Tasks:

Complying with the internal and ISO procedures, occupational protection, maintaining a constant relationship investor.

Approval of payments, drafting of estimates, work statements

Ordering concrete, rebar log, verifying the quality of concrete

Assessment of subordinated staff

Complying with the technical requirements, engineering processes, the quality and quantity requirements.

Supplying the site with materials, supervising the subordinated staffs in terms of meeting the requirement Related to quality, quantity

The compliance with workplace safety, maintaining a close relationship with the Beneficiaries

Taking care of the correspondence on site

Taking part in meetings, appointments, as well as maintaining a close collaboration and staying constantly in touch with the authorities

2013-2014

SAS POINTLINE Toronto

Senior Field Engineer

Project:VIVA BUS FACILITY,Richmond Hill,Ontario.Antreprenor General:PCL.

A Maintenance and Storage Warehouse, over 50,000 sqm for VIVA BUS

Tasks:

Assisting Superintendent and Project Manager giving solutions, information and do everything to ensure the work performed complying project standard requirements.

Using Total Station, Optical Level, transit level and other measurements tools to perform layout. Perform surveying as well putting new targets, working points, setup new coordinates for points into Data Collector.

Making as-built drawings for whole work performed.

Plans, organizes, and directs work to provide valuable engineering solutions to support efficiency & effectiveness

2013

KENAIDAN CONTRACTING LIMITED Toronto

Field Engineer

Project: GO Train Weston Rd Toronto. A new railway for GO Train. A big infrastructure project, a 1500 meter railway -4 tracks and a 300 meter Tunnel.

Tasks:

Plans, organizes, and directs work to determine precise location and measurements of points, elevations, lines, areas, and contours for construction

Grid, construction, changes RFI and maintains and updates on site as-build drawings ensuring lines, levels, surveys, monitoring requirements, planning and coordinating according to the architectural the work is in compliance all the specification and standards

Using Total Station, Optical Level, transit level and other measurements tools to perform layout.

Making as-built drawings for all the slabs poured daily.

Assist Superintendent and Project manager giving solutions, information and do everything to ensure the work performed complying project standards requirements.

Ordering concrete, verifying the quality of concrete.

2011- 2013

SAS POINTLINE Toronto

Field Engineer

Project: Westwood Alterra, November 2012-June 2013 Islington. Developer – ALTERRA.

A six level residential building with 2 underground common parking level, over 18,500 sqm.

Tasks:

Using Total Station, Optical Level, transit level and other measurement tools to perform layout.

Making as-built drawings for all the slabs poured.

Assist Superintendent and Project Manager giving solutions, information and do everything to ensure the work performed complying project standard requirements.

Ordering concrete, verifying the quality of concrete

Prepare weekly reports for work performed

Detailed formwork layout for entire construction.

Plans, organizes, and directs work to determine precise location and measurements of points, elevations, lines, areas, and contours for construction

Ordering concrete and rebar log.

Grid, construction, changes RFI and maintains and updates on site as-build drawings ensuring lines, levels, surveys, monitoring requirements, planning and coordinating according to the architectural the work is in compliance all the specification and standards.

Project: Pier 27 Toronto, Downtown-Queens Quay. Oct 2011- Nov 2012. Developer-Dominus. Pier 27 features two mid-rise towers of 12 and 14 storeys topped with a three storeys cantilevered bridge connecting them that will contain the project’s penthouses. The towers will contain 477 suites. The buildings contain 4 parking storeys each one. Cca 50 meter high each building. Over 60,000 sqm area.

Tasks:

Grid, construction, changes RFI and maintains and updates on site as-build drawings ensuring lines, levels, surveys, monitoring requirements, planning and coordinating according to the architectural the work is in compliance all the specification and standards

Prepare weekly reports for work performed

Detailed formwork layout for entire construction.

Plans, organizes, and directs work to determine precise location and measurements of points, elevations, lines, areas, and contours for construction.

Keeps accurate notes, records, and sketches to describe and certify work performed

2009-2011

KOMPAKT ROHBAU GOTHA GERMANY

SITE SUPERVISOR

Project:”RECHENZENTRUM EUMETSAT DARMSTADT”.A control center for a satellite which will be launched in 2015 by the German Weather Forecast Company EUMETSAT, DARMSTADT. Worth 13.3 million euro. Cca 4,300 sqm area.

Tasks:

performing the work in terms of quality and quantity

Complying with the design, drawing up the monthly physical progress report as per the calendar schedule proposed by the German Contractor, the Leonhard Weiss company.

Supervising the teams of subordinated carpenters,steelmen,masons-35 people

Taking part in the on-site meetings with the Contractor and the Beneficiaries.

Calculating concrete quantities, ordering concrete, pouring concrete, organizing the pour schedule.

Drafting the monthly physical progress report complying with the technical description

Working alongside the General Contractor German.

Work performed: pouring concrete for all work(formwork, reinforcement, concreting),grounding, power equipment embedded in the walls, floors, ceilings, partition and supporting masonry

2008.

PEYBER HISPANICA ROMANIA

Construction Manager

Working within the technical department, a participant in the drafting of the technical documentation needed to participate in tenders in the field of infrastructure works. The company Peyber Hispanica is a reputable company from Madrid, with a wide range of works performed in the field of constructions. In Romania, the same is an investor and real estate development

2007

ARCONSTRUCT INTERMED BUCHAREST

SUPERVISOR

Project- “BERUFSAKADEMMIE MANNHEIM”,

The new wing of the UNIVERSITY OF CRAFTS OF MANNHEIM, a building with reading rooms, a library and an amphitheatre and a building with laboratories and classrooms. An 8.8 million euro investment

Performed the structure, concreting works (formwork, reinforcement, pouring concrete).

The main building – Ground Floor – 1st floor – 2nd floor; h = 14.5 m, S = 3,000 sq m, monolith, and the building with classrooms and laboratories– mixed structure: prefabricated and monolith; the beams and part of the pillars were prefabricated on site.

Two Liebherr cranes, h = 40 m, 2.5 tons at peak.

Both buildings had a general reinforced deck, h = 45 cm, on the second building, the deck was with prefab pre-slabs and concreting on top. On the other one, a monolithic slab, a SKYDECK formwork.

Tasks:

Drafting the monthly physical progress reports,

Complying with the technical prescriptions,

Performing the work in terms of quality and quantity, occupational protection,

Working alongside the General German Contractor(ZUBLIN), finding methods to save materials, protecting the environment, recycling material

Supervising the teams of subordinated carpenters,steelman,masons-33 people

Taking part in the on-site meetings with the Contractor and the Beneficiaries.

Calculating concrete quantities, ordering concrete, pouring concrete, organizing the pour schedule

Site safety and health improved: “ zero injury” culture

Project- “ONKOLOGIE KLINIKUM BRUCHSAL” GERMANY, .

A building with a Basement – Ground Floor – 2 floors; a total area of 2,500 square meters, a single crane. An 6.5 million euro investment.

Performed concrete structure, ( formwork, reinforcement, pouring concrete) and masonry with materials from the German General Contractor(MOSER).

Tasks:

complying with the technical requirements as per the technical design,

drafting the monthly physical progress reports, meeting the quality and quantity requirements.

supervising the teams of subordinated carpenters,blacksmiths,masons-19 people

taking part in the on-site meetings with the Contractor and the Beneficiaries.

calculating concrete quantities, ordering concrete, pouring concrete, organizing the pour schedule

Site safety and health improved: “ zero injury” culture

2006

VIAROM CONSTRUCT BUCHAREST

SITE MANAGER

Project:“AGRONUTRISCO BIRDS' SLAUGHTER HOUSE”, Mihailesti, Giurgiu County,

Works performed: landscape and structure, within the performance of a hall using concrete

prefabricated elements, with an area of 5,000 square metres, the development of the

outside concreted platforms for traffic. A hall made of prefabricated pillars and glass

foundations, a 1 m high perimeter beam. The earthworks and concrete platforms, performed using personal equipment and personnel.

Tasks:

Complying with the internal and ISO procedures, occupational protection, maintaining a constant relationship with the Lebanese investor

Responsibilities in terms of the transportation

Rental of equipment

Approval of payments, drafting of estimates, work statements

Assessment of subordinated staff

Complying with the technical requirements, engineering processes, the quality and quantity requirements

Supplying the site with materials, supervising the subordinated staffs in terms of meeting the requirement related to quality, quantity

The compliance with workplace safety, maintaining a close relationship with the Beneficiaries

Taking care of the correspondence on site

Taking part in meetings, appointments, as well as maintaining a close collaboration and staying constantly in touch with the authorities

2005

SC CALA TARGU MURES

SITE COORDINATOR

Project-Water pipes supply rehabilitation for INSTITUTE FOR NUCLEAR RESEARCHES OF MIOVENI and ROVINARI POWER PLANT

Work performed: Pipes Rehabilitation (Torkrets through the KonuSit German Proceeding) within the INSTITUTE FOR NUCLEAR RESEARCHES OF MIOVENI and ROVINARI POWER PLANT.

The rehabilitation of 180 mm diameter pipes by way of the inner torkret method (the German Konusit procedure), and the pipe supplying water to the cooling facility at the Institute of Nuclear Researches of Mioveni, Arges County.

The rehabilitation of 2000 mm diameter pipe at the Rovinari Thermal Power Plant.

The Konusit procedure consists of cleaning the pipes on the inside, video viewing, applying a coating layer of Konus plaster depending on the level of degradation found, and all of it with the help of winches, special robots and a concreting machine.

Tasks:

Coordinating the team, training them, viewing, making the final decision, essentially the entire work process from the take-over to the final.

Generally speaking, performed a wide range of duties, main duties being to manage all the works, all the crews. Approval of payments for all expenses, responsibilities in terms of the transportation, rental of equipment.

2003-2004

SC ACI-AG SUCEAVA

Site Manager

Project: MAJOR REPAIR OF THE FOREST DISTRICT OF VAMA, Suceava County.

Technical description: concreting all along the outline of the building (under the foundations),

performing reinforced concrete cores for reinforcement, reinforced concrete beams, tearing down and redoing the roof on a wood structure, with a shingle cover. Indoor partitioning, gypsum board walls, redoing the flooring (from wood to concrete + blanket + tile), replacing the carpentry, redoing the sewerage and sanitary plumbing.

Project-ROMANIAN AUTO REGISTER,SUCEAVA.

Pavilion administrative + a Butler metal hall(made in Hungary, agreemented in Romania).

Perimeter sandwich panel enclosures; the same for the roof; the performance of process channels and the mounting of embedded parts helping the installation of specific machinery. The administrative building on 2 levels, a structure based on frameworks with a brick masonry filling with holes, a terrace roof; the development of the offices; sanitary, power and heat installations; complete finishing. Total area of 1,500 sq m (1100 sq m for the hall + 400 sq m for the offices).

Tasks:

Checking the physical progress made,

Ensuring that the quality and quantity meet the design,

Ensuring the compliance with the work schedule and the occupational protection regulations, maintaining contact with the technical and administrative stakeholders involved in the project, supplying materials and commissioning them as per the technical prescriptions,

Working alongside the technical, supply and economic departments.

Supplying the site with materials, supervising the subordinated staffs in terms of meeting the requirement related to quality, quantity

Taking part in meetings, appointments, as well as maintaining a close collaboration and staying constantly in touch with authorities

Drafting the monthly physical progress report complying with the technical description

Calculating concrete quantities, ordering concrete, organizing the pour schedule, quantity surveying

The compliance with workplace safety, maintaining a close relationship with the Beneficiaries

Taking care of the correspondence on site

Taking part in meetings, appointments, as well as maintaining a close collaboration and staying constantly in touch with the authorities

2002- 2003

SC CONBUCOVINA SA SUCEAVA

SITE SUPERVISOR

Project – THE LOW POWER HYDROELECTRIC POWER PLANT (800 KW) in the commune Vicovu de Sus, Suceava County, estimated 10 millions euro. Performed works-20% amount.

Technical characteristics: discharge sill of 280 lm, divided into 10 lm plots, a top height of 2.4 m. Trapezoidal section in plane, the thickness of 40 cm; rolling stone in gabions on a layer of fascines, concreting on top.

Performing monolith breakwaters on the left-hand side bank, wall riprap, low weirs downstream and upstream, and gabions. Downstream and upstream dam consolidation. A work performed at the confluence of the Suceava and Putna Rivers, the water collected by this discharge sill is directed to an off take, and, in the end, 800 KW/hour are produced and supplied to the National Power Grid.

Tasks:

Complying with the technical requirements as per the technical design,

Drafting the monthly physical progress reports, meeting the quality and quantity requirements.

Supervising the teams of subordinated carpenters, steelman, journeyman .

Taking part in the on-site meetings with the Contractor and the Beneficiaries.

Calculating concrete quantities, ordering concrete, pouring concrete, organizing the pour schedule

Site safety and health improved: “ zero injury” culture

Responsibilities in terms of the transportation

1998-2002

SC CONIMUR SRL TG.MURES

SITE SUPERVISOR

Project: CAPITAL REPAIRS AND THE MODERNISATION of the University of Medicine, “Petru Maior”Technical University, the installation of the “Week-end” touring mall and recreation ground, rehabilitations, frontage rebuilding in the centre of the Municipality. Capital repairs and the modernization of the Tg. Mures Penitentiary.

Projects: CAPITAL REPAIRS WITHIN SC AZOMURES SA

Performed works:

Torkret(using torkret machine), drainage of waste water with chemicals. Plant repairs: urea, ammonium nitrate, N.P.K(nitrogen, phosphor, kalium). Groundwork + pumps installation, electro-tackles.

Tasks:

Complying with the design, drawing

The compliance with workplace safety, maintaining a close relationship with the Beneficiaries

Taking care of the correspondence on site

Taking part in meetings, appointments,as well as maintaining a close collaboration and staying constantly in touch with the authorities

Supplying the site with materials, supervising the subordinated staffs in terms of meeting the requirement related to quality, quantity

Supervising the teams of subordinate Carpenters,steelman,journeymans,weldders(argon,oxiacetilenic),electricians,plumbers .

EDUCATION AND TRAINING

George Brown College Toronto 2015-2016

Construction Project Management Certificate(Gold Seal).In progress.

Academy of Learning Toronto,2012-2013

Home Inspection Diploma

Technical University “Gh.Asachi” Iasi, Romania 1998

Bachelor in Civil Engineering

LIST OF PROJECTS

Viva Bus Facility, Richmond Hill,ON 2013-2014

A maintenance and storage over 50,000 sqm Warehouse for Viva Bus.

GO Train Tunnel, Weston Rd Toronto,ON 2013

A new railway for GO Train.A big infrastructure project,a 1500 meter railway -4 tracks and a 300 meter Tunnel

Westwood Alterra Condominium, Toronto, ON, 2012-2013

Six levels condominium. Two underground common level parking.

Pier 27 Residences Toronto, ON 2011 – 2012

Four mid-rise towers of 12 and 14 storey residential buildings with 477 units and 3 levels common underground parking

Rechenzentrum Eumetsat Darmstadt. Germany 2010-2011,4 million dollars worth

Two commercial buildings, 8 levels each one with 2 levels common underground parking each one

HSE Gasturbinen Darmstadt”, Germany, 2009,over 2 million dollar project.

Electricity production plant.Concrete and steel structures.

.

University of Crafts of Mannheim, Germany, 2007,cca 7.8 million dollars worth, over 40 people supervised

A building with 8 storeys, concrete structures.

Agronutrisco Birds' Slaughter House”, Mihailesti, Giurgiu, Romania, 2006,4.5 million dollars worth,over 65 people supervised

A hall made of precast pillars and glass foundations. Works performed: landscape and structure, concrete platforms for traffic.

The Head Office of The Romanian Automobile Register, Suceava, Romania, 2003-2004,700,000 dollars worth,20 people supervised

A hall made of steel and concrete structure. Landscape and concrete platforms for traffic.

The Low Power Hydroelectric Power Plant (800 kw) in Suceava, Romania 2002,over 2 million dollars worth,25 people supervised

Performing monolith breakwaters on the left-hand side bank, wall riprap, low weirs downstream and upstream, and gabions. Downstream and upstream dam consolidation, excavation.

Capital Repairs and Modernisation of the University of Medicine, Tg.Mures, Romania, 1999-2000