Jignesh Doshi
***-**** ******* **** *********** ON M1S4L1
acs2as@r.postjobfree.com /647-***-****
OBJECTIVE: Seeking an Industrial Engineer position where my experience and knowledge can be utilized and lead the company towards progress.
View Job Ad
EXPERIENCE
Process Engineer Woodbridge Foam Corporation-Whitby ON 1/2012-Present
Reduced the scrap and repair rate on products from 3.5% to 1%.
Analyzed and Implemented reduction in usage of chemicals from 42grams per meter to 25 grams per meter.
Optimize chemical, material usage and labor while minimizing waste through chemical formulation optimization and process optimization and achieved an annual savings of $35,000.
Used Pareto charts, control plans to analyze and identify opportunities for improvement.
Analyzed and implemented proposed engineering changes (ECN’s) for both internal and external customers.
Schedule, Monitor, Track work done by Tooling mechanics and documenting changes to ensure pay back is achieved.
Responsible for trouble shooting equipment, operating issues, training of mechanics and implementing process controls through various techniques like 5 whys, fishbone diagram.
Utilizes a ‘hands’ on approach to work collaboratively with the Production on training of operators, Maintenance and Tooling team to produce quality product and also ECN’s to minimize obsolete stock.
Responsible for Launch of New Programs and develop and implement action items for achieving zero cost of poor quality.
Experience working in a TS 16949 and ISO 9001/14001 environments
Industrial Engineer GECOM Corp., Greensburg IN USA 1/2008 –9/2011
Implemented and improved plant layout thru plant moves during global automotive slowdown in 2009.
Improved raw material and finished good flow by 15% due to layout changes in warehouse and assembly lines thru stop watch study, time and motion study and line balance techniques.
Implemented two associates’ changeover in our metal stamping and injection molding department to reduce die change over time from 45-50min to 20 min.
Reduce inventory by 15% of stamped parts through layout changes, batch size and scheduling.
Used outside contractors like Fastenal to reduce warehouse space required and holding of raw materials.
Perform Lean Manufacturing Principles Training as applicable and facilitate quality improvement initiatives.
Diagnosed various process related issues using pareto analysis, fish bone diagram, 5P, 5 why’s and implemented changes through fixture modification, cycle time reduction, work distribution
Analyzed man power requirement of work cells by monitoring daily efficiency to reduce unit cost and recommended corrective actions for persistent results.
Implemented a picture rich work instructions for changeover and also was color coded to identify it.
Jignesh Doshi
acs2as@r.postjobfree.com /647-***-****
Industrial Engineer (Continued) GECOM Corp., Greensburg IN USA 1/2008 –9/2011
Prepared and implemented justification of new capital equipment on production floor.
Responsible to monitor the corrective action system and ECN’s for Quality Control Department
Maintain and analyzed plant layout using AUTOCAD for three different manufacturing facilities.
Prepare, maintain and coordinate new and existing fixture modification requirements.
Create standard work instructions and quality alerts where necessary to support quality initiatives.
Student Assistant Wayne State University Detroit MI USA 10/2006- 12/2007
Handled and rerouted important phone calls of Dean, Professors and student queries.
Handled brochure printing tasks.
Created and handled an effective filing system to maintain student records.
Assisted the technical and non-technical staff with equipment utilization and maintenance like fax, printers, computers, software.
CAD Engineer Charisma Careers Pvt. Ltd. Vadodara, India 8/2005 –10 /2006
Created and maintained plant layouts, material flow using AUTOCAD.
Designed and Improved different equipments using PRO-E.
Delivered corporate training on AUTOCAD, PRO-E and MS Project.
Created, Analyzed and Maintained Daily, Weekly, Monthly and Yearly reports on equipment utilization, downtime and its effectiveness.
Co-op Engineer Aries Technologies Pvt. Ltd., Makarpura, India 3/2004 –9 /2004
Reduced Inventory by 6% using Line balance, better material flow arrangements.
Improved the equipment utilization by establishing preventive maintenance.
Delivered training on Pull and Push Concepts. Lean Manufacturing Concepts like TAKT TIME, OEE.
EDUCATION
MS in Industrial Engineering GPA- 3.33/4.00 Wayne State University Detroit MI USA 10/2006 -12/2007
BS in Mechanical Engineering GPA-3.85/4.00 Gujarat University Ahmadabad India 9/2001-9/2005
Skills:
AUTOCAD
O.T.R.S. (OPERATION TIME RESEARCH SOFTWARE)
Six Sigma Green Belt Certificate
Lotus Notes
Statistical Process Control