DAVID B. TEAGUE
New Albany, MS 38652
Phone: 662-***-****
E-mail: ***************@*****.***
WORK EXPERIENCE
FXI, Baldwyn, MS – April 2015 – Present
Manufacturing Engineer
Devise Work Instructions/SOP/JSA
Analyze Plant/Cell/Workstation Layout
Research Equipment /Processes
Perform Time Study Analysis & Process Improvements
TRUE TEMPER, Amory, MS – January 2011 – April 2015
Manufacturing Engineer
Oracle ERP BOM/Routing Applications
Bill of Material/Routing Insertion/Editing
Oracle Costing
Inserts/Edits Master Items/Master Data
Product Cost Analyzing & Effectiveness
Product Flow Cost Comparison
Engineering Change Order Facilitator/Management
Employee Payroll System Insertion/Change
Analyze/Assess Industrial Effectiveness/Efficiency
Assess Scrap Wastes – Implement Waste Reductions
Recommend Capital Equipment Solutions
Develop Time Study & Cost Standardization Data
COOPER POWER SYSTEMS, Lumberton, MS – September 2010 – January 2011 – Plant Shutdown
Maintenance Supervisor
Manage 6 Maintenance Techs
Maintain/Direct Work Order Tracking System Activities
Conduct Total Preventive Maintenance (TPM) System Checks
Analyze/Assign Quick Response Boards Solutions
Manage Maintenance Employee Auto Time System
Manage Maintenance Contractor/Vendor Assignments
Direct Maintenance Process Improvements
Conduct Maintenance Safety Inspections
Train Maintenance Personnel in Safety Measures
STANLEY ASSOCIATES, Redstone Arsenal, AL – May 2007 – September 2010
Engineering Scientist & Process Analyst
Army Aviation & Missile Weapons Systems Sustainment
Manage Project Management/Plan Procurement
Recommend Industrial/Environmental Solutions
Analyze/Assess Equipment Effectiveness/Efficiency
Analyze/Assess Industrial Effectiveness/Efficiency
Analyze/Assess Environmental Effectiveness/Efficiency
Report Solution/Kaizen Metrics to Management
Facilitate Flow Chart/Lean Value Stream Mapping Tools
Develop/Utilize Assessment/Audit Forms
Execute Specification/Document Research for Customers
Evaluate/Research Material Safety Data Sheets (MSDS)
Research/Implement Spares Replacement Part Data System
Evaluate/Analyze Engineering Drawing Specifications
ABCO OFFICE FURNITURE, Florence, AL – April 2005 – May 2007
Manufacturing Engineer
Manage Kaizen Implementation Event Teams
Instruct/Direct Kaizen Classes
Implement 5-S/Standardization – Eliminate Waste
Research/Control Engineering Change Request/Order – Product Launch to Completion
Design/Redesign Packaging Methods/Materials
Administrate Packaging Changes
Conduct/Monitor Time Study & Process Design
Analyze/Coordinate/Report Plant Organizational Flow
Design/Implement Work cell Layout & Flow
Administer/Control CNC Metal/Wood Programming & Robotic Programming
Evaluate/Design Safety & Environmental Work Stations
THE ASHLEY COMPANIES, Ecru, MS – October 2002 – April 2005
Product Engineer
Manage/Control Specification Sheets
Research/Control Engineering Change Request/Order – Product Launch to Completion
Design/Facilitate Packaging Methods/Materials
Manage Law Label Ticketing/Material Composition
Implement/Control Bill of Materials (BOM)
Audit Bill of Materials Matrix Sheets & Systems
Engineering Change Order Administrator (ECR/ECO)
Evaluate/Coordinate AutoCad Drawing Changes
Direct/Administer Internet Replacement Part System
PEOPLOUNGER INC., Nettleton, MS – December 2001 – August 2002 - Layoff
Lean Manufacturing/Industrial Engineer
Manage 50 Floor Crew Personnel
Manage Kaizen Improvement Implementation Events
Implement 5-S & Waste Reduction Tactics
Evaluate/Design Cell Layout & Flow
Streamline Internal & External Processes
Implement Product Kanbans & Part Replenishments
ALCOA FUJIKURA LTD., Houston, MS – September 1999 – December 2001 - Plant Shutdown
Kaizen Manager – Safety/Environmental Engineer
Direct/Instruct Kaizen Classes
Manage/Lead Kaizen Improvement Implementation Teams
Direct Value Stream Mapping Events (VSM)
Implemented 5-S/Standardization – Eliminate Waste
Standardize Production Rates
Conduct/Develop Plant Organizational Flow
Evaluate/Coordinate Process Design
Supervise Production Lines
Lead/Manage Ergonomic Protocols
Lead/Manage Environmental Health and Safety Protocols
Installed/Monitored Job Risk Ranking System
Installed/Controlled Internal Ergonomic Audit Spreadsheets
Awarded Excellence in Ergonomic Protocol & EHS Systems
Instructed/Directed Ergonomic/Safety Risk Classes
PARKER HANNIFIN, Batesville, MS – January 1999 – August 1999 - Layoff
Industrial Engineering Manager
Managed 3 Engineers
Manage Kaizen Improvement Implementation Events
Standardize Production Rates
Conduct/Develop Plant Organizational Flow
Supervise QS 9000 Drawings & Specifications
Evaluate/Coordinate Process Design
Developed/Implemented Work Station Design
SUMITOMO ELECTRIC WIRING SYSTEMS, Morgantown, KY, March 1997 – December 1998
Production Engineer
Manage 3 Engineering Assistants
Manage/Lead Kaizen Improvement Implementation Teams
Conduct/Develop Plant Organizational Flow
Standardize Production Rates
Directed/Coordinated New Product Design Launch
Design/Implement Workstation Improvements
Evaluate/Coordinate Process Design
CORBIN RUSSWIN, Clarksdale, MS – May 1996 – February 1997
Manufacturing Engineer
Assess/Implement Cost Savings Implementation
Evaluate/Administer Fatigue Rate Computation
Conduct/Develop Production Rates (MSD & MTM)
Conduct/Develop Plant Organizational Flow
Design/Implement Jig & Fixture Tooling
Evaluate/Coordinate Process Design
Assess/Monitor Safety & UL Concepts
COMPUTER SKILLS
Programming – CNC Robomac/WoodWop & Robotic Welding
Word Processing – Word, PowerPoint
Spreadsheet – Excel, MiniTab
Programs – ORACLE, MAPICS, SAP, SYMIX, AS400, FEDLOG, EDIS, HMIS, EDS, ICAPP
E-mail – Outlook, Outlook Express
EDUCATION
Villanova University
Master Certificate of Applied Project Management
Certificate – September, 2009
Mississippi State University, Starkville, MS
B.S. Degree in Industrial Technology (T.T.S.)
Graduated – May, 1995
REFERENCES
References available upon request