KWOK CHUEN LEE
BRAINTREE, MA *2184
Phone: 1-781-***-****
E-mail: acru11@r.postjobfree.com
LANGUAGES/ SPECIAL SKILLS
Languages: English- Fluent; Cantonese- Fluent; Mandarin- Fluent
Technology system: Windows and Macintosh
Microsoft (Access/Excel/Project/ Word/ PowerPoint/ Visio/Outlook)
Primavera Project Planner P3
EDUCATION/ CERTIFICATE QUALIFICATION
Life, Health and Series 6 license
Diploma in Facility Management, The Peterson School of Engineering, Massachusetts, 2012
Bachelor of Design And Engineering (Mechanical), Open University of Hong Kong, 2002
Certified Welding Inspector, America Welding Society, USA, 1997-2006
Endorsement Certificate in Welding, Hong Kong Polytechnic University, Hong Kong, 1987
Higher Certificate (Mechanical), Hong Kong Polytechnic University, Hong Kong, 1983
Apprenticeship (Mechanical), China Light & Power Co. Ltd, Hong Kong, 1982
PROFESSIONAL WORKING EXPERIENCES
Life / Health Insurance Agent, New York Life, Waltham, Ma, December 2014 – Present
Facility Manager, Silicon Quest International, San Jose, California, June 2013- December 2014.
Achievements:
Set up routine check requirements
Successfully renew ISO license
Energy the energy by 20% by promoting energy saving initiatives
Help to decrease customer complaint by enhance worker’s awareness
Improve work efficiency and enhance safety by employ new equipment
Custodian, USPS Post Office, Ma, February 2013- May 2013.
Achievements:
Leant how to using cleaning tools and product to increase work efficiency
Understand how a post office working
Learnt how to waxing and polishing
Leant how to change work flow to increase working efficiency by 30% to 50%
China Light & Power Co. Ltd (CLPP), Hong Kong
Construction Engineer (Emission Control Project) April 2009 – March 2011
Achievements:
Complete the project ahead of schedule by 6 months
Successfully solve the interface problem among different contractors
Help contractors to produce meaningful progress weekly update to senior management
Increased the safety awareness with working team
Emission control project is a biological and chemical process. In which wastewater is being treated with biological method, SO2 from flue gas system is being absorbed by chemical process. The biggest challenge of this project is to complete the project from 6 months behind schedule to compete the project ahead of schedule. Moreover, the technology used in this project is totally new to me is also a challenge.
Planning Engineer (Business Improvement) 1999 April – March 2009
Achievements:
Establish the procedures and requirements for the internal and external Benchmarking of company.
Create the benchmarking database for the company
Create the performance balance score card system which alert management for areas of improvement
Create risk matrix for the company, and constantly perform risk assessment and produce report to management for improvement
Planning / Controls Engineer – Black Point Power Station (BPPS) 8 x 320MW
May 1994 – April 1999
Achievements:
Deliver the project on schedule with the new bulk material system
Successfully solve interface problems
Produce a new project program with P3 (Primavera Project Planner) by linking the P&ID and Isometric drawings to the activities which can reflects the % completion of the project progress.
Planning & Construction Engineer – Ash Classification Plant Project, Castle Peak Power Station January 1992 – April 1994
This project is to refine the dust that generated after coal burnt with cyclones and filter bags.
Achievements:
Deliver the turn-key project on schedule in an in situ environment
Successfully solve numerous interface issues
Successfully solve a lot of technical issues
Successfully handling new challenges of the new technology
Piping Section Engineer – Daya Bay Nuclear Power Station (2 x 900MW) 1990 – 1992
This is the first nuclear power plant project in China.
Achievements:
Deliver the project on schedule under France material and technology, China contractor and international nuclear requirements.
Learnt what is quality assurance
Learnt how to construct a nuclear generation plant
Learnt the culture of China engineers and contractors
Learnt how to work with procedures and standards
Technician Boiler Construction – Castle Peak Power Station 1982 – 1990
Achievements:
Learnt how to construct a conventional coal fire boiler and it auxiliaries
Learnt how to check the civic work before mechanical work start
Learnt the preparation work for machineries
Learnt Heavy lifting and safety requirement
Learnt how to do alignments
Mechanical Apprentice – China Light & Power Company Ltd, Hong Kong 1978 – 1982 Achievements:
Learnt the basic of being a mechanical fitter
Learnt the water and stream cycle in a power generation plant
Learnt how electricity is being generate and transmitted to customer
Learnt how to repair a internal combustion engine