GHULAM FAREED KALWAR

Qatar Petroleum

DUKHAN FILED

(MEDGULF EPIC PIPE LINE and PIPING Project DI Pipe and HDPE 250mm)

Dukhan Field Qatar

Current Location: 29 Street Industrial Area Doha. Qatar

Postal Address: House No: D-221, Gurmukh Street

Mohallah Gharibabad, Sukkur, Sindh

Mobile No Qatar 009**-********

Mobile No Pakistan 0092 344-***-****

Notice Period 3 Month

acrnoo@r.postjobfree.com

acrnoo@r.postjobfree.com

Skype ID ghulamfareed48

OBJECTIVE:

More than Three (04) years of proven experience in all aspects of Piping/Pipe Line and Mechanical. Maintenance, and more than t(04) years in construction, fabrication and installation of piping system / mechanical equipment for substantial facilities in oil and gas and other industrial plants. Became a member of Construction and PMC team the review (QATARGAS). I have 1 years hand experience in Pipe Line field (36) inch main line working in Qatar petroleum Qatar. Has relevant experience

execution of pipe routing study, preparation of standard pipe support drawings and sketches to be used for pipe stress analysis, generation of piping

PERSONAL INFORMATION:

Father Name : Irshad Ali

Date of Birth : 19-jun-1985

Nationality : Pakistani

Marital Status : Married

Passport No : DN-4792911

PIPING, PIPE LINE & MECHANICAL ENGINEER

Have multidiscipline experience in Piping, Pipe Line, Mechanical, Construction & Pre-Commissioning and Commissioning Startup activities with well

Organized .

Construction

Erection & Fabrication

Maintenance

Pre.Commissioning

Commissioning

KEY SKILL

PIPE LINE Construction

36inch Main line Weldings

Piping Fabrication & Erection

Piping Inspection

Construction Documents

Materials

Construction

Assembly

Inspection

Testing

Operations

Maintenance

Pipe Line Installation

Test Pack Preparation

Pre-commissioning

Punch List

Line Walk/Checking

Maintenance

Piping Quality Surveyor

Safety

Plants & Clients Exposure

Oil & Gas Fields (MEDGULF Construction Company (EPIC)

Oil & Gas Fields (QATAR GAS PMT)

Oil Refiner Fields (NRL Pakistan)

Pipe line (Pak Asia)

Maintenance Etimaad Engineering Uch Gas Field

Power plants Karachi Electric Supply Corporation Thermal Power Station

Main Responsibility

Responsible all work activities involving Piping, Pipe Line, such as Erection, Fabrication, Pipe Supports, Drawing reviews, work area preparation, and HSE Awareness .

-Revalidation of PTW

-Supervision and coordination of work activities with in project standard and procedure.

-Ensures that subordinates and contractor’s personnel are well trained and knowledgeable of the materials and work procedures to ensure optimum efficiency.

-Monitor and reviews contractors schedule of progress and give instructions to use well as desired results.

-Reviews and controls drawings according to the latest revision and specifications.

-Monitor and oversight of piping materials availability according to drawing requirements.

-Review of daily progress and advice action plan for achieving of backlogs.

- Co ordination with Sub Contractor and Engineering EDL / material department for any technical and material related issue .

-Co ordination with other disciplines such as QA/QC and ODD for any Site issue to expedite the progress and achieve the daily / weekly progress .

-Preparation of Punch list .

Primary Accountability

-Supervise and monitor work activities to ensure adherence to safety standard, quality standard and project specification.

Reviews and make recommendations for Safety Task Assignment and Job Safety Assessment.

Summary of Experience

I have 4 year Experience in Piping Construction & Inspection, Welding, Fabrication, Installation, Maintenance, Pre-Commissioning, Commissioning, Multidiscipline fields, Construction Industry Including, Oil Field, Gas Field, Oil Refinery, Power Plants, Pipe Line. etc

A Board Knowledge of Mechanical, Piping, Pipe Line, Valve, Welding, as well as design Practice and Standards

I have Working Knowledge of the relevant Specification. I have experience to identifying and resolving the site issue with Contractor and client third party (Being proactive and practical),also support service on inspection and maintenance engineering to company Operation Support Department Including inspection technique

Piping study of critical lines to fix the equipment locations and associated structures /items from

specific process, operating, maintenance and construction criteria / considerations.

Preparation and checking piping design basis, piping specifications & standards.

Participation in constructability review with other disciplines and ultimately with the client

P&ID requirements, safety and integrity requirements,

Operation & maintenance good engineering practices and clients comments / requirements. Supervise team of engineers and designers for execution of piping work scopes.

Working Experience MEDGULF Costrruction Company

(PIPE LINE 36 inch & PIPING Erection Fabrication)

Employment History:

Organization: Oil & Gas (Qatar Petroleum)

Duration: Oct 2014 to july 23 2015

Designation: Pipeline/ Piping Engineer

Handle the tasks of designing pipelines, and pipeline integrity

Responsible for handling pipeline construction projects, pipeline reconstruction,

Perform the tasks of reviewing and explaining pipeline safety rules and regulations to construction workers and staff

Assigned responsibilities of handling pipeline construction projects from the initial to the completion stage

Handle the tasks of estimating project cost and work schedule to meet project deadlines

Pipe line fabrication, welding,

Supervise the Fabrication, installation, and erection of piping, pipe fittings, valves, and main Process pipe rack of the plant

Supervise the piping, Fabrication and hydro testing activities

Supervise the Main line 36 inch hydro test activities

To review for compliance with Drawing, Specification, Codes, Project specs such as Relevant National and International Codes,and Project Specs

Leading /Supervising the technical manpower groups at erection site.

Hydro testing, Flushing, Chemical cleaning, Piping & Drying of Piping system & equipments

Review and follow up of construction work packs.

Perform and coordinate piping material take offs (MTO) activities.

Preparation of piping material specification and piping class as per project requirement.

Preparation of valve datasheets and also piping special items datasheets.

Checking of piping isometrics, piping GAD’s and stress sketches.

Listing of Piping special materials and valves & preparation of index for piping specials materials.

Assist lead engineer in planning, progress reporting and others as required

(Piping Construction Erection Fabrication Installation & Maintenance)

Employment History:

Organization: Oil & Gas (Qatar Gas PMT)

Duration: 21 july 2013 to 30-Sep-2014

Designation: Piping / Mechanical Engineer

Supervise the piping, Fabrication and hydro testing activities

Supervise the Fabrication, installation, and erection of piping, pipe fittings, valves, and main Process pipe rack of the plant

Pipe line fabrication, welding,

Supervise the hydro test activities

To review for compliance with Drawing, Specification, Codes, Project specs such as Relevant National and International Codes,and Project Specs

Responsible for all documentation of the site activities, Progress reports, Welding & Fit up reports

To support the piping engineering team, Reporting initially to I/C Piping

Support field changes and re-route, walk down and punching out of piping System prior to H/T

Leading /Supervising the technical manpower groups at erection site.

Hydro testing, Flushing, Chemical cleaning, Piping & Drying of Piping system & equipments

Test packs and punch lists Checking clearing

Supervising the fabrication, installation and erection of Duplex stainless steel, CS, LTCS Piping

To support the piping as plants, scope of work and understanding of piping system, be able to read isometric, P&ID and piping GA Basic understanding of piping systems, components, material line classes etc.

Preventive maintenance of vessels, valves, cooling tower, maintenance task,

Valves, high pressure valves, piping modification, vessels & fittings.

Installation, assembling and removal of all control, safety and gate valves,

Piping modification at plant site, over hauling, cleaning maintenance equipments

Preparation of piping material specification and piping class as per project Preparation of valve datasheets and also piping special items datasheets.

Selection of piping requirement.

Vendor drawing review: All piping items as well as other discipline vendor drawings (eg : Pumps, Compressors, Heat Exchange

Safety Related Reports

Telephonic notice of certain accidents

Accident reports

Reporting safety-related condition

Filing safety-related condition reports

Technical Knowladge

2 months theoretical training at Descon Training Institute Lahore

3 months theoretical training at Technical Training Center Sukkur

Theoretical and practical training about piping, Piping isometric drawing, fittings, material, basic welding and welding equipments, flanges, Gaskets, P&ID heat exchangers, valves, material codes, specifications, standards etc

Professional Work History

1st Nov 2014 to Till Date STATE OF QATAR

Current Position: PIPING & PIPE LINE ENGINEER

Project : RAF Power Plant Gas Supply Project (EPIC Contract)

Company: Qatar Petroleume

Main Contractor Medgulf Construction EPIC

Department Construction Erection Fabrication & Commissioning

City Country Al Wakra Doha Qatar

STATE OF QATAR

Jul,2013 to 31th Oct 2014,

Position: Piping Superintendent

Project : Jetty Boil-off gas recovery project, Ra Laffan

Company: Qatar Gas (PMT)

Main Contractor Fluor Construction

Sub.Cont QCon Engineering/ Qatar Kentz Engineering

Department Construction & Commissioning

City Country Ras Laffan Industrial City Al khor, State of Qatar

Feb 2010 t0 Feb 2011 Pakistan

Position Mechanical Supervisor

Project : Thermal Power Station Karachi Electric Supply Corporation

Company: KESC

Sub.Cont Continational

Department Maintenance

City Country Bin Qasim Power Plant Karachi

Oct,2009 to Nov 2009 Pakistan

Position: Piping Supervisor

Project : Uch Gas Filed (Shutdown)

Company: OGDCL

Main Contractor Etimaad Engineering

Department Maintenance

City Country Suhbat Pur Balochistan

QUALIFICATION

Diploma of Associated Engineering, DAE (Mechanical)

1st Division (2010) (Mechanical Engineering)

Govt Technical College Khairpur, Sind, Pakistan.

CSWIP 3.1 Welding Inspection Course

Appear in Exam

TWI Karachi Pakistan

May 2015

Training & Courses

Sr Ss Sr

Training

Year Of Passing

Traning Centre

1

PIPE FABRICATION

2009

DTI LAHORE

2

BASIC WELDING COURSE

2008

TTC SUKKUR

3

Project Management Commissioning Permit To Work (PMC PTW)

2013

JBOG (FLUOR )

4

LOCK OUT TAG OUT (LOTO)

2013

JBOG (FLUOR)

5

HSE INDUCTION

2013

JBOG (FLUOR)

6

PERMIT TO WORK ERECTION(PTW)

2013

JBOG (FLUOR)

7

CONFIND SPACE

2013

JBOG (FLUOR)

8

BASIC FIRST AID

2013

JBOG (FLUOR)

9

WORK & HEIGHT

2013

JBOG (FLUOR)

10

H2S TRAINING

2014

QATAR GAS

11

H2S TRAINING

2014

Venture Gulf (QP)

12

Confined Space Entry

2014

Venture Gulf (QP)

13

Qatar Petroleum PTW Holder

2014

Qatar Petroleum

Awards / Recognitions

Sr

Name

Achivement

By(Company/org)

Project

year

1

Certificate of Recognition

Piping Support

Qatar Gas JBOG (PMT)

JBOG, Project, RLIC,QATAR

2013

2

Certificate of Recognition

Piping Support

Qatar Gas JBOG (PMT)

JBOG, Project, RLIC,QATAR

2013

3

Certificate of Recognition

Piping and Commissioning Support

Qatar Gas JBOG (PMT)

JBOG, Project, RLIC,QATAR

Jan 2014

4

Certificate of Appreciation

Piping and Compressor Commissioning Support

Qatar Gas JBOG

(PMT)

JBOG, Project

RLIC,Qatar

Apr 2014

Certificate of Appreciation

Piping Mechanical Commissioning Start Up Supported

Qatar Gas JBOG

(PMT)

JBOG, Project

RLIC, Qatar

Oct 2014

References

Bashir Mirza Project Manager (Shell), JBOG RLIC, Qatar

Contact # 009**-********

Email ID acrnoo@r.postjobfree.com

Syed A, Bukhari Head Of Construction/Completion/Commissioning

Qatar Gas (JBOG Project, RLIC Qatar

Contact 009**-********

Email ID acrnoo@r.postjobfree.com

Language

English, Urdu, Hindi, Punjabi, Sindhi,

Computer Skills

Word, Excel, Power Point, Outlook



Contact this candidate