SAJJAD ALI
House No. */*, Survey No. ***,
J.T.C.H.S Malir, 75050
Karachi, Pakistan.
Cell # +971-**-******* / +92-333-*******
Email: acrmju@r.postjobfree.com
acrmju@r.postjobfree.com
Objective:
Being a devoted Instrument Engineer with remarkable experience of Oil & Gas sector, seeking a challenging job
in a professional environment where I can contribute to the growth of the organization by exploring my
knowledge and capabilities.
Work Experiences:
Samsung Engineering UAE.
Instrument Engineer (Jan.2014 till to date.)
ICAPS Administrator & Punch Coordinator (Pre-com & Turnover) (Apr.2012 - Nov.2013.)
Project:
CARBON BLACK & DELAYED COKER PROJECT RRE, TAKREER, UAE
As an Instrument Engineer, my role is planning and execution of below responsibilities by coordinating
with engineering, construction & Project manager.
Job Responsibilities
o Review & modification of Instrument Index, Instrument Data Sheet, Hook-up drawings &
other related engineering documents.
o Planning the priority for construction with project engineer & project manager.
o Line-up the inspections according to the schedule.
o Providing technical support to the site team during construction.
o Organizing the witnessing of Pre-commissioning activities by his team.
o Ensure a daily follow-up of the Progress of all activities against planning and recommend any
necessary corrective action.
o Coordination between construction & QA/QC.
o Coordination with the client for inspection.
o Prepare and attend all meetings requiring the presence of the discipline leader.
o Participating in Daily and Weekly reports for the Instrument discipline.
o Reporting to Engineering Manager on progress of all activities and on changes to basis for
design.
o Collecting data/information from PID, other Engineering drawings.
o Review and check technical vendor submittals for installation requirements.
o Support sub-contractor in preparation loop folder, providing them all required drawings &
ILD etc.
o Provide assistance to field troubleshooting team.
o Prepare some modification design at site (as-built) with coordination with project engineer.
o Supervise all Loop checking activities from preparing loop folder till performing loop
checking at site.
o Coordination with vendors for modification & up gradation of programming for DCS.
o Supervise all instruments calibration, installation, pre-commissioning testing &
commissioning.
o Supervise of all RFI & walkthroughs for Instrument discipline.
o Coordination with sub-con & QC for closing all punches.
o Perform SIT & SAT of panels inside SIS with coordination of Vendor & Client.
Objective
Project:
SATORP JUBAIL EXPORT REFINERY PROJECT, KSA
As an ICAPS Administrator, my role was planning and execution of below responsibilities.
Job Responsibilities
o Control of ICAPS database (consistency, discrepancy) to ensure the milestone.
o Control & validate data import from engineering database into ICAPS.
o Provide appropriate check sheets, test sheets, punch lists & reports to PM & SM.
o Ensure the ICAPS database is well parameterized, populated for pre-commissioning activities.
o Prepare & implement detail ICAPS management procedure & work flow.
o Verify & monitor the preparation of pre-commissioning & commissioning activities.
o Prepare Opercom sheets.
o Participate in completion meeting.
o Expedite to accelerate construction, commissioning & completion activities.
o Provide complete assistance & support to punch list management team.
o Person in-charge to organize completion & acceptance walk through of RFC, RFSU &
RFISU.
o Providing complete documentation & assistance for final walk through.
o Maintaining & updating the database & progress reports.
o Preparing & updating Pre-commissioning & commissioning dossiers.
As Punch Coordinator, my role was planning and execution of below responsibilities.
o Review and consolidate the entire punch list items identified during the
Walkthroughs/Inspections to ensure the correct categorization as outlined by Project
specification prior to input in the ICAPS.
o Interface with Client in cases of disagreed/discussed punch items.
o Notify newly added items to the concern punch killing team.
o Identify and Prioritize the Punches as per the Project schedule and ongoing commissioning
activities.
o Follow up with Contractor/Sub-Contractor Punch killing teams to expedite for closure and
solution of the punch items.
o Expedite the review and signing off the completed punch items by the responsible authorities
so as to ensure the completion of the Systems and Subsystems in a timely manner.
o Distribution of the reports and exchange of database exports on daily and weekly basis.
o Notify items deemed closed.
o Closely monitor outstanding punches and Coordinate with Construction /Commissioning /
Engineering /Procurement Teams and sub-contractors for Punch Killing.
o Coordination with Quality/Commissioning Team for Punch Verification.
o Attend daily meeting with Subsystem Owners to expedite the punch closing and Pre-Com
Task to accelerate the Commissioning activities.
o Attend daily meeting with Construction/Commissioning Team to expedite the
Reinstatements/Flushing and Punch clearance.
o Attend Bi-Weekly meeting with Client to discuss the current status, next week plan and
ongoing issues.
Sui Southern Gas Company Ltd.
Worked as Instrument Supervisor (Operation & Maintenance) from Jan.2010 till Mar.2012.
Job Responsibilities
o Installation & Commissioning of Instruments on pipeline and RTUs.
o Execution control valves/compressors/pumps.
o FT, PT & TT calibration.
o Programming on PLCs.
o Trouble shooting the faults coming in instruments & SCADA system.
o Modification in SCADA server (alarm annunciation, faceplates development, archiving, alarm
and tag logging, server to client communication)
o Online checking & maintaining.
o Synchronizing SCADA with GIS (In Progress).
o Maintain daily log-sheet.
o Overcome all problems within the limited time frame in order to maintain plant operation.
o Travelling throughout cities across pipeline to check for leakage by using special designed
vehicle.
SYSTEMATIC ENGINEERING SERVICE (S.E.S).
Worked as INSTRUMENT TECHNICIAN / SUPERVISOR: (JUNE 2006 ? MARCH 2009)
Job Responsibilities
o Complete Installation & Commissioning on Oil/Gas Well Head Automation & controlling
projects For BP, OMV & BHP.
o Calibration of various industrial instruments. (PT, TT, FT, LT, DPT, Local Gauges, etc
o Installation & Commissioning of instruments during Shutdowns & Plant Extension projects.
o Complete Installation & Commissioning of RTG (Radar Tank Gauging System).
o Installation, Termination & Configure Soft tool for Tanks Status monitoring & Control for
RTG (Radar Tank Gauging) system.
o Installation & Commissioning of various kinds of industrial Instruments / Controllers.
o Installation, Commissioning & maintenance of Flow Metering System for oil depots and
terminals.
o Installation, Commissioning & maintenance of level monitoring and control systems for
Airports Jet refueling stations.
o Installation & maintenance of oil filling dispensers (TATSUNO & WAYNE)
Siemens Pakistan Pvt Ltd.
Dec.2009 to Feb, 2010.
I was working as Automation Engineer (Internee) from Aug.2009 till Feb.2010 in BU-EA* of
SIEMENS. I worked on different types of RELAYS and learned how to establish panels by using these relays
and how to handle these sorts of panels for synchronizing all together and got my first experience about the
professional work environment. I was working on the panels different RTU of KESC (Karachi Electric Supply
Company). *BU EA: Business Unit Energy Automation.
o Industrial Automation & Security over Internet
o Plant Automation of Denim International
o Micro-controller work station
o AC Motor Drive
Professional Safety Training:
Samsung Engineering UAE & KSA (Practical Safety Training)
Daewoo E&C, SK E&C
GASCO
RRD(Ruwais Refinery Division)
RRE(Ruwais Refinery Expansion)
First AID (Practical Course & Certification)
H2S & BA Competency Training.
Academic Projects:
Project Management ICAPS (Integrated Commissioning And Progress System)
Applications: Microsoft Project, Primavera 6.0 (Beginner)
Drawings Applications: AutoCAD 2009, Microsoft Visio
Programming Skills: Visual Basic Programming, Siemens PLC S7300
General Applications: Microsoft Office (Complete), Microsoft Outlook
Safety Trainings.
Graduation B.E(Industrial Electronics) (2009)
Institute of Industrial Electronics Engineering (IIEE), B.E (Indus. Electronics)
(NED-UET Karachi)
Project management.
Report writing & Presentation skills.
Problem solving & decision making.
PC literate with PowerPoint, Excel, Access and Word.
Communication, influencing and negotiating and assertiveness skills.
Strong diagnostic ability.
Professional and positive approach.
Self motivated and Creative.
Team Leader, Team player and able to work on own initiative.
Knowledge of all instrument drawings (P&ID, Layout, Hookup, ILD etc).
Personal Information:
Date of Birth : 14th July, 1987
Nationality : Pakistani
Passport No. : DH1790182
Passport Expire : 20th June, 2016
Languages : Urdu, Hindi, English & Persian
Driving license : Pakistan, UAE & Kingdom of Saudi Arabia
Reference:
Will be provided on request.