KENNETH M. HUDNALL
**** ****** ****** *******, ** 70663 Cell # 337-***-****
acrksc@r.postjobfree.com
Technical Advisor – I/E (Consultant) Kellogg Brown & Root
December 8th, 2014 Present
Prepare Pro Service Estimates, allocate resources and distribute man-hour loading for Minor/Major Capital Projects
Construct FEL1 packages for proposed optimization, modernization and debottlenecking projects
Coordinate with vendors and project estimator to provide accurate bill of materials and material take-off list for field construction group
Participate in Estimate Reviews, Process Hazard Analysis, 70%/100% Client Reviews and Pre-Startup Safety Reviews
Support chemical facility client as a Subject Matter Expert on Instrumentation and Electrical
Execute fast-track FEL1àFEL3 projects for Minor and Major Capital Projects 500M
Specify, procure quotations and requisition I/E equipment for purchase in SAP
Function as client's technical advisor in all project meetings to assist and mentor lesser experienced engineers.
Supported projects include: C/S/D Units Erucic Acid Direct Injection, Ethylene Unit Hydrocarbon Gas Detection Network Power Redundancy Cutover, Ethylene Unit Vent Stack Lightning Protection, C-Unit Liebert UPS Replacement, G-Unit High Pressure Separator, C-Unit Hyperplunger Compressor Cooling, C-Unit Initiator Storage Building, C/D/G Modify LPS Rupture Disc Protection, C/S/D Nitrogen Conveying Explosion Mitigation
Site I/E Reliability Engineer (Consultant) Lucite International (AllState Consulting)
August 8th, 2014 November 14th, 2014
Upgraded control room HVAC equipment to comply with pressurization and ventilation requirements for DCS/Engineering/Operator Control Rooms to prevent exposure of mission-critical electronics to gas, condensation and to prevent overheating of equipment
Verified that control scheme works to manually shut off outside air dampers, enabled bypass dampers and chiller economizer controls to recirculate internal air to ensure personnel safety in the event of a smoke or fume release
Assisted/co-authored Total Organic Carbon analyzer preventative maintenance program per application
Developed Thermographic (Infrared) Switchgear and Motor Control Center scanning procedures, test frequencies and standardize report results format to establish contractor independence
Implemented continuous online process analyzer to measure dewpoint and boiler feedwater moisture content of Sulfur Trioxide to prevent corrosion of tubes in shell & tube economizers
Created lightening arrester PM program and replaced porcelain with polymer when possible
Began plant-wide verification routines for all field devices in hazardous electrically classified areas
Evaluated electrical power distribution system on-line diagrams and wrote emergency plant shutdown/process safing procedure for natural disaster Ride Out team
Wrote Safety Instrumented Shutdown procedures for safety system interlock maintenance
Assisted with any site-wide overflow specialty projects that required a high degree of efficiency and technical acumen
April 28th, 2014 June 3rd, 2014 Polaris Engineering (Expert Staffing)
Instrument/Controls Engineer Lead (Delek Refining Tyler, TX)
Prepared FEL3 Ten Percent Estimate Package for Flare Gas Treatment Project for Flare 2 in Areas 26 & 27.
Compiled FEL3 package deliverables for all instrumentation and analytical equipment.
June 24th, 2013 April 25, 2014 CDI Corporation
Instrument/Controls Engineer Lead (Motiva Convent, LA), Instrument/Controls Engineer (Axiall Plaquemine, LA)
Replace carbon steel sight glasses with magnetic level gauges and post-weld heat-treated carbon steel sight glasses as part of Motiva’s Hazards & Effects Management Process initiative for H-OIL, ISOM, VPS-2 and HTU-3 units
Replace corroded branch piping connections in VPS-2, upgrade piping and VanStone thermowell metallurgy to Inconel 825
Install instrumentation to route injection quill wash water flow into VPS-2 A-Tower 2nd & 3rd stage overhead to prevent corrosion
Size and specify SRU-5 Steam Generator blowdown valve
Resize, verify, specify and package instrumentation for re-purchase for H-Oil
temporary compressor skid package intended to be installed permanently for warm-up
Mentor drafters, Junior I/C Designers and Level III and below engineers
Conduct field walk-downs to verify installation arrangements of instrumentation
Size all analysis, flow, level, pressure and temperature instrumentation and create specification sheets in InTools over Shell Global VPN
Size control valves, flow meters, on/off valves and orifice plates using InstruCalc, FirstVUE, Performance! and ValSpeq
Issue sole-source and bid instrument packages for inquiry to vendors and client for Authorization to Purchase
Organize and coordinate on-site continued education courses
Participate in interactive planning, 3D model reviews, F.A.T.’s, inspection/metallurgical testing and verify that all instruments adhere to DEP standards and Stand Instructions
Specify and requisition for purchase all instrumentation for Axiall PVC 3rd Reactor
September 1st, 2012 June 24th, 2013 Jacobs Engineering Group
Instrument/Controls Engineer
Disassembled and modularized a methanol plant located in Punta Arenas, Chile, reassembled and commissioned in Geismar, LA
Sized all analysis, flow, level, pressure and temperature instrumentation and created specification sheets
Created written specification for fire/gas (combustible gas, oxygen deficiency and toxic gas) and life safety (smoke) detection system
Created written specification for remote DeltaV Distributed Control System
Specified laboratory GC’s/spectrophotometers, total sulfur, chlorine, density/dissolved oxygen, mercury vapor, pH/Conductivity, CEMS, TOC analyzer and sample connections
Sized control valves, flow meters, orifice plates and on/off valves using InstruCalc
Back-checked all Baroda, India work-shared specification sheets
Issued all instrument packages for inquiry/bid and requisition all instruments for purchase
Mentored entry-level engineers
August 15th, 2011 August 31st, 2012 Flint Hills Resources (ENGlobal)
Instrument/Controls Engineer (Consultant)
Replaced through-air radar level gauges on off-site storage tanks and routed to DCS
Upgraded plant air compressor surge and overspeed controls and routed to DCS
Assisted Reliability with design and installation of new, open-protocol gas detection
Replaced fuel-gas valves and routed position switches to DCS for Thermal Oxidizer
Demo’ed existing pneumatic level controls for Condensate Feed Heaters (Light Olefins Unit) and Surge Drums (Propylene Drying Unit), replaced bypass chambers and level transmitters and routed to DCS for level control
Revamped level control scheme for E/P Feed Water Separator, sized/replaced severe-service control valve, installed local level/temperature instruments to prevent freezing of quench water loop
Replaced Reformate tank water draw-off interface probes and routed to DCS
Installed thermowells/thermocouples for C2/C3 Cold Train valve latch for Tricon shutdown
Replaced LOU Expander Compressor cold temp. piping flow/temp. instruments
Added redundant level signals on UDEX Stripper Tower, Condensate/Stripper Receivers and redundant pressure signals on Stripper and Benzene Towers for AU Relief Mitigation
December 14th, 2009 August 5th, 2011 Richard Design Services
Instrument/Electrical Engineer
Performed sizing calculations for analysis, flow, level, pressure & temperature instrumentation and created ISA specification sheets
Coordinated mark-ups with Civil, Mechanical, E/I and Process Design Groups
Redlined master sets of P&ID’s and commented as necessary
Maintained instrument index/electrical equipment list/load analysis/voltage drop
Obtained and validated vendor quotes
Compiled transmittals
Assembled client bid packages
Lead Instrument Engineer for a $20MM Flare Gas Recovery Unit project
Instrument Engineer on a $300MM HCU/SGRU/ATU Unit project
Electrical Engineer on $500MM Green Diesel project
February 11th, 2008 December 17th, 2008 Flint Hills Resources (CDI)
I/E Technical Services Engineer (Consultant)
Determined feasibility of proposed analyzer, instrumentation, electrical and gas detection projects
Refined and revised work scopes, conducted preliminary economic analysis and prioritization
Performed front-end and detailed design engineering for project duration
Maintained strict adherence to plant specifications, ANSI, NEC, NFPA & ISA standards
Accurately managed capital projects >=$100K
August 27th, 2007 January 21st, 2008 Delek Refining, Ltd.
Project Controls Engineer (Consultant)
Archived copies of preliminary incident investigation reports
Designed forms, logos and created corporate presence for Southland Safety
Administered TapRooT Root-Cause Failure Analysis software
Revised policies and procedures for Delek safety manual
Maintained incident details and workers’ compensation files in Safety Office Suite
May 30th, 2005 December 4th, 2006 GE Energy / Bently-Nevada
Field Engineer
Installed, configured and tested machinery condition monitoring systems
Gapped transducers through proximitors
Calculated crank-angle, zero and top-positions for thrust probes
Performed rod-drop calculations to determine rider band wear on reciprocating compressors
Verified customer field wiring with loop checks
Conducted Factory Acceptance Tests by driving signals into the back of Bently-Nevada 3300/3500 Series rack systems
Configured Modbus registers and verified communication using ModScan and KepWare
January 19th, 2005 May 17th, 2005 Electrical Reliability Services (Emerson)
Field Engineer (Contract)
Retrofitted LV/MV circuit breakers with AC/Pro trip units
Repaired, replaced and function-tested LV/MV motor-starters
Conducted DC Hi-Pot tests on circuit breakers and AC Doble tests on transformers
Performed saturation and burden tests on existing C.T. circuits
March 1st, 2003 June 6th, 2004 Southern Power Systems (ABB)
Service Technician
Repaired and rebuilt circuit breakers, switchgear and transformers
Conducted high-voltage electrical acceptance testing
Certified transmission and distribution equipment to both NETA and client specifications
Operated oil rig and filter pump to process contaminated transformer oil
Performed preventative maintenance on Gas-Insulated Switchgear (SF6) installs
January, 2003 March, 2003 Aumiller Petroleum Equipment
Parts Manager
Issued parts, dispatched service technicians and maintained an accurate inventory
Unloaded courier freight trucks with a forklift
Shipped & received
Filled sales counter orders
Processed warranty & core-replacement RMA’s
January, 2001 October, 2001 RECON Engineering
Network Administrator (Contract)
Maintained the integrity of engineering drawings and corporate data
Installed and configured Windows NT Server 4.0 RAID 5
Administered tape backups
Diagnosed & repaired problems on AutoCAD 2000 workstations for designers
Installed and maintained new CAT3/CAT5 cable installations for both the network and Toshiba/AMANDA phone system
June, 2000 December, 2000 Tiered Technologies, LLC
Project/Design Engineer
Designed and tested serial relay driver circuits that interfaced a PC serial port a proprietary, biometric thumbprint-scanning security system using Electronics Workbench and Protel 99 SE
Evaluated the feasibility of product launches
Presented design flaws and marketing viability to senior management
October, 1996 May, 2000 Lucid Consulting/DirecTech
Independent Consultant
Owned and operated a network consulting business throughout the majority of my college career
Configured Cisco routers remotely for Turner Industries
Installed and managed Meridian and Avaya phone system for Turner Industries
Managed a staff of 15 computer technicians throughout Louisiana
Fielded 3rd-Tier Support issues for Image IQ’s Computer Shopper clientele
Supervised technical staff during the implementation of mission-critical server installations
EDUCATION/TRAINING
Academic
McNeese State University B.S. in Electrical Engineering (July 2002)
McNeese State University M.S. in Mathematical Sciences (Transferred)
Univ. of Tennessee Knoxville M.S. Reliability and Maintainability Engineering (Transferred)
Univ. of Middle Tennessee M.S. in Professional Sciences (Fall 2014 Enrollment Conc. Engr. Mgmt)
Professional
3Com 3Wizard Technologist / Master
3Com 3Star Certified
AllenTel Data/Telecommunications Certified
A+ Certified
Bently-Nevada – Phase I/II F.E. Fundamentals, System 1 Administrator
Brainbench Windows 95/98 Power User, Windows 95/98 Administrator,
Windows NT Administrator and Computer Technician Certified
Emerson Valve Engineer I
IGT (International Game Technology) Level 2 Technician for Louisiana Video
Poker/Slot Machine fiber-optic networking and repair
Microsoft Certified Professional (Expired)
Project Management Professional (Testing April, 2014)
Six-Sigma Green Belt
Texas Licensed Professional Engineer (Testing October, 2014)
AREAS OF EXPERTISE
Engineering Apps Programming OS’s Specialty Areas
1. DesignCAD 3D
1. Asssembly (Intel)
1. DOS
1. Connectivity
2. Elect.Workbench
2. Borland C++
2. DEC VMS
2. Communications
3. InTools
3. CGI
3. HP-UX
3. Control Systems
4. InstruCalc
4. Fortran
4. IBM AIX
4. Digital Sys. Design
5. Maple V
5. HTML
5. Windows 9x
5. Hardware Diag.
6. MatLab
6. Java
6. Windows NT
6. Oscilloscopes
7. MathCAD
7. Ladder Logic
7. Windows 2000
7. Signal Processing
8. MAXIMO
8. Pascal
8. Windows XP
8. Troubleshooting
9. Microsoft Project
9. Perl
9. Windows 2003
10. Primavera
10. Visual C++
10. Windows 7
11. Protel 99SE
12. PSpice
13. SAP
14. Safety Office
15. SmartPlant Inst.
16. TapRooT