Delbert Newlon
**** ********** ** ******* ** ****1 501-***-**** ***************@*****.***
Objective
I am seeking a position in your company as a rig welder where I can get an opportunity to exhibit my skills.
Education
BACHELOSRS MAY-2012 TULSA WELDING SCHOOL
Major: welding
DIPLOMA MAY 2010 BAUXITE HIGH SCHOOL
Major: General
Skills & Abilities
GTWA- Gas Tungsten Arc Welding (TIG or Heliarc)- Intermediate
SMAW- Shielded Metal Arc Welding (STICK)- Advanced
GMAW- Gas Metal Arc Welding (MIG)-Advanced
FCAW- Flux Core Arc Welding - Advanced
Experience
WELDER JKMI MARCH 2015- JUNE 2015
Welded 2”-6” pipe in accordance with ASME section IX & API 1104
Welded 2”-6” pipe in the following positions 2G,5G & 6G
Cut, prepared, and fitted segments of carbon steel pipe, plate and structural metal
Secured, positioned and aligned metal objects prior to welding
Monitored welding process constantly to avoid over heating
Measured work pieces using straight edges to ensure conformance with standard dimensions
Inspected completed welds for any defects
Performed welding in flat, vertical, downhill and overhead positions for long periods
Welded plate and structural steel accordance with ASME Section IX, ND, AWS, DI.I
Welded structural steel in the following positions: 1F, 2F,3F,4F,1G,2G,3G, & 4G
Prepared and cut metal using:
Air carbon Arc Gouging
Watts beveling machines
Oxyfuel-hand torches
Plasma Arc
WELDER/WELDER HELPLER BAKER SEPTEMBER 2014-MARCH 2015
Helped Rig welder when needed
Welded 2”-6” pipe in the following positions 2G,5G & 6G
Cut, prepared, and fitted segments of carbon steel pipe, plate and structural metal
Secured, positioned and aligned metal objects prior to welding
Monitored welding process constantly to avoid over heating
Measured work pieces using straight edges to ensure conformance with standard dimensions
Inspected completed welds for any defects
Performed welding in flat, vertical, downhill and overhead positions for long periods
WELDER SEAARK JUNE 2014-SEPTEMBER 2014
Welded 2”-6” pipe in accordance with ASME section IX & API 1104
Welded 2”-6” pipe in the following positions 2G,5G & 6G
Cut, prepared, and fitted segments of carbon steel pipe, plate and structural metal
Secured, positioned and aligned metal objects prior to welding
Monitored welding process constantly to avoid over heating
Measured work pieces using straight edges to ensure conformance with standard dimensions
Inspected completed welds for any defects
Performed welding in flat, vertical, downhill and overhead positions for long periods