MORALLA, AGRIPINO JR.
Phase * Block-** Lot-* Emily Homes Subd.,
Libertad, Butuan City, Philippines
Telephone 093********/094********
E-mail add: ***************@*****.***
Academic Qualification
BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING 1994
UNIVERSITY OF MINDANAO – DAVAO CITY, PHILIPPINES
Professional Qualification
Licensed Electrical Engineer
Reg. No. 0013819
Date Registered: 1997
Professional Regulation Commission - Manila, Philippines
Trainings / Seminars Attended
1. Lighting system design application and 2. OSHA Construction Industry
CADD application as engineering tools Safety and Health Regulation
August 15, 1998 OSHA Training and Education
3. National Inspection & Technical Testing Co., LTD 4. Chiyoda Technip Joint Venture
Rigger Level 3 June 2007 Confined space & excavation
Training & Seminar Certificate June 16, 1997
5. Certificate completion has completed
The program of Institution of GAS 6. Word Safety Organization
TESTING that has been conducted International certificate has
August 2007 completed on July 2015
i
7. Chiyoda Technip Joint Venture
Has successfully completed the 8.QATAR GAS PERMIT RECIEVER
Permit to Work Training Course has successfully completed valid
July 18 2007 until 10 February 2010
9. Fire National Institute .
Bureau of Fire Protection in the 10.Basic First Aid Training
Philippine Government Conducted by Total Safety
6 December to 26 March 2000 Qatar Chapter July 5, 2007
EXPERIENCE SUMMARY:
Total of (18)years’ work experience in the field of Engineering, Procurement and Construction related to Oil and Gas Industry. Presently employed with an International Group with a core business of conformity assessment applied in the areas of quality, health. Environment, safety and risk management. With a mission that consists of inspecting, verifying and certifying assets as well as projects, products or systems using its own benchmark references or external standards in order to deliver compliance reports. Proposed services also include related consulting and training.
Professional Experience:
BSP & COMPANY INC.
July 1, 2014 - Present
Geothermal Power Plant
Energy Development Corporation
The Largest Geothermal Power Plant in the word
Ormoc Leyte West Philippines
Working as Sr. Electrical Engineer
Supervise on Main Control Room
and Switch Gear Room on High voltage activities
from 138KV, 69KV and 13.8KV Distribution power
line system
QATAR FUEL (WOQOD
JAN. .22, 2013 – March 05, 2014
GOVERNMENT AGENCY.
Working as Bulk Site Inspector
Qatar Distribution of the following; Diesel.
Petrol, Bitumen, LPG and Jet-A1 34 airlines
Airport of Qatar, Petrochemicals of the Following;
VOLTAS LIMITED
14 October 2010 – 14 October 2012
Sidra Medical and Research Centre, Doha Qatar(Qatar Foundation )
Working as QA/QC ENGINEER ELECTRICAL
MEP Project Sidra Medical and Research Centre on Qatar Foundation working as QA/QC Engineer assigned in Hospital building and Control station building to monitor regarding the Pre commissioning activities and implement permit to work system supervise and monitor more than 2,000 numbers of workers including staffs on the particular area.
Leighton International and Contracting Abu Dhabi LLC
June 2008 to January 12, 2010 Developer
Saadiyat Island, Abu Dhabi
Working as QA/QC ENGINEER ELECTRICAL
Infrastructure which is Bridges, Hotel buildings and 20,000 labor camp project on Saadiyat Island in Abu Dhabi UAE working as QA/QC Engineer on management side supervise and monitor more than 3,000 numbers of workers including staffs on the mentioned project.
VISAYAN ELECTRIC COMPANY CORPORATION
June 16, 1994- Dec. 2, 1999
System &Engineering Department and Design Transformer 15 KVA to 333 KVA& Transmission and Distribution System which is primary line down to secondary Line of system of a certain transformer high and low voltage that has overload.
Working as Electrical Engineer.
DUTIES AND RESPONSIBILITIES:
Supervise on Main control room, Switch Gear room activities from 138KV,69KV and 13.8KV Sub-station on high voltage power line Distribution system
Make design of Sub-stationsTransformer ratings 15KVA up to 333KVA Transformer and Transmission and Distribution system which is primary line down to Secondary line of a certain transformer high and low voltage that has overload.
Work on system and engineering planning and design of transformer rating 15kav up to 333kav transformer.
To conduct survey transformer from 167kva and 333kva rating primary and secondary line distribution system of a certain transformer high and low voltage that has overload.
Install, examine, replace and repair electrical wirings receptacles, switches boxes, conduits, feeders, fiber-optic and coaxial cable assemblies, lighting fixtures and other component
Read and interpret drawings, blueprints, schematic diagrams, and electrical code specifications.
Maintain, repair, install and test switchgear, transformer, switch board meters, regulators and reactors
Troubleshoot, maintain and repair industrial, electrical and electronic control system and other related devices
Evaluates, electrical system products, components and applications by designing & conducting research program
Kept equipment operational at all times by following manufacturer's instructions an establish, procedures requesting repair services
Conduct materials in section and verify the materials as per the purchase order requirements and from approve documents
Assure the quality standard as per project specification
Responsible for supervision and package hand over, as built making and documentation works.
Monitor and control the status of punch list and exception lists relevant to quality dossiers
Monitor hydrostatic test packs for incorporation into as-built dossiers
Resolve any discrepancies between the completed milestone and quality documentation
Coordinate with the commissioning department to define the scope of wor
WORKING EXPERIENCE:
Chiyoda Technip Joint Venture (Client)
May 24, 2007 – May 24, 2008
LNG Qatar Gas 3 & 4
Qatar Gas Conoco Philips Shell Project
RasLaffan Industrial City
Working asHSE Supervisor
Liquefied Natural Gas Project in RasLaffan Qatar working as HSE Supervisor assigned at Utility and Desalinations Plant projects on management side supervising to all 14 numbers of Sub-contractors Company and monitor approximately 90,000 number of workers including staffs on the mentioned Company and Sub-contractors.
Saudi Archirodon Co. LTD
May 5,2005 – October 1,2006
Yanbu National PetrochemicalsSaudiArchirodon – Technip Join Venture
Jeddah, KSA OLEFINS, Saudi Royal Commission
Working asSafety Officer
Yanbu, KSA
SaudiArchirodon – TechnipJoin Venture
October 1, 2006– March 26, 2007
ShoaibaSteam Power Plant Project
Working as QA/QC ENGINEER
Jeddah, KSA
Yanbu National Petrochemical and Shoaiba Steam Power Plant Project in Yanbu and Jeddah KSA assigned at Tank Farm and Desalination plant working as safety Officer supervise and monitor around 500 numbers of workers on the mentioned area.
GOVERNMENT WORK EXPERIENCE:
BUREAU OF FIRE PROTECTION IN THE PHILIPPINES
Dec. 06 1999 – May 03, 2005
To save the life and properties of the people, practitioner of fire and life safety, fire protection, automatic sprinkler system and other automatic suppression system, fire detection, alarm & communication system, smoke control and ventilation system, knowledgeable with National Fire Protection Association codes and other International standard.
Working asFire& Safety Engineer / Fire Fighter
DUTIES AND RESPONSIBILITIES
Strong implementation Safety Rules and regulations accordance with the
Project Health Safety and Environment requirements
Ensures Risk Assessment Program and job Hazard Analysis is being
Practice and strong implemented in order to identify and correct potential
Hazards This may be encountered during the course of construction
Initiating program/campaign which assist to promote safety awareness and prevent majoraccident in operation.
Make monthly activities program and schedule for fire evacuation drill practices
To facilitating, review and provide advice on specific safety studies regarding loss prevention engineering projects.
Identifying and monitor potential hazards to the people or property and correct unsafe environment working condition.
To coordinate outside organization such as Fire Department and ( OSHA )
Conduct tests to certain air quality, noise level, temperature and radiation
Used appropriate software and tools for safety analysis, calculation and design
Performed regular audit for compliance with various management system including loss prevention and risk assessment standard.
Investigate high potential incident/accident and give advice on preventive measures and remedial actions.
Inspection, testing maintenance of firefighting equipment/appliances and audit of fire prevention systems and carried out recommendations for improvement and put into operation
Monitors commercial, educational and industrial use of hazardous substances through permits and inspection
Command and control of all EVAC. Contingency and deployment plans ( security ) as they affect the workforce thousands of residents