Alejandro Edjan
Blk.* Lot *&* Landmark Subdivision,Parian,Calamba City
Laguna,Phillippines 4027
************@*****.***
**********@*******.***
OBJECTIVES
A position where my extensive experience can contribute to customer`s satisfaction and to company`s success.To find an opportunity and share my knowledge in a more stable and challenging environment with extensive experience in tig & arc welding.
EDUCATION
Dolores Elementary School
1983
Primary
Our Lady of Sorrows Academy
1987
Secondary
SKILLS
Extensive experience in tig & arc welding
Interpretation of isometric drawings
Fabrication of pipe spools & supports
Field installation & Erections
Safety oriented individual
Interpretations of RT films prior to repair
Have knowledge in finishing carpentry
EXPERIENCE
Alex s Custom Creations
Landmark Subdivision,Parian,Calamba Laguna,Philippines 4027
Finishing Carpenter/Proprietor
April 2014 – present
Laying out design in accordance with the client s preferences
Designs,repairs,construct and remodels interior and exterior structure made of wood and metal
Designs, constructs, and repairs cabinets, tables, shelves, benches, partitions, flooring, door and window frames, and other types of furniture. May install and repair modular furniture.
Cleans, maintains, adjusts, calibrates and services equipment used in the performance of duties.
Maintain and calibrate hand and power tools
Researches,inventories and purchases of materials,equipments chemicals and parts
Posco Engineering & Const.,Co.,Ltd.
Kallpa 830MW Combined Cycle Power Plant
Chilca,Cañete,Lima,Peru
Tig & Arc Welder
September 3,2012 – February 21,2013
Repaired joints with RT defects
Managed group of 6 developers
Fabricated additional access ways,ladders,stairs & pipe supports
Worked with less supervision
Used precision tools & hi frequency tig welding machines
Designed line modifications & rerouting scheme
Welded alloy pipes p11,p22 & 9 chrome alloys
Worked as a maintenance group
Assembled pumps for feedwater lines
Performed repair works in HRSG 1,2&3
Seil Engineering & Const.,Co.Ltd
Kallpa 830MW Combined Cycle Power Plant
Chilca,Cañete,Lima,Peru
Tig & Arc Welder
January 11,2011 – August 31,2012
Welded heavy wall pipes for blowdown high pressure steam lines
Repaired joints with RT defects
Installed pipe supports and guides
Used precision tools & hi frequency tig welding machines
Interpreted RT films to locate defects prior to repair
Welded chrome alloy pipes p11,p22 and p9
Worked as a coordinator with the hydrotest team
Worked with less supervision
SSK Montajes e Instalaciones S.A.C.
Installation of Furnace 01H1N(Shutdown)
La Pampilla Refinery
Ventanilla,Callao,Peru
Tig & Arc Welder
September 2,2010 – December 11,2010
Welded stainless steel pipes
Dismantled corroded pipes to change with a new one
Installed additional manifolds for product discharge
Worked with less supervision
Repaired joints with RT defects
Installed additional platforms and access ways
Used precision tools and hi frequency tig welding machines
Fabricated pipe spools prior to installation
CBI Peruana S.A.C.
Peru LNG Project
Pampa Melchorita,Cañete,Lima
Peru
Tig & Arc Welder
March 22,2008 – February 7,2010
Welded stainless steel pipes 304,316
Repaired joints with RT defects
Welded small bore pipes in jetty loading area
Installed pipe supports and guides
Worked with less supervision
Welded large bore pipes in fabrication shop(stainless steel)
Modified pipes & supports as per revised drawing
Daewoo Nigeria Ltd.
NLNG/N-Plus Project Train 6
Bonny Island,Rivers State
Republic of Nigeria
Tig & Arc Welder
October 2,2006 – January 16,2008
Welded stainless steel pipes for gas turbine discharge line
Worked under mechanical department for gas turbine installation and pipe erection
Installed pipe supports & guides
Used precision tools & hi frequency tig welding machines
Repaired pipe joints with RT defects
Interpreted RT films to locate defects
Fabricated additional spools as per revised drawings
Worked with less supervision
Daewoo Russia Ltd.
Sakhalin LNG II Project
Korsakov,Sakhalin,Russian Federation
Tig & Arc Welder
September 5,2005 – July 5,2006
Welded stainless steel pipes on site
Used precision tools & high frequency tig welding machines
Worked as a repairman for joints with RT defects
Interpreted RT films to locate defects
Welded on tie in points of stainless steel pipes
Gama Al-Moushegah Arabia Ltd.
Petrokemya Polyethylene Project
Jubail,Saudi Arabia
Tig & Arc Welder
February 8,2002 – June 10,2003
Welded stainless steel pipes with 100% RT
Welded pipe supports ang guides along pipe racks
Welded tie in points of stainless steel pipes
Repaired joints with RT defects
Qualified to weld copper nickel based on procedures of Al-Hoty Stanger
Welded small bore stainless steel pipes for pelletizing silos
Gama Al-Moushegah Arabia Ltd
Hawiyah Gas Plant Project
Saudi Aramco Site
Hofuf,Saudi Arabia
Tig & Arc Welder
December 10,2000 – October 31,2001
Welded Er-cuni(copper nickel) pipes for fire fighting lines
Repaired pipe joints with RT defects
Used Precision tools & hi frequency welding machines
Welded pipe supports & guides along piperacks
Interpreted drawings & RT films to locate the pipe and its defects
Worked in Fabrication shop with less supervision
Samsung Engineering & Construction Co.,Ltd.
Formosa Plastics Corporation
Mialiao,Yun Lin Province,Taiwan R.O.C.
Tig & Arc Welder
January 1998 – January 2000
Welded heavy wall pipes for furnace
Repaired joint with RT defects
Fabricated blind flange as hydrotest material
Welded stainless steel pipes
Performed gouging works on pipes prior to modification & repair
Used precision tools & hi frequency tig welding machines
Fabricated temporary spools for use in hydro testing
Installed access ways & ladders,as well as platforms
Tamimi Construction Co.Ltd
Saline Water Desalination & Power Plant AK-III Project
Al Khobar,Saudi Arabia
Tig & Arc Welder
September 29,1995 – October 2,1997
Welded heavy wall pipes for blowdown high pressure steam lines
Welded heat resistant pipes(p11,p22) for boiler #1,#2 & #3
Repaired joints with RT defects
Interpreted isometric drawings to locate the pipe with defects
Interpreted RT films to locate the defects prior to repair
Welded stainless ateel pipes for demineralized water lines
Used precision tools & hi frequency tig welding machines for better quality
Saudi Shinwha Co.Ltd.
Sharq Polyethylene Project
Jubail Industrial City
Kingdom of Saudi Arabia
Tig & Arc Welder
February 1993 – January 1994
Welded stainless steel pipes for pelletizing silos
Used precision tools & hi frequency tig welding machines
Interpreted iso drawings to locate the pipes with defects
Interpreted RT films to locate & repair the defects at once
Welded carbon steel pipes with a diameter range of 2 inches-36 inches
Welded and installed pipe supports ang hangers
Saudi Shinwha Co.,Ltd.
Saudi Methanol Company
Ar-Razi II Project
Jubail Industrial City
Kingdom of Saudi Arabia
Tig & Arc Welder
July 1991 – November 1992
Welded heavy wall pipes
Interpreted iso drawings for modifications and rerouting scheme
Repaired joints with RT defects
Welded stainless steel pipes for demineralized water lines