Post Job Free
Sign in

Maintenance Management

Location:
Dto. Capital, Venezuela
Posted:
August 20, 2015

Contact this candidate

Resume:

*

RRE R EES SSU UUMMME EE

PERSONAL DATA:

FULL NAME: Alexander Jose Ramirez Cairo

NATIONALITY / DATE OF BIRTH: Venezuelan / October 1970 IDENTITY CARD: 10996540

MARITAL STATUS: Married

ADDRESS: Street R7. Residential complex "Puerto Principe", Lecherias. Stade Anzoategui. PHONE: Mobile: +58-414-******* HOME: +58-281-******* E-MAIL: Personal: alexander.jose.ramirez @ gmail.com Alternative: *****************@*****.***

STUDIES:

• 2004-2007. University UDO Puerto La Cruz, Venezuela Specialization in Automation and Industrial Informatics

• March 2003 Polytechnic Institute Santiago Mariño. Barcelona Venezuela Title: Electronic Engineer

• August 1993 University Institute of Technology "Antonio José de Sucre" Barcelona Venezuela Title: Senior Technician in Electronics

COMMISSIONING, START UP AND MAINTENANCE EXPERIENCED Electronic Engineer with 23 years experience in the Oil and Petrochemical area, maintenance specialties Industrial Instrumentation and Automation & Process Control (PLC, SCADA, DCS, ESD, FIRE & GAS). Good experience Scheduled plant shutdowns during the years in service. Field experienced with installation, Hook-up, commissioning and startup of new project of plants. Strong domain of the preparation of the protocol Test and Inspection, Planing and management control of Pre-commissioning and Commissioning, Star Up and Operational Delivery. Good knowledge of the processes of Planning and Project Management. Active participation and support the plant’s health, safety and environmental policies, procedures, regulations, and processes to create and maintain a clean, orderly, safe, and healthy work environment. Provide attention to detail and dedication to work in order to ensure reliability, quality and safe operations of the facility. Ability to identify issues and problems related to instrumentation, mechanical or process abnormalities and able to assist in providing solutions or appropriate alternatives. Involved in Project Administration activities such as management of Contract and Plant Operations, Support Personnel, Project Engineering Cost Analysis and Operating Budgets Cost Control, Preventive and Corrective Equipment Maintenance Planning, Procedure, PTWS, Risk Assessment, job safety analysis as well as implementation of Health, Safety & Environmental

(HSE) Standards.

CAREER HIGHLIGHTS:

PETROCEDEÑO (JOINT VENTURE TOTAL, STATOIL AND PDVSA). CAPACITY 180 MBD OF ZUATA SWEET, 2800 TPD OF PETROLEUM COKE AND 60 TPD OF SULFUR. PROJECT MANAGEMENT, UPGRADER DIVISION. FROM JANUARY 2008 TO PRESENT.

Main Projects.

- Leader Pre-commissioning, commissioning, start-up and stabilization Installation Project 12 Valves Sliding on drums Coker (6 stop valves 32 "and 6 bottom valves 60"). Delta Model Guard Curtiss Wright in Coke Plant. 2800 TONS PER DAY of petroleum coke 2800 T/D (June 2013 - February 2015).

- Leader Commissioning by 13 smaller projects in plant shutdown 2014 and 4 projects in Operational window 2104.

- Coordinator Project for the completion of Pre-Commissioning, Commissioning and startup of Reclaimer, Removal Sales Thermostable in lean amine Unit 22,5 M3/H (June 2011-January 2013).

- Leader Pre-commissioning, commissioning and commissioning of the project ARU3000 third amine unit 458.5 T/h (June 2009- September 2011).

Commissioning Leader. From August 2010 to the present. Main activities.

- Review The scope of procurement portfolio Upgrader Project to secure the resources needed to complete the test protocol Pre-commissioning, Commissioning and start.

- Make Planning, resource estimation and annual program of activities for commissioning of projects Petrocedeño enhancer.

- Approval, With specialists in Mechanical, Electrical, Instrumentation and Automation, preparation of indexes of state, testing and inspection protocols, formats to use, index Dossier Pre-Comm and Commissioning.

- Review And approval of Dossier Commissioning Pre-commissioning and completion of protocols of the RFC states (Ready for Commissioning) RFSU (Ready For Start UP) and RFHO (Ready For Hand Over).

- Follow the completion and cleanup of punch list project, complete delivery walks and closure processes project.

- Complete operation and maintenance training, have available spare to startup and specification of spare parts for two years of operation.

Specialist Commissioning Instrumentation and Automation. From January 2008 to Aug 2010.

- Programming, coordination and execution of Commissioning protocol, supervised by specialists in the areas of static, rotating, Instrumentation and electrical mechanics.

- Development and / or updating procedures and formats used by Pre-Boot for each of the specialties of Mechanical, Instrumentation, Electrical and Control Systems.

2

- Classify the project systems (gas, air, steam, water, oil, other.). Prepare database for managing Commissioning of all equipment specified in the project systems.

- Witnessing test execution and 6.9KVAC 480VAC electric motors, loop testing, functional, matrix ESD, Fire & Gas, OTP rotating equipment. Assistance to startup and stabilization of the new plant amine.

- Witnessing and approve FAT (Factory Acceptance Tests) and SAT testing systems and automated equipment.

SINCOR (Total, PDVSA and Statoil). 200 MBD extra-heavy oil. Maintenance Superintendent, Division of Production From November 2000 to December 2007.

Instrumentation Supervisor (Jun. 2006 to December 2007). 7x7 rotation.

- Selection and requisition of equipment and tools to equip the workshop Instrumentation and toolboxes for 18 Technical Instrumentalists in two groups of guard work.

- Monitor All jobs Instrumentation Maintenance preventive, corrective or projects (upgrades or improvements), located in the Main Station and 32 cluster operating (350 wells).

- Make Analysis and proposals for modifications or improvements of all those problems instrumentation or control which may affect the continuity of the process.

- Work multidisciplinary team with supervisory personnel operations of the plant to optimize the planning of maintenance activities and produce plans daily and weekly papers.

Instrumentation and Control Supervisor. Main Station 200 MBD extra-heavy (from Nov. 2000 to Jun. 2006) oil

- Commissioning Instrumentation and local control systems Main Station. Turbogenerators, oil heater, gas compressors, pumps and static equipment.

- Test of commissioning and acceptance Oasys Scada system control and the control room of the Main Station.

- Running the management plan preventive maintenance and corrective work SBC, ESD and Fire & Gas.

- Take Control of all software modifications Integrated Control System (ICS).

- Attend startup and stabilization of all the improvement projects executed.

- Develop technical skills in the technical staff in handling the Mark V control system and the overall implementation of the 3 turbo General Electric 25 MW c / u for responsibility and custody of Operation and mantto in 2002.

Supermetanol (Joint Venture of Pequiven- Ecofuel ENI). 2000 TMPD of Methanol. Industrial Complex Jose Antonio Anzoategui. Superintendent of Maintenance. Operations Management. From July 1994 to November 2000. Through some contractors SIMACA, C.M.S. C.A, DOMAR C.A, MARVENCA, COSTA NORTE C.A. y GASTEICA.

Instrumentation Technician.

Summarized Activities During the period from March 1998 to November 2000:

- Coordinator of the updating systems and equipment Automation Instrumentation plant before the arrival of 2000. Y2K Project Supermetanol in Technical Management.

- Execution of several Tie-in and modifications in the area of instrumentation improvements made on the ground.

- Planner of corrective and preventive (Department of Instrumentation) in normal process and save 1998 jobs plan.

- Inspector jobs Instrumentation for Debottlenecking Supermetanol Plant Project in Technical Management.

- Supervisor Workgroup during turnaround of plant for maintenance. Summarized Activities During the period April 1995 to February 1998:

- Preventive-maintenance to the UCN network control system Honeywell TDC-3000 and control loops in the plant.

- Preventive and corrective-maintenance plants instruments: electronic, programmable (PLC), DCS and Shut Down (ESD).

- Review And adjustment plan preventive maintenance manuals and work instructions, according to ISO 9002 procedure.

- Supervisor Workgroup during scheduled maintenance shutdowns plant 1995, 1997, 1998.

- Organization Technical Data and specification of plant instrumentation system for Symple Inventory (Warehouse).

- Installation of Thermocouples in beds, in the rebuilding of reactor methanol synthesis process.

- STAGE Precommissioning / Commisioning / START UP: Connection With control room the all field instrumentation, Continuity Test and testing of control loops, electronic transmitters calibration and commissioning of instruments. Minor changes to the system interlook emergency stop (ESD).

- PLANT CONSTRUCTION STAGE: Assemby Equipment Instrumentation and wiring junction boxes according to specifications.

TECHNOIL C.A. (Testing & Ware Line) Anaco. From July 1993 to April 1994. Petroleum Technician Registration

- Operation and maintenance of electronic sensors for in oil wells insertion, of temperature and pressure measuring with ware line equipment used by testing (static and flowing tests). Preparation of Technical Reports, Presentation and Discussion with Customers (Corpoven, Benton, Teicocu). Technical Preparation of Bills from the service.

Corpoven SA Complex St. Rosa, Anaco. From Diciembre1992 to February 1993. Instrumentation Intership Area.

- Calibratión and repair of local temperature controllers, fault annunciators and instrumentation from motor-compressors of different gas compressor stations located within the complex.

EARNED SKILLS

Conformation of successful work teams.

Development of testing protocols Pre-Commissioning and Commissioning according to specifications and customer requirements.

Commissioning strategy design, startup and stabilization equipment, packaging and processing plants..

Coordination and Project management control.

Review design of instrumentation by optimization and control applications for production processes and improvement of oil.

Design of control strategies for automation and process.

Engineering Specification instrumentation for monitoring projects and process control.

Technical proficiency in the analysis, diagnostics and troubleshooting. OUTSTANDING ACTIVITIES ON FIELD.

Basic configuration, operation and maintenance of Neles Oasys Scada system. 3

Basic configuration, operation and maintenance of distributed control system FOXBORO IA.

Maintenance detection systems Fire & Gas, Meeting pipe, ultraviolet and manual stations, UR / IR and Triple IR. Systems detection of toxic gases and flammable gases.

Fire extinguishing systems, foam injection systems, deluge valves.

Basic knowledge of Distributed Control System (TDC-3000 Honeywell) (DCS)

Operation and Maintenance Programmable Logic Controllers (GE-Fanuc, Siemens, Allen-Bradley and Telemecanique).

Control Systems GE Mark V to 25 MW turbine generators Frame 5200. Instrumentation associated auxiliary systems Frame 5200 25MW turbine generators.

Control instrumentation operation and diagnosis in rotating equipment high power. Governors speed, temperature monitoring, radial and axial vibration, ANTISURGE, seal barriers to API plan.

Analyzers PH, conductivity, oxygen, humidity, chlorine and TOC (Total Organic Carbons).

Basic Gas chromatography. Operation and maintenance of chromatographs. SOME OF THE TRAINING ATTENDED:

INTEGRAL MANAGEMENT CONTRACTS WITH PDVSA. 40 HOURS. ESP OIL. JULY 2015.

ESD CONFIGURATION AND MAINTENANCE SYSTEM AND F & G TRICOM OF TRICONEX. SCHNEIDER JULY 2015.

CONTROL SYSTEM MAINTENANCE OF FOXBORO DCS IA. 40 HOURS. SCHNEIDER JUNE 2015.

CONFIGURATION AND MANAGEMENT CONTROL SYSTEM FOXBORO DCS IA. 40 HOURS. SCHNEIDER JUNE 2015

MAINTENANCE ELECTRIC MOTOR 480VAC AND 6.9 KVAC. 24 HOURS. PDVSA MAY 2015.

MANAGEMENT INDICATORS. ADECCO 24 HOURS. FEBRUARY 2015 / VALUE ENGINEERING. CIED PDVSA 16 HOURS. SEPTEMBER 2014.

DIPLOMA IN MANAGEMENT AND CONTROL OF PROJECTS AND MAINTENANCE. JULY - SEPTEMBER 2014.

MAINTAINABILITY PARAMETERS OF MAINTENANCE RELIABILITY AND AVAILABILITY. ANALYSIS AND CALCULATION. SEPTEMBER 2014.

PLANNING, PROGRAMMING AND CONTROL MAINTENANCE OF MAYOR AND PLANT STOPS. AUGUST 2014.

VISUAL INSPECTION LEVEL 1 AND 2 JUNE 2014 / PENETRATING DYE LEVEL 1 AND 2 JUNE 2014.

PROJECT MANAGEMENT. MAY 2014 / PROJECT PLANNING FOR PLANT PADAS. MAY 2014.

WORK UPDATE PERMISSION AS PDVSA. NORMA IRS-02. FEBRUARY 2014 / RADIATION SAFETY INSPECTOR. IVIC 40 HOURS JULY 2013.

AMS SUITE 7020: INTELLIGENT DEVICE MANAGER. MAY 2013.

FUNCTIONAL SAFETY PROCESS AND SAFETY SYSTEMS INSTRUMENTED. 32 HOURS. MCL CONTROL. JUNE 2012.

ADVANCED EXCEL. 16 HOURS. GLOBALDESK. JUNE 2012 / WORKING PERMISOLOGIA PDVSA. NORMA IRS-02. 2010.

ESD CONFIGURATION AND MAINTENANCE SYSTEM AND F & G TRICOM OF TRICONEX. INVENSYS. 2010.

CONTROL SYSTEM MAINTENANCE OF FOXBORO DCS IA. 40 HOURS. INVENSYS. 2010.

CONFIGURATION AND MANAGEMENT CONTROL SYSTEM FOXBORO DCS IA. 40 HOURS. INVENSYS. 2010.

PROJECT MANAGEMENT SYSTEMS PDVSA. 40 HOURS. JANUARY 2010.

OPERATION AND MAINTENANCE PLAN API 54. JOHN CRANE 8 HOURS. OCTOBER 2007.

INCIDENT INVESTIGATION AND ROOT CAUSE ANALYSIS: ABS CONSULTING 24 HOURS. DECEMBER 2006.

LABOR LEGISLATION UPDATE (LOPCYMAT): GLOBAL MANAGEMENT NOVEMBER 2006.

MANAGEMENT CONTRACTS: MM TRAINING C.A. SEPTEMBER 2006 / PROCESS CONTROL COMPRESORES: UDO JULY 2006.

SUPERVISORY SKILLS WORKSHOP: DHOI 72 HOURS. IN MARCH 2006.

RESCUE VEHICLE WORKSHOP: METRO GROUP RESCUE OF CARACAS AUGUST 2005.

OPERATION & MAINTENANCE 3500 BENTLY NEVADA JUNE 2005.

RULES ISO14001. ENVIRONMENTAL MANAGEMENT SYSTEM. 2005

SELECTION, SIZING AND CONTROL VALVE APPLICATIONS: UDO JUNE 2004 / SETTING AND SIMULATION OF DRIVERS FOR FEEDBACK: UDO AUGUST 2004.

BRIGADE TECHNICAL EVALUATION FOR CONTROL OF EMERGENCY SINCOR / MAIN STATION: SINCOR MAY 2004.

CONTROL SYSTEMS FOR MARK V: SINCOR FEBRUARY 2004.

FEATURING THE ESSENTIALS UNIX SOLARIS 9 OE: SUN MICROSYSTEMS, INC. 40 HOURS IN NOVEMBER 2003.

TURBINES AND SUPPORT SYSTEMS: TURBOMARK5 C.A. 70 HOURS, MAY AND JUNE 2003 / RISK ASSESSMENT: SINCOR FEBRUARY 2003.

COURSE ADMINISTRATOR OF THE OASYS SCADA SYSTEM OF NELES. TELVEN CANADA. AUGUST 2002.

COURSE CONSTRUCTION OF SCREENS NELES OASYS FOR SYSTEM. TELVEN CANADA. AUGUST 2002.

SQL COURSE OF NELES OASYS FOR SYSTEM. TELVEN CANADA. AUGUST 2002.

MODERN MANAGEMENT SECURITY AND CONTROL OF LOSSES (SICIS): DET NORSKE VERITAS. 40 HOURS IN JUNE 2002.

TRAINING SYSTEMS CONTROL MARK V: TURBOMARK5, 40 HOURS, AUGUST 2001.

MONITORING PROCESS AND PEOPLE. INESTED 16 HOURS. JULY 2001.

CONTROL ENGINEERING PROJECTS AND WORKS: 20 HOURS METROPOLITAN UNIVERSITY. MAY 1998.

DRIVER LEVEL OF TANKS ENRAF NONIUS: SUPERMETANOL. 1996 / PERMITTING WORK: SUPERMETANOL. AUGUST 1995.

OPERATOR SYSTEMS: OXFORD 120 HOURS ACADEMY. APRIL 1994. TECHNICAL BASIC ELECTRICITY AND ELECTRONICS: ANACO. 120 HOURS. 1988. OTHER EVENTS:

Emerson solutions.. Lecherias July 2014.

TECHNOLOGY FAIR Rockwell. Lecherias August 2014.

INVENSYS Solutions Technology Fair. 24 Hours. Margarita. JULY 2012.

Certification as "1st BRIGADE OF RESPONSE" Awarded by SINCOR September 2004.

Seminar "SELECTION OF VALVES PLUGS instrumentation". Caracas October 2001.

Participation in the 1st VENEZUELAN ENGINEERING CONGRESS, Mérida October 1998.

Tutorial "Integrated Automation Systems" VENEZUELAN CONGRESS OF ENGINEERING, Mérida October 9, 1998. AWARDS OBTAINED:

Recognition for Extraordinary Achievement. Awarded by SINCOR. June 2002.

OSAT Program: Recognition for the contribution to the strengthening of a safe working environment. April-June 2014.



Contact this candidate