Post Job Free
Sign in

Customer Service Engineering

Location:
Minneapolis, MN
Posted:
August 18, 2015

Contact this candidate

Resume:

Edward Aguirre

*** ***** ******

St. Paul, MN ***02

(H) 651-***-****

Cell 651-***-****

***************@*******.***

Summary: Production/Inventory Control and Scheduling Professional with extensive experience in Manufacturing and MRP planning systems.

Adept in MRP planning and scheduling

LEAN Manufacturing Principles Training

ISO 9000 Quality systems training as an auditor

APICS classes attended

Demonstrated skill in inventory management policies and procedures

Accomplished supervisory skills

Excellent interpersonal and organizational skills

Inventory management and computer systems knowledge:

BPCS Business planning and control systems

MAPICS Inventory system on the AS400 release 5

INFOR ERP XA Power-Link Planning System

Word, Excel, PowerPoint, Outlook Express

Employment:

April 2012 – Present: Planner/Expeditor at Thiele Technologies, Inc.

Monitor progress of materials and purchased parts along with fabricated parts for customized packaging equipment

Expedite shortages of parts and materials working with appropriate resources

Act as a liaison among various internal and external departments to meet schedule

Develop, prioritize & monitor the schedule to ensure flow of parts

Process engineering changes along with returns to stock or vendor as required

Order and receive steel required for fabrication

Work with outsourcing of parts for fabrication, plating as required

Work with other Thiele divisions using their machine resources to meet our needs

Coordinate the shipping of machines

Input and review shop and engineering labor in the accounting system

Coordinate and balance available assembly and fabrication capacity levels

Process all transactions related to rolling up and receiving in MO’s

Periodically check project costs to monitor current machine status

Work within the Value Stream to ensure machinery is shipped on time, to projected margins and identify possible causes and conditions which prevent that from occurring

Provide training, guidance and general daily work direction to Parts Runners

Edward Aguirre

Page 2

Other duties as assigned by Value Stream Leader

2001 – 2011: Production Planner Scheduler, KwikFile (Plant Closed 10/31/11)

Scheduled and planned fabrication in 30 work centers via daily review of MRP for integrated filing systems

Ensured work center capacities were level via real time capacity planning

Plan and purchase all steel for fabrication. Average inventory value $180,000. Average monthly turns are 20 – 21

Consignment program for steel started in 2009

Schedule and purchase paint for paint line

Worked closely with Engineering, Manufacturing Engineering, Quality and Shop Floor Supervisors

Achieved average monthly inventory turns of 17+ on a monthly inventory value of $750,000 in fabricated and purchased components

Monthly shipments average $1.6 million

Involved with annual physical inventory as required

Coordinated interplant transfers of inventory with sister company in Wisconsin

Trained in LEAN practices and involved with several successful project teams

1998 – 2001: Senior Planner, Timesavers Incorporated (Layoff and plant closing)

Scheduled and planned purchased and fabricated parts via daily review of MRP for customized metal and wood finishing equipment

Streamlined and reduced steel inventories via planning and cycle counting

Provided support to other facilities ensuring timely delivery of their needs

Diagnosed part shortage problems for customer service and resolved problems ensuring timely delivery to customers

Worked closely with Engineering, Manufacturing Engineering, Quality, and Shop Floor Supervisors

Provided support with engineering change processing

Ensured work center capacities were level

Controlled estimated inventories of $1.5 million in fabricated inventory and $1.7

Million in purchased inventories along with $225,000 in steel inventories

1986 – 1998 Production Planner and Stockroom Supervisor, Despatch Industries (Layoff and plant closing)

Scheduled and planned fabricated parts via daily review of MRP

For customized industrial heat treating equipment

Processed engineering changes and updates for manufacturing

Edward Aguirre

Page 3

Published weekly parts shortage reports for manufacturing

Worked closely with Engineering, Purchasing, Quality, Shop Floor Supervisors, and also with customer service

Directed the activity of the production control department during supervisors absence

Successfully supervised 3 stockroom union workers ensuring timely receiving of and delivery of parts to production from 1992 to 1997

Controlled interplant transfers of inventories on a daily basis

Conducted monthly cycle counts achieving 96% to 98% accuracy

Responsible for coordinating year end physical inventory

Coordinated excess inventory reduction and disposal

Facilitated outsourcing of work for laser cutting, forming, punching and machining as needed to support manufacturing schedules

Performed duties as Safety Director conducting safety meetings and safety training for shop employees for a 3 year period

1983 – 1985 Production Planner, American Hoist and Derrick Co. (Plant Closing)

1979 – 1983 Inventory Specialist, Great Plains Supply Company

Education:

Accounting certificate from St. Paul Technical College

Basic Workplace Safety Certificate from the Minnesota Safety Council

Have attended some of the APICS courses

LEAN Manufacturing training with Kwikfile

Communication Skills training with Thiele

ISO 9000 training with Despatch



Contact this candidate