RICHARD JOHN GASAPO SEGUNLA RME
Blk. ** Lot ** ACM Paramount Homes
Brgy. Navarro, Gen. Trias, Cavite
Mobile No:+973-********
Email Add: acr7v3@r.postjobfree.com
OBJECTIVES
To become part of an organization involved in Oil, Gas, Power and Petrochemical Industries. To participate in the success of the project through the application of knowledge, proficiencies, skills and experiences with a group of professionals and technical people in their respective, progressive and internationally recognized system that offers opportunities for Continuing Professional Development (CPD).
TECHNICAL QUALIFICATION
PROJECT ENGINEER
MECHANICAL PIPING QA/QC
QUANTITY SURVEYOR ENGINEER
MECHANICAL PIPE ENGINEER
PROCESS ENGINEER
MAINTENANCE ASSISTANT HEAD
TECHNICAL ASSISTANT ENGINEER
MECHANICAL TECHNICAL ASSISTANT
ELIGIBILITY
Permit to Work Receiver (BAPCO) – March 2013
Registered/ Licensed Mechanical Engineer - April 2003 (PRC - Philippines)
System Application and Products in Data Processing (SAP) user
Microsoft Office user
Knowledgeable in AutoCAD
Knowledgeable in Primavera
Knowledgeable in diesel engine troubleshooting & overhauling
Knowledgeable in trouble shooting pneumatics & hydraulic systems
Knowledgeable in trouble shooting PLC (controls & sensors)
Knowledgeable in trouble shooting air conditioning system
Member of Philippine Society of Mechanical Engineers (PSME - Bahrain Chapter)
WORK EXPERIENCE
Sept. 6, 2011 – Present Quantity Surveyor
Mechanical Contracting and Services Company W.L.L.
Construction Department
BAPCO/BANAGAS/ALBA
Kingdom of Bahrain
Responsibilities
Review the contract in terms scope of work, obligations to the client, schedules, possible areas of concerns, and action plans prior to contract signing.
Cost planning and monitor budgetary allocation for every activity in reference to the overall project budget.
Preparing tender and contract documents, including bills of quantities for bidder’s coatings.
Monitors and evaluates project operations.
Prepare Commercial and technical evaluation and make a recommendation on the selected Subcontractor/Supplier.
Collect & submit to the proponent the required document for vendor accreditation.
Undertaking costs analysis for construction and maintenance works.
Providing advice on contractual claims and allocate work to subcontractors.
Prepare all require documents and cost calculation for claims of extra cost due to design and scope variation.
Assist in dispute resolution.
Prepare monthly progress measurement.
Valuating the completed work and arranging payments for subcontractors.
Dec. 15, 2010 –Sept. 6, 2011 PROJECT ENGINEER
Hyundai Engineering &Contraction
Piping Department
Karan Gas Plant
Khursaniyah, Saudi Arabia
Responsibilities
Prepare project methodology.
Prepare construction material approval request and technical quires.
Implement the Project Construction Quality Program at site.
Prepare & monitor the list of deliverables as per project requirement.
Interface with procurement to review the status of procurement activities and take corrective action as needed
Organize weekly review meetings with the client to discuss progress achieved to date as well as a forecast for the following week in addition to any other issues which need to be resolved.
Interface with other Company if required as per
Co-ordinate with the expediting team for delivery of equipment and materials.
March 1, - Sept. 1, 2010 Mechanical Piping Inspector
Mubarak M. Al-Hajri Cont. Est (Employer)
Al-AnBinali& Sons Comp.
QA/QC Department
Maaden Phosphate Plant
Raz Al Azur, Saudi Arabia
Responsibilities
Assure that the Project Construction Quality Program are implemented in orderly manner.
Study and understand the project scope and specifications as well as the ITP’s and Method statements with respect to piping fabrication, installation and testing.
Receive the RIN (Request for Inspection Notice) from the discipline staff and carry out the inspection of the piping, fabrication, installation and testing as per the ITP, identify any discrepancies and generate the Non Conformance Report. Prepare test package
Support pre fabrication activities for the pipes in the areas of, drawings, specifications, as well as the right use of valves.
Carry out the mechanical inspection after the line has been fully installed
Conduct visual inspection on Pipe cleaning and oversee the hydro testing process including the selection of joints as per ITP, identifying the test limits ensuring the usage of proper gauges.
Carry out inspection of and report any major quality issues to the Quality Manager
Coordinate with the Project’s Safety, Environment and certification engineer and ensure that all statutory requirements are met
Plan and direct internal and external quality audits and review all certification and documentation to ensure validity and compliance with specifications, drawings, and manufacturing and inspection test plans.
Nov. 3,2010– Feb. 28, 2010 Mechanical Piping and Quantity Surveyor
Mubarak M. Al-Hajri Cont. Est (Employer)
Shaw Stone & WesternYanbu
Subcontracts Department
Yansab, HDPE Project
Yanbu, Saudi Arabia
Responsibilities
Verifies the contractor’s material take off
Prepares rate analysis.
Checks and approves RA bills with contractor
Coordinates with Contractor and Clients Departments.
Monitors and evaluates project operations.
Checks the drawings provided by the Engineering Department if it follows the detailing and specifications provided in the mark-ups.
Prepares Bill of Quantities with cost estimate.
Assesses and validates Change Orders for the final approval of the client (YANSAB)
Validates manpower required and number of days for a specified change order, materials and equipments needed as per scope of works to be done.
Evaluates cost & change order as per BOQ rate, by star rate or timesheet and do recommendation for both parties to be agreed upon(client & sub-contractor).
Evaluates change order cost for mechanical discipline like piping, equipment, structural, etc. based on the contract of the project.
Verifies works done at site if it complies with the requirements of work order.
Coordinates with the contractors and sub-contractors engineer with regards to change order Requested and implemented.
Attends the weekly coordination meeting together with the sub-contractors personnel for concerns and status of additional works on the project.
Performs official documentation and reports pertaining to additional works and construction matters.
Aug. 1, 2008 – Aug. 1, 2009 Mechanical Piping Engineer
Mubarak M. Al-Hajri Cont. Est (Employer)
Mohd. F. Alhajri Contracting Est.
Mechanical Piping Dept.
Saudi Aramco Abqaiq, Plant 3, TIG Gas Dehydration
System Installation
Abqaiq, Saudi Arabia
Responsibilities
Reviews contract requirements for project execution
Prepares Material Takeoff (MTO)
Prepares all Weld Maps for Welding Process of Pipes to be weld in work shop and in field.
Ensures that all welds meets the project requirements and in accordance to the WPS
Implements the Project Construction Quality Program at site
Checks material specification of all pipe and fittings before start of welding process, referring to Saudi Aramco Material Specification.
Prepare Piping Hydro test Package.
Performs Actual Site Line Checks and Verification as per Approved Isometric drawings
Prepares Daily Fabrication and erection Activity and Reports.
Prepares weld monitoring.
Prepares weekly welding and installation reports.
Ascertains that Safety for Welding, Testing and Related Activities are being implemented
Supervises and monitor Hydro test of all pipe lines, valves and tie in spools.
Supervises and monitor air leak test of all wear pads and pipe saddles.
June 18, 2007 – June 2, 2008 Process Engineer
Engineering Department
M.A Technology Inc.
CEPZ, Rosario, Cavite Philippines
Responsibilities
Supervises the daily output and activities to meet certain delivery dates
Monitors & evaluates the performance of his subordinates and provides recommendation regarding their status
Determines and investigates troubles and advises means of solving or eliminating them
Devises new targets and goals through work measurements and method studies through application proper work procedures.
Conducts preventive maintenance on all production machines & equipments
Lay out electrical wirings for new installed production equipment
Jan. 25, 2006 – Mar. 27, 2007 Maintenance Assistant Head
Maintenance Department
Ogami Corporation, FCIE
Dasmariñas Cavite
Responsibilities
Checks & approves the activities to ensure that the standards are appropriately met
Determines and investigates troubles and advises means of solving or eliminating them
Revise and improves maintenance related procedures and guidelines when needed
Person in-charge of Chemical handling management plan
Chairperson of Environmental Management Systems Conservation Committee
Trains all employees regarding conservation management plan
Prepares & formulates conservation management plan for the company
Supervise erection/Installation of new production facilities and equipment. (Water treatment facility and other industrial equipment.)
June 30, 2005 – Dec. 30, 2005 Technical Asst. Engineer
Technical Department
Philharbor Ferries & Port Services Inc.
Madrigal Business Park, Alabang
Responsibilities
Supervises dry docking of vessels
Supervises overhauling activities for vessel engines & accessories
Determines vessel’s hull areas
Monitors fuel & oil consumption of all vessels
Formulates preventive maintenance system checklist
Consolidates and make reports from chief engineers & technical engineers
Fleet monitoring of vessel
Conducts troubleshooting of diesel engines
International safety management coordinator
Conducts internal quality audit to Roll-on/Roll-off (RORO) vessels
Conducts sanitation and hygiene inspection to Roll-on/Roll-off (RORO) vessel
Prepare reports for operations meeting
Designs system for a particular process (Bunkering)
Communicates with the vessels operation
Oct. 2003 – June 10, 2005 Mechanical Technical Assistant
Mechanical Department
A-1 Ship Builder & Ship Repair Corp.
Lapaz, Iloilo City
Responsibilities
Performs survey and make work estimate of the reported problems
Facilitates repair requisition of vessel ¦s engine parts
Ensures the availability of requested parts from Purchasing and warehouse
Recommends reconditioning of engines parts
Plans & schedule proper manpower allocation & work assignments
Conducts overhauling & troubleshooting activities whenever necessary
Designs & computes engines specifications & other mechanical requirements
Designs drawing plans for marine mechanical parts
TRAININGS & SEMINARS
Saudi Aramco Safety Orientation – Saudi Aramco – Mar. 2009
ISO 9001- 2000 - Ogami Corp. – Jan. 2006
5S & Safety Awareness - Ogami Corp. – Jan. 2006
ISO 14001: 2004 – Introductory & Documentation Seminar – Aug. 2006
Phil. Environment Legislation Seminar – Aug. 2006
Solutions General in Electrical & Electromechanical Needs – Mar. 2006
Chemical Safety Seminar – Oct. 2006
EDUCATIONAL BACKGROUND
COLLEGE
1997 - 2002 Bachelor of Science in Mechanical Engineering
AdamsonUniversity
Ermita, Manila
SECONDARY
1996 – 1997 Sto. Niño Catholic School
Taguig, Metro Manila
1995 – 1996 La ConsolacionCollege
La CarlotaCity, Negros Occidental
1993 – 1995 Cabarrus Catholic College
San Jose, Sipalay City
Negros Occidental
ELEMENTARY
1987 – 1993 Cabarrus Catholic College
San Jose, Sipalay City
Negros Occidental
LANGUAGE PROFECIENCY
Tagalog – Mother tongue English – Good (Speaking and Writing)
PERSONAL DATA
Age: 34 Sex: Male
Birth date: Nov. 01, 1979 Citizenship: Filipino
Birthplace: Negros Occidental, Phil. Marital Status: Married
Name of Spouse: Riza Jude M. Segunla No. of Children: Two (2)
Religion: Roman Catholic Nationality: Filipino
License No: RME 0062307 Current Location: Kingdom of Bahrain
CHARACTER REFERENCES
Will be furnished upon request