Post Job Free

Resume

Sign in

Engineer Project

Location:
Bahrain
Posted:
October 26, 2015

Contact this candidate

Resume:

RICHARD JOHN GASAPO SEGUNLA RME

Blk. ** Lot ** ACM Paramount Homes

Brgy. Navarro, Gen. Trias, Cavite

Mobile No:+973-********

Email Add: acr7v3@r.postjobfree.com

OBJECTIVES

To become part of an organization involved in Oil, Gas, Power and Petrochemical Industries. To participate in the success of the project through the application of knowledge, proficiencies, skills and experiences with a group of professionals and technical people in their respective, progressive and internationally recognized system that offers opportunities for Continuing Professional Development (CPD).

TECHNICAL QUALIFICATION

PROJECT ENGINEER

MECHANICAL PIPING QA/QC

QUANTITY SURVEYOR ENGINEER

MECHANICAL PIPE ENGINEER

PROCESS ENGINEER

MAINTENANCE ASSISTANT HEAD

TECHNICAL ASSISTANT ENGINEER

MECHANICAL TECHNICAL ASSISTANT

ELIGIBILITY

Permit to Work Receiver (BAPCO) – March 2013

Registered/ Licensed Mechanical Engineer - April 2003 (PRC - Philippines)

System Application and Products in Data Processing (SAP) user

Microsoft Office user

Knowledgeable in AutoCAD

Knowledgeable in Primavera

Knowledgeable in diesel engine troubleshooting & overhauling

Knowledgeable in trouble shooting pneumatics & hydraulic systems

Knowledgeable in trouble shooting PLC (controls & sensors)

Knowledgeable in trouble shooting air conditioning system

Member of Philippine Society of Mechanical Engineers (PSME - Bahrain Chapter)

WORK EXPERIENCE

Sept. 6, 2011 – Present Quantity Surveyor

Mechanical Contracting and Services Company W.L.L.

Construction Department

BAPCO/BANAGAS/ALBA

Kingdom of Bahrain

Responsibilities

Review the contract in terms scope of work, obligations to the client, schedules, possible areas of concerns, and action plans prior to contract signing.

Cost planning and monitor budgetary allocation for every activity in reference to the overall project budget.

Preparing tender and contract documents, including bills of quantities for bidder’s coatings.

Monitors and evaluates project operations.

Prepare Commercial and technical evaluation and make a recommendation on the selected Subcontractor/Supplier.

Collect & submit to the proponent the required document for vendor accreditation.

Undertaking costs analysis for construction and maintenance works.

Providing advice on contractual claims and allocate work to subcontractors.

Prepare all require documents and cost calculation for claims of extra cost due to design and scope variation.

Assist in dispute resolution.

Prepare monthly progress measurement.

Valuating the completed work and arranging payments for subcontractors.

Dec. 15, 2010 –Sept. 6, 2011 PROJECT ENGINEER

Hyundai Engineering &Contraction

Piping Department

Karan Gas Plant

Khursaniyah, Saudi Arabia

Responsibilities

Prepare project methodology.

Prepare construction material approval request and technical quires.

Implement the Project Construction Quality Program at site.

Prepare & monitor the list of deliverables as per project requirement.

Interface with procurement to review the status of procurement activities and take corrective action as needed

Organize weekly review meetings with the client to discuss progress achieved to date as well as a forecast for the following week in addition to any other issues which need to be resolved.

Interface with other Company if required as per

Co-ordinate with the expediting team for delivery of equipment and materials.

March 1, - Sept. 1, 2010 Mechanical Piping Inspector

Mubarak M. Al-Hajri Cont. Est (Employer)

Al-AnBinali& Sons Comp.

QA/QC Department

Maaden Phosphate Plant

Raz Al Azur, Saudi Arabia

Responsibilities

Assure that the Project Construction Quality Program are implemented in orderly manner.

Study and understand the project scope and specifications as well as the ITP’s and Method statements with respect to piping fabrication, installation and testing.

Receive the RIN (Request for Inspection Notice) from the discipline staff and carry out the inspection of the piping, fabrication, installation and testing as per the ITP, identify any discrepancies and generate the Non Conformance Report. Prepare test package

Support pre fabrication activities for the pipes in the areas of, drawings, specifications, as well as the right use of valves.

Carry out the mechanical inspection after the line has been fully installed

Conduct visual inspection on Pipe cleaning and oversee the hydro testing process including the selection of joints as per ITP, identifying the test limits ensuring the usage of proper gauges.

Carry out inspection of and report any major quality issues to the Quality Manager

Coordinate with the Project’s Safety, Environment and certification engineer and ensure that all statutory requirements are met

Plan and direct internal and external quality audits and review all certification and documentation to ensure validity and compliance with specifications, drawings, and manufacturing and inspection test plans.

Nov. 3,2010– Feb. 28, 2010 Mechanical Piping and Quantity Surveyor

Mubarak M. Al-Hajri Cont. Est (Employer)

Shaw Stone & WesternYanbu

Subcontracts Department

Yansab, HDPE Project

Yanbu, Saudi Arabia

Responsibilities

Verifies the contractor’s material take off

Prepares rate analysis.

Checks and approves RA bills with contractor

Coordinates with Contractor and Clients Departments.

Monitors and evaluates project operations.

Checks the drawings provided by the Engineering Department if it follows the detailing and specifications provided in the mark-ups.

Prepares Bill of Quantities with cost estimate.

Assesses and validates Change Orders for the final approval of the client (YANSAB)

Validates manpower required and number of days for a specified change order, materials and equipments needed as per scope of works to be done.

Evaluates cost & change order as per BOQ rate, by star rate or timesheet and do recommendation for both parties to be agreed upon(client & sub-contractor).

Evaluates change order cost for mechanical discipline like piping, equipment, structural, etc. based on the contract of the project.

Verifies works done at site if it complies with the requirements of work order.

Coordinates with the contractors and sub-contractors engineer with regards to change order Requested and implemented.

Attends the weekly coordination meeting together with the sub-contractors personnel for concerns and status of additional works on the project.

Performs official documentation and reports pertaining to additional works and construction matters.

Aug. 1, 2008 – Aug. 1, 2009 Mechanical Piping Engineer

Mubarak M. Al-Hajri Cont. Est (Employer)

Mohd. F. Alhajri Contracting Est.

Mechanical Piping Dept.

Saudi Aramco Abqaiq, Plant 3, TIG Gas Dehydration

System Installation

Abqaiq, Saudi Arabia

Responsibilities

Reviews contract requirements for project execution

Prepares Material Takeoff (MTO)

Prepares all Weld Maps for Welding Process of Pipes to be weld in work shop and in field.

Ensures that all welds meets the project requirements and in accordance to the WPS

Implements the Project Construction Quality Program at site

Checks material specification of all pipe and fittings before start of welding process, referring to Saudi Aramco Material Specification.

Prepare Piping Hydro test Package.

Performs Actual Site Line Checks and Verification as per Approved Isometric drawings

Prepares Daily Fabrication and erection Activity and Reports.

Prepares weld monitoring.

Prepares weekly welding and installation reports.

Ascertains that Safety for Welding, Testing and Related Activities are being implemented

Supervises and monitor Hydro test of all pipe lines, valves and tie in spools.

Supervises and monitor air leak test of all wear pads and pipe saddles.

June 18, 2007 – June 2, 2008 Process Engineer

Engineering Department

M.A Technology Inc.

CEPZ, Rosario, Cavite Philippines

Responsibilities

Supervises the daily output and activities to meet certain delivery dates

Monitors & evaluates the performance of his subordinates and provides recommendation regarding their status

Determines and investigates troubles and advises means of solving or eliminating them

Devises new targets and goals through work measurements and method studies through application proper work procedures.

Conducts preventive maintenance on all production machines & equipments

Lay out electrical wirings for new installed production equipment

Jan. 25, 2006 – Mar. 27, 2007 Maintenance Assistant Head

Maintenance Department

Ogami Corporation, FCIE

Dasmariñas Cavite

Responsibilities

Checks & approves the activities to ensure that the standards are appropriately met

Determines and investigates troubles and advises means of solving or eliminating them

Revise and improves maintenance related procedures and guidelines when needed

Person in-charge of Chemical handling management plan

Chairperson of Environmental Management Systems Conservation Committee

Trains all employees regarding conservation management plan

Prepares & formulates conservation management plan for the company

Supervise erection/Installation of new production facilities and equipment. (Water treatment facility and other industrial equipment.)

June 30, 2005 – Dec. 30, 2005 Technical Asst. Engineer

Technical Department

Philharbor Ferries & Port Services Inc.

Madrigal Business Park, Alabang

Responsibilities

Supervises dry docking of vessels

Supervises overhauling activities for vessel engines & accessories

Determines vessel’s hull areas

Monitors fuel & oil consumption of all vessels

Formulates preventive maintenance system checklist

Consolidates and make reports from chief engineers & technical engineers

Fleet monitoring of vessel

Conducts troubleshooting of diesel engines

International safety management coordinator

Conducts internal quality audit to Roll-on/Roll-off (RORO) vessels

Conducts sanitation and hygiene inspection to Roll-on/Roll-off (RORO) vessel

Prepare reports for operations meeting

Designs system for a particular process (Bunkering)

Communicates with the vessels operation

Oct. 2003 – June 10, 2005 Mechanical Technical Assistant

Mechanical Department

A-1 Ship Builder & Ship Repair Corp.

Lapaz, Iloilo City

Responsibilities

Performs survey and make work estimate of the reported problems

Facilitates repair requisition of vessel ¦s engine parts

Ensures the availability of requested parts from Purchasing and warehouse

Recommends reconditioning of engines parts

Plans & schedule proper manpower allocation & work assignments

Conducts overhauling & troubleshooting activities whenever necessary

Designs & computes engines specifications & other mechanical requirements

Designs drawing plans for marine mechanical parts

TRAININGS & SEMINARS

Saudi Aramco Safety Orientation – Saudi Aramco – Mar. 2009

ISO 9001- 2000 - Ogami Corp. – Jan. 2006

5S & Safety Awareness - Ogami Corp. – Jan. 2006

ISO 14001: 2004 – Introductory & Documentation Seminar – Aug. 2006

Phil. Environment Legislation Seminar – Aug. 2006

Solutions General in Electrical & Electromechanical Needs – Mar. 2006

Chemical Safety Seminar – Oct. 2006

EDUCATIONAL BACKGROUND

COLLEGE

1997 - 2002 Bachelor of Science in Mechanical Engineering

AdamsonUniversity

Ermita, Manila

SECONDARY

1996 – 1997 Sto. Niño Catholic School

Taguig, Metro Manila

1995 – 1996 La ConsolacionCollege

La CarlotaCity, Negros Occidental

1993 – 1995 Cabarrus Catholic College

San Jose, Sipalay City

Negros Occidental

ELEMENTARY

1987 – 1993 Cabarrus Catholic College

San Jose, Sipalay City

Negros Occidental

LANGUAGE PROFECIENCY

Tagalog – Mother tongue English – Good (Speaking and Writing)

PERSONAL DATA

Age: 34 Sex: Male

Birth date: Nov. 01, 1979 Citizenship: Filipino

Birthplace: Negros Occidental, Phil. Marital Status: Married

Name of Spouse: Riza Jude M. Segunla No. of Children: Two (2)

Religion: Roman Catholic Nationality: Filipino

License No: RME 0062307 Current Location: Kingdom of Bahrain

CHARACTER REFERENCES

Will be furnished upon request



Contact this candidate