CAREER SUMMARY
Over 30 years of progressively responsible experience in the area of: feasibility studies, concept design, mechanical engineering, contract project management, construction management, maintenance management and commissioning of coal, oil and gas power generation plants with capacity up to 4,000MW.
Specific field of expertise includes the following:
Documentation design review and approval of subcritical and supercritical boilers and balance of plant including: coal and ash handling plants, flue gas desulfurization plants (FGD), water treatment plants, waste water treatment plants, cooling water systems, feed water system and auxiliary equipment.
Construction Management
Quality Control
Troubleshooting
Commissioning
Environment, Health & Safety Management.
PROFESSIONAL EXPERIENCE
Nov. 2014 to Sept. 2015 Tractebel Engineering- Bangkok
Position: Consultant to Owner’s Engineer
Project: 2x600MW Coal Fired Power Plant – Vinh Tan 4-Vietnam
Verification of design documentation, review and approval of 2 supercritical boilers and ancillary equipment and balance of plant including: coal and ash handling system, condensate and steam lines, pressure vessels, storage tanks, piping, cooling water system, desulfurization of flue gases system, WTP&WWTP and auxiliary equipment
Review and approval of EPC Contractor’s documentation, Inspection and Test Plan and erection method statement
Participating in Technical Engineering Meetings
Technical advice to Owner Engineers
Construction supervision
Quality Control
Troubleshooting
Plant’s Commissioning
Health, Safety and Environment issues
2014 Worley Parsons - Malaysia
Position: Senior Residence Engineer
Project: 2x535 MW Combined Cycle Power Plant
Staff reporting: 3 Senior Engineers, 8 Field Engineers
Verification of design documentation, review and approval of subcritical boilers and ancillary equipment, balance of plant including: fuel gas supply system, feed water system, condensate and steam lines, pressure vessels, piping, cooling water system, WTP&WWTP plant, and auxiliary equipment
Review and approval of EPC documentation
Project management
Construction supervision
Project site progress monitoring
Quality Assurance & Quality Control
Troubleshooting
Commissioning of equipment
Health, Safety and Environment Management
2013 Parsons Brinckerhoff – Saudi Arabia
Position: Lead Mechanical Engineer- (Owner’s Engineering)
Project: 4x700 MW Oil Fired Thermal Power Plant
Responsibilities:
Staff reporting: 4 Senior Engineers, 6 Field Engineers
Verification of design documentation, review and approval of 4 supercritical boilers and ancillary equipment, flue gas desulfurization plant (FGD), electrostatic precipitators (ESP), feed water system, pressure vessels, storage tanks, piping, cooling water system, desalination plant, WTP & WWTP, and auxiliary equipment
Review and approval of EPC Contractor’s documentation
Construction supervision and Quality Control
Health, Safety and Environment Management
Chairing the weekly meetings with EPC contractor
Commissioning of equipment
2012 ILF Consulting Engineers - Saudi Arabia
Position: Senior Mechanical Engineer (Owner’s Engineering)
Project: 3x80 MW Simple Cycle Gas Turbine Power Plant
Responsibilities:
Verification of design documentation, review and approval of power plant equipment of 3x80 MW GE Gas Turbines and balance of plant including: fuel oil supply, pressure vessels, fuel oil storage tanks, piping and auxiliary equipment.
Construction management of mechanical equipment installation
Review and approval of EPC documentation
Project management
Construction supervision and Quality Control
Troubleshooting
Commissioning of plant
2010 - 2011 Merak Energi Indonesia,
Cilegon, Banten
Position: Construction Site Manager
Project: 120MW Coal Fired Thermal Power Plant
Responsibilities:
Staff reporting: 4 Lead Engineers, 4 Senior Engineers,
12 Field Engineers and administration staff
Verification of design documentation, review and approval of power plant equipment : 2 steam turbines, 2 CFB boilers and ancillary equipment, balance of plant including: coal and ash handling plant, condensers, pressure vessels, cranes and auxiliary equipment.
Project management
Management of the Owner site facilities, staff and resources
Verification of EPC contractor milestone payment
Ensure that adequate site staff and resources are in place for effective and timely execution of project
Project site progress monitoring
Ensure that contractor’s and subcontractors’ QA and QC system is implemented and in place
Review and approval of EPC Contractor’s Inspection and Test Plan, equipment, shop inspections and releasing equipment for shipment
Construction site management
Project cost control and reporting
Progress monitoring of EPC contractor, liaison with the contractor and solving technical matters
Chairing daily, weekly and monthly meetings with EPC contractor
Commissioning of plant
Health, Safety and Environment management
2008 to 2009 Fichtner GmbH & Co.KG - Consultants to EPC Contractor Lilama Ho Chi Minh, Vietnam
Position: Lead Mechanical Engineer
Project: Nhon Trah II-750MW Combined Cycle Power Plant
Responsibilities:
Verification of design documentation, review and approval of power plant equipment
Comments and recommendations regarding the plant design of 2 Siemens SGT5-4000F Gas Turbines and 1 SST5-5000 Steam Turbine, 2 Doosan boilers and ancillary equipment, balance of plant including: piping, gas cleaning system, WTP, WWTP, pressure vessels, storage tanks and auxiliaries.
Quality Control
Progress and schedule monitoring
Attending technical meetings with contractors and solving technical matters related to the project
Construction supervision
Commissioning of the equipment
2003– 2007 180MW Osborne Combined Cycle Power Plant – Adelaide, South Australia
Position: Lead Mechanical Engineer
Project: Plant Optimization
Responsibilities: Project management
Plant performance assessment
Planning and coordination of maintenance works,
defects identifications and rectification
Documentation review and approval
Preparation of warranty maintenance and replacement schedules for 1 GE Frame 9E gas turbine, 1 GE steam turbine, 1Heat Recovery Steam Generator, balance of plant and auxiliaries
Construction supervision
Commissioning of equipment
2000 -2002 520MW Coal Fired Thermal Power Station, Flinders Power - South Australia
Position: Lead Mechanical Engineer
Project: Plant Major Overhaul
Responsibilities:
Assessment and recommendations regarding replacement, refurbishment and repairs of boiler high pressure parts and balance of plant including: piping, fans, coal and ash handling plant, ESP and auxiliary equipment.
Project management
Construction supervision and quality control
Troubleshooting
Preparation of the equipment replacement program
Advise on selection of materials and equipment
Planning, scheduling, liaison and coordinating works with contactors
1998 -1999 Fluor Daniel, Melbourne, Australia
Position: Senior Mechanical Engineer
Project: 1000MW Loy Yang Coal Fired Thermal Power Station.
Responsibilities:
Investigations and monitoring of power plant performance
Preparation of maintenance preventive, proactive and predictive program for balance of plant including: coal and ash handling plant, ESP and auxiliaries Root cause analysis
Troubleshooting
Quality Control
Preparing power plant’s preventive and proactive maintenance program.
1996-1997 Peter Walker Consultants, Dairy Plant, New Zealand
Position: Construction Manager
Projects: Power Plant Expansion Project
Responsibilities:
Contract project management
Design documentation review
Oil fired boilers and balance of plant construction’s supervision, testing and certification
Coordination of mechanical contracts
Quality Control
Planning, progress monitoring and reporting
Contracts quality control, inspections, approval and certification
Construction Management
Commissioning of the plant
1995 Design Power Consultants, Wellington, New Zealand
Position: Senior Design Engineer
75MW New Zealand Steel Corporation Cogeneration Power Plant
Responsibilities:
Feasibility studies, design review, preparation technical specification for 75MW cogeneration power plant including steam boilers, steam turbines and balance of plant
Assessment of technical data, performance criteria, operational requirements
Project management
Implementation phase, coordination and inspection of works
1990 - 1994 300MW Orlando Coal Fired Thermal Power Station, Johannesburg, South Africa
Position: Deputy Station Manager
Staff reporting: 500
Annual budget: $20 million
Responsibilities:
Management of the Maintenance Department of 20 high pressure steam boilers and10 steam turbine generators and balance of plant including: coal and ash handling plant, piping and auxiliary equipment.
Budget and cost management of the plant
Ensure company policies with regard to purchasing and risk management Plant asset management, life extension and continuous improvement for high pressure steam boilers, steam turbines, piping, pumps, coal and ash handling plant, cooling system and auxiliary equipment
Quality Assurance & Quality Control
Management of maintenance projects
Evaluation of contracts tender documents and approval
Liaison and coordinating technical activities with outside consultants and contractors regarding plant’s maintenance and overhauls
Management of new contracts, shuts-down, refurbishment, modifications and commissioning of boilers, cooling systems and auxiliaries
Root cause analysis and predictive preventive maintenance program
Commissioning of equipment
Health and Safety management
1988 - 1989 Hamon Sobelco, Johannesburg, South Africa
Position: Construction Manager
Projects: Construction of Cooling Towers.
Responsibilities:
Contract value: USD100 million
Staff reporting: 15
Cooling towers contract project management
Design review, planning, scheduling and cost control of cooling systems
Construction management, quality control and commissioning of cooling systems, piping, pumps and heat exchangers
Quality Assurance and Quality Control
Preparation of commissioning, maintenance and shutdown plan
1982 - 1987 Electricity Supply Commission (EKOM), South Africa
Position: Senior Mechanical Engineer
Projects: Construction of 3600MW Duvha and
4000MW Kendal Coal Fired Thermal Power Plants
Contract value: USD 5 billion
Responsibilities:
Verification of the design documentation
Managing mechanical project schedule and budget
Planning, construction management and progress monitoring of various contractors responsible for installation of 6 Combustion Engineering high pressure steam boilers with natural circulation and 6x667MW KWU steam turbines with generating capacity of 4,000MW and balance of plant including: boilers and ancillary equipment, coal and ash handling plant, ESP, piping and auxiliary equipment
Quality Control
Construction Supervision
Commissioning of power plant equipment
HSE
1976 - 1981 Foster Wheeler, Sosnowiec-Poland
Position: Construction Manager
Projects: Construction/Maintenance Management of Boiler Plants
Responsibilities:
Review design documentation
Responsible for the construction project management of coal, oil, gas and biomass fired steam boilers and balance of plant.
Planning, supervision and progress monitoring of high pressure boilers
Construction Management
Quality control and troubleshooting
Commissioning and start-up of boiler plants
Boiler plants maintenance management