Post Job Free
Sign in

Commissionig

Location:
Newcastle upon Tyne, T & W, United Kingdom
Posted:
October 21, 2015

Contact this candidate

Resume:

IFRIM ION

Age: ** years old, January *th ****

Marital status: married

Address: No 2, Dealului street, Bl. F8, Ap. 4, sect. 6, Bucharest, Romania

Phone: 004**********

Mobil phone: 004**********

E - mail: acr5us@r.postjobfree.com, acr5us@r.postjobfree.com

Profile

Offering over 24 years of experience within maintenance, consultancy, commissioning engineering and program execution. Has the ability to build strong relationships with all stakeholders and to turn proposals into reality. Especially successful in management roles that demand rigor, a high level of drive and dedication and a focus on delivering business outcomes through the use of methodologies. Having a proven ability to drive out inefficiencies through process improvement as well as assist in the maintenance & development project. Possessing solid planning and organisational skills in coordination of project work at all aspects. Adapt to work under pressure in fast-paced, time sensitive environments.

Areas of expertise

Project Management & Planning, Safety and Security Maintenance, Organisational Skills, Strategic Planning, Logical & Analytical Approach, Decision Making Ability, Medium and Low voltage Electrical Installation Execution, Commissioning, Signals and Communication Skills, Renewable Energy Systems, Report Writing, Communication & Presentation Skills, Power generation experience, High level of training skills

Studies:

Master Degree in Engineering 1990

Polytechnic Institute of Iasi

Specialization: Transmission and Distribution of Electricity

Courses:

Site Manager Safety Training Scheme course

Certified trainer certified by Ministry of Education and Research from Romania

Languages:

English – Good

French – Good

PC Skills:

Windows, AutoCAD (2D 3D); Office (Word, Excel, PowerPoint)

WORK EXPERIENCE

June 2015 - present

Boiler Commissioning Engineer - Babcock & Wilcox Vølund

Energy from Waste Peterborough power plant

Involving in the pre-commissioning and commissioning of different systems of the boiler such as, line control, acid cleaning, steam blowing etc.

Responsible for the boiler supervising during the shift, in charge with control of the process parameters (emissions, temperatures, pressures, levels, flows) from control room, taking efficiency actions to adjust them for an optimum process operation.

Participating in performance test, trial run test, cold/warm start up, chemical cleaning, normal shut down.

Advised the control room client personnel on good operating practices and assist with trouble shooting process and mechanical problems.

Maintaining good communication/collaboration with the main contractors, subcontractors and vendors in order to ensure a proper operation of all systems

Reporting all abnormality discovered during field inspection routine

January 2015 – March 2015

Electrical trainer and Commissioning engineer - Shanahan Engineering, Ireland

For Hyundai Engineering and Construction

Electrical trainer Azito CCPP phase 3 Ivory Coast

Experience in operation and commissioning Combined Cycle Power Plant

Deep knowledge of the important equipment and processes mainly electrical equipment

Good training presentation skills and must have experience of developing and delivering technical training courses

Experience in test equipment, schematics and single line diagrams

July 2013- July 2014

Industrial Skill Trainer - SRACO Company, Kingdom of Saudi Arabia

For Saudi Aramco

Industrial skill trainer for Saudi Aramco, Kingdom of Saudi Arabia

Experience troubleshooting, testing and repair AC and DC machines

Experience in troubleshoot test and able to maintain HV transformers HV/LV switchgear, UPS (Uninterruptible power supply)

Experience in test equipment, schematics and single line diagrams.

Experience in troubleshooting and maintaining LV/HV power lines

Good training presentation skills

January 2013 – May 2013

Electrical Trainer - SC Formare Professionala Plus, Romania

For OMV PETROM

Electrical Trainer for OMV Petrom, Romania

Electrical Trainer for OMV PETROM – Low and medium voltage System Operation Electrician course

June 2012 – September 2012

Commissioning&start-up engineer - Smart Job Solution, Romania

For METKA Greece

Commissioning & start-up engineer OMV Combined Cycle Power Plant Brazi, Romania

Commissioning and start & up for 860 MW power plant (two gas turbines, 2 HRSG, one steam turbine) for BOP various systems, such as gas receiving station, demineralization water plant, waste water plant, cooling tower and pumps, cooling tower filtration system, feed water pumps, close cooling system, chemical dosing, fire system pumps and distribution, service water, potable water, drains system, exchangers and auxiliary boiler-start up activities and also the electrical and instrumentation equipment

PTW engineer

Preparing the handover documentation

Maintaining good communication/collaboration with the main contractors and subcontractors in order to ensure a proper operation of all systems

Ensure proper running conditions of all systems within the limit of the process and in safe conditions.

Execution of commissioned systems maintenance in order to ensure proper running conditions.

April 2011 – June 2012

Commissioning& Operation Engineer - ASSYSTEM Romania

For EDF France

Commissioning & Operation engineer BOP systems, EDF, Combined Cycle Power Plant Blenod Pont a Mousson, France

Commissioning and start-up for 430 MW power plant (one gas turbine one HRSG, one steam turbine for the various system belonging to BOP such as HVAC, pump stations, fire fighting pump station, fire fighting system according to EDF procedures and also electrical and instrumentation equipment of these systems.

Commissioning, start-up and operation of the auxiliary boiler within the required parameters

Maintaining good communication/collaboration with the main contractors and subcontractors in order to ensure a proper operation of all BOP systems

Ensure proper running conditions of all systems within the limit of the process and in safe conditions.

June 2010 – April 2011

Commissioning& Operation Engineer - ASSYSTEM Romania

For Alstom Power

Commissioning& Operation Engineer ALSTOM Power Plant - Maritza East 1, Bulgaria

Commissioning and operation engineer Steam Turbine and BOP Plant (shift in charge engineer) in Coal Fired Power Plant, 2 x 330 MW

Shift in charge engineer, operating the plant during the commissioning and test period.

Ensure proper running conditions of all systems within the limit of the process and in safe conditions.

Maintaining good communication/collaboration with Boiler and FGD operators, mechanical, electrical and instrumentation technicians.

Reporting all abnormality discovered during field inspection routine

Training the client’s operators.

Oct 2007 - June 2010

Site manager - SC SZD Electro, Romania

Supervision, coordination and planning of the medium and low voltage power lines rehabilitation and construction

Construction and commissioning of new MV/LV power substation and power lines

Modernization, repair of public lighting equipment and electricity supply installations on medium and low voltage works comprising installing 20 KV power substations, aerial and underground lines and the secondary circuits (protection, controls and data transmission).

June 2006- October 2007

Electrical engineer - MVV Consulting Romania branch

Consultant in European projects funded

Technical Assistance for Master Plan and Project Preparation in the Wastewater and Drinking Water Sector for five counties;

June 2004 – June 2006

Maintenance group chief - SC EMCO Engineering and Contracting SRL, Romania

Planning and coordinating activities of maintenance and repair electromechanical equipment in the utility plant including here boilers, HV/LV transformers, main and secondary distribution panels, UPS, HVAC installations.

Utilities such as steam, hot water, electricity: operation, supervision and production.

Preparation of technical and commercial proposals to potential clients.

April 2001 – June 2004

Construction and execution engineer - SC Luxten Lighting SA, Romania

Supervision and coordination of working teams for the rehabilitation of public lighting of Bucharest and coordinating repairs teams of public lighting network in Bucharest.

Establish number of manpower and material resources for each construction phase

Main works consist of replacing low voltage power lines and the rehabilitation of power and control panels in the power substation.

1999 – 2001

Head of the Electrical Maintenance Department - SC Danubiana SA, Romania

Planning, coordinating activities of repairs power installations in the utilities/power plant for the Danubiana tyre company.

Analysis of major damage and troubleshooting, protection coordination of the most important consumers from the main power substation.

The plant had 4 boilers and 3 small turbines with their auxiliary equipments and installations such as air fans, gas exhaust fan, main water pumps, water treatment station and heat exchangers. The steam produced by the boilers was used to generate power via turbines and as heating agent for the industrial process

The relay protection control and verification of the HV/LV transformers, generator and HV/LV power lines belongings to the power substations inside the factory.

Checking optimal operation of the secondary circuits (signalization, measurements, automation).

Primary equipments including here voltage and current transformers test and measurement according to the regulations in force

1990 – 1999

Scientific researcher - ICEMENERG, (Energy Research and Modernizing Institute), Romania

Studies on the energy consumption of industrial branches and on the technological chain, forecasting the evolution of primary energy resources, studies of energy conservation, the failure probability calculation of main components of a power plant mathematical modeling, comparative analysis of energy and economic indicators etc.

In terms of power generation, a major activity I carried out in the Bucuresti Sud power plant the largest power plant from Bucharest with an installed capacity of 550 MW run on gas and oil and consisted of failure analysis of major equipments, namely to boilers, turbines generators together with their auxiliaries.

Conversion of 420 t/h steam boilers which are the most typical steam boiler from Romanian cogeneration power plant from lignite firing into coal firing.



Contact this candidate