Alpha Mamoudou Diallo
Birmingham, AL 35224 or PO.BOX 13611, 35202
Phone: 205-***-****. Alt.Phone :205-***-****
E-mail: ************@*****.***
Summary of qualifications
Multi-faceted leader with high motivation, seek to pursue career in the field of electrical maintenance engineer, based on 20 years of experience in the field and 4 years in use of MARCAMING system in the management of time, personnel and electrical equipment. Additional work is based on the earned the BTS degree(Diploma as Superior Technician in Electro-Mechanic) in West Africa, in 2000, Industrial Maintenance degree in 2008, and Industrial Electronics degree in Mai 2013 from Lawson State Community College in Bessemer, AL.
OBJECTIVE
To begin my Industrial Maintenance career with a well-established company.
QUALIFICATIONS
Preventive Maintenance
AC Fundamentals
Industrial Blue Print Reading
Hydraulic and Pneumatic
Work Unsupervised
DC Fundamentals
Leader / Excellent Work Ethic
Proficient in Microsoft Office
Industrial Electronic
Industrial Robot system
Motor Control
Programming and Process Control
EDUCATION
Lawson State Community College Jun 2008-Present
Certificate of Industrial Maintenance Summer 08 GPA 4.0
Certificate of Industrial Electronic__Fall 13 Mai 2013-Present
WORK HISTORY
AmstedRail, Bessmer, AL Sep, 03-apl, 14, 2014
Maintenance multicraf
Control current and voltage
Inspect convoyors’rollers, limit switches, proxies, motors,
Indicators lights on the furnaces, water and air hoses,
The mold rollover, sand system, oil leak on the hydraulic group,
Splitters (north, south), hot wheel transfer, cold and hot overhead crane,
Check out furnaces temperatures twice a day
Execute the planning PMs every weekend
Fill out the job report and the work hours daily and send to the supervisor
Assist the pre-meeting and get the WO at the beginning of the shift.
Industrial chemicals, Ensley, AL Mai-August2014 2014
Electrical maintenance technician
Install a new water pump to wash the waste of the chemical
Product on the ground,
Run PVC pipe for the fume for each silo of chemical product
Install nine electrical fans on the roof for each of the tree storages rooms.
JCI (Johnson Control, Cottondale)
Associate team member/ maintenance Jan 2014-apr-2014
Troubleshoot PLC’s, replace parts, fixe some of them
Control current and voltage
Correct off set of ABB robot
Changing tools and set the right program
Correct offset of camera’s, sensors, limit switches
Office Max, Maccala May 2008- Present
Associate Team Member / section receiving /unloader/stocker May-Oct 2008
Maintain knowledge of inventory on the shelves.
Maintain records related to the number of unloaded truck per shift.
Demonstrate use or operation of merchandise.
Section shipping/ stoker/loader Nov 2008-Nov 2011
Setting up the number of stores.
Preparing the loaded shit by wave and truck.
Preparing the palletizing shit by wave and by shipping line.
Help moving, raping, and loading the ready pallets.
Associate of month Jan-13-2009
Certificate of Appreciation Aug-24-2009
Section Maintenance/ senior sorter operator Nov 2011-Presnt
Setting the shipping lines by waves
Preparing all the conveyors ready to run down the product
Inspecting combiner, sorter, conveyors(belt or roller)
Report the inspection daily to the Manager.
Troubleshoot or Replace Drivers, PLC’s in case of breakdown.
Maintain a close inspection on the air-compressor and the hydraulic batteries charger.
Help the maintenance team as needed for replacement futures, ceiling fans.
Wiring 460v motors for conveyor
Certificate of Appreciation Jul-27-2011
Certificate of Appreciation Aug-07-2012
Wal-Mart /Gardendale/AL March 2006-July 2007
Section groceries/stocker March-September 2006
.Maintain inventory of the shelves.
Place a special order or call the other stores for item the customers need.
Stock the product by number and by item at the shelves.
Get the rest of the product back to the storage unit by number and item.
Scan the rest of the product and have the difference with the initial inventory
Report to the Supervisor or the Manager at the end of the shift.
Zoning the product at the shelves in the morning before leaving.
Section chemical September 2006-July 2007
.Maintain inventory of the shelves.
Place a special order or call the other stores for the item the customers need.
Stock the product by number and by item
Get the rest of the product back to the storage unit by number and item.
Scan the rest of the product and have the difference with the initial inventory
Help the customers get what they needed when they needed
Trinity Contractor /electrician-helper July 2007-November 2007
Trussville, AL
Help running conducts (galvanized or PVC) for electrical cables.
Help running cables inside the conducts.
Help fixing the futures, fans, plugs, and interrupters.
Fixe track for shit-ward.
Wiring universal motors.
Colmon Electrical Industries Nov 2007-May 2008
Wiring automation Alabaster, AL
Wiring distribution power and control panels on chassis for underground mine.
Wiring and testing a control panel with Allen Bradley PLC for Birmingham News.
Helped the team replacing motors, cables for different moving paper rollers system for Birmingham News.
Helped the team replacing all the security devices for the System (limit switches, E-stops, proximity switches and the flashing lights) for Birmingham News.
Participate to the installation of two new big fans on the field for extraction fumes and dust for underground mine.
ADDITIONAL WORK EXPERIENCE
Alcoa Mining/Company of Bauxites of rep of Guinea (CBG) Jan 1985-Nov 2004
Automation/new installation/Wiring electrician Jan 1985-Jun 1993
Wiring and rehabilitating electrical circuit.
Wiring new electrical panels for new installation (sub-stations, 6KVA motors for conveyors belts, 380v hydraulic chargers, and well’s pumps).
Section Shipping/Maintenance/Electric/hydraulic Jun 1993-Jan 1999
Cleaning sub-stations, PCLs( local command post ), tightening and spraying connections on the breakers, breaker-switches and the connectors, relays, overload relays, contactors
Tightening the connections on AC motors (stator and rotor), checking the disconnect switches, motor starters, DC motors (static and rotating magnetic field), checking collectors.
Checking hydraulic charger motors, pump, limit and proximity switches, hydraulic level, hoses, leaking oil…
Electrician Methods Feb 1999-Jan 2000
Followed all aspects of MARCAMING system placement, including standard numbering of equipment, creation of programs of inspection tests, estimated planning and coordinating in the heart of CBG.
Wrote out electrical texts for up keep for electrical equipment in the plant, built a solid, effective reputation in leadership for revealing follow-up of MARCAM system.
Created inspection planning, work orders for daily, weekly, monthly and annual maintenance for entire plant.
Identified, established and coordinated maintenance electric/hydraulic as needed
Planned and followed up corrections.
Prepared reports, organized production meetings with master-workers and supervisors.
Forman electric/section shipping Feb 2000-Oct 2004
Prepared work orders for inspections and corrections by equipment.
Managed time by equipment and personnel.
Organized security and safety meeting daily with my crew.
Assisted engineers and supervisors meeting daily
Prepared requisitions for equipment or parts replacement
Prepared the annual revision.
Additional work is based on the earned of BTS (Diploma as Superior Technician in Electro-Mechanics), at ENAM (National School of Trades and Professions, I.e. Technical School, Conakry, Guinea, West Africa). 11-21-2000
Current Language Speaking:
FRENSH
ENGLESH