John M. Spurgeon
Whitesboro, TX. 76273
Home 903-***-****
Cell 903-***-****
SUMMARY:
** ***** *** ***** **********.
Experience in the Texas Barnett Shale, South East Texas, James Lime Horizontals, Cotton Valley, Haynesville Shale, and Drilling Deep wells, Eastern Okla. Weatherford shale Cleveland sands, Mississippi lime stone, West Texas, and Mississippi lime North West Okla.
Short Radius S Curve, Horizontal & Triple Lateral Wells in 1 well bore
Experience in air drilling operations. Drilling under balanced with brine, calcium chloride &KCL water. Gas & Oil Wells.
Experience & knowledge of drilling wildcat wells.
Experience in dealing with lost circulation.
Knowledge in water based & oil based mud systems, solids control equip. Bit selection & mud motor application.
Land experience from both driller & tool pusher perspective.
Geographical domestic experience: Texas, Okla., South east Kansas, & South west New Mexico
Computer literate in writing reports, drilling logs & well documentation. Software: Rim Base, Well E., Excel. Well View, and numerous others.
Experience in dealing with and handling contractors & subcontractors to work on locations, rig maintenance, various environments, supervision of rig building and personnel.
Well Control Certified. Exp. date 10/2015
H2S Certified
Valid Passport
EXPERIENCE:
5/13-11/14 Midstates Petroleum Drilling Consultant
Day well sight supervisor drilling in North West Okla. 10-
15,000’ lateral’s in the Mississippi Lime well’s taking
15 to 21 days from spud to rig release Well program is Rim base
6/12- 5/13 SM Energy Drilling Consultant
Well sight supervisor drilling in South East New Mexico,
West Texas deep lateral wells with up to 8000’ laterals
In sand, shale & lime stone Drilling with fresh & brine
Water as well as oil based mud. Drilling with Nabors
M rig using Rig Watch & Well View Programs
10/11- 5/12 Nadel & Gussman Drilling Consultant
Supervise all aspects drilling operation in the first lateral in
Kansas & in the Mississippi Lime drilling for oil & gas.
Drilled shallow horizontals well in North East Okla. also.
8/11-10/11 W & T Offshore Drilling Consultant E – Texas
One well contract, Supervise drilling operations of James Lime Horizontal, under balanced wells
6/10-8/11 S.M. Energy Day Drilling Consultant E - Texas
Supervise drilling operations & night consultant on all
Aspects of drilling Haynesville shale wells. All these wells
Have a kick off point of 12,500’ then drill curve &
Lateral out to 20,000’. The wells are drilled with water
Based mud to kick off then oil based mud to T.D.
9/08-6/10 Chaparral Energy Consultant – Okla. Supervised drilling operations on vertical wells in the Viola and Bromide shell formations. Drilled for oil & gas from 6000’ to 18,000’. Cost management analyst on each well. It was my job to keep drilling cost to bear minimum and bring in wells at or below projected cost.
5/08-8/08 Texas American Resources Consultant – East Texas Overseen drilling operations in the James Lime and Cotton Valley formations, wells were drilled in reclaimed coal beds depths 8000’ to 10,500’. Cost management analyst on each well. Wells were being drilled for Texas America. It was my job to keep drilling cost to bear minimum and bring in wells at or below projected cost.
2/07-3/08 Goodrich Petroleum Consultant – East TX.
Drilling locations in Cotton Valley formations were in recovered coal mining beds. Vertical wells to depths of 11,000’. James Lime Formation wells were under-balanced wells drilling with calcium chloride water to depths up to 18,000’ with horizontals out to 9000’. Casing used in these wells were Packers Plus Assembly. Burned flairs up to 150 feet, these wells all were natural gas. Wells created gas kicks up to 10,000 units as per Pason Systems.
7/06-1/07 Chesapeake Operating Consultant - Barnet Shale
Drilled many wells all in Barnet Shale Formations. North Central Texas all laterals & S curves up to 17,000’. Conventional rigs double and triple box, Top Drives 250 ton Tesco Top drives. Draco slingshots with 500 ton Varco Top drive. Closed loop systems.
5-06 -7/06 Bronco Drilling - Tool Pusher -Working with co. man drilling multi-lateral well package, ordering all materials for rig & cost management analyst, hiring of all hands drilling for oil & gas straight & horizontal wells from 8000-15000’. Started as company man.
2-06 – 5-06 Helmerich & Payne International Drilling - Driller / Tool Pusher – oversaw building of new rig & brought rig out of yard. Flex 4, Tesco Top Drive.
4-05 - 1-06 Felderhoff Drilling - Lead Tool Pusher- Working with co. man drilling multi- lateral wells ordering all materials for rig, cost management analyst, hiring of all hands, drilling S curve & horizontal wells for Devon Energy from 8000’ to 18,000’ . On some wells we used Air Drilling Systems.
11-02 - 4-05 Felderhoff Drilling - Driller / Tool pusher - Evening Tower Driller took care rig hands, kept rig clean & running at top performance drilled vertical wells from 8000- 17000’ Took pushing job at co. mans recommendation
1993 - 2002 Verizon Telephone - Construction Lineman / Foreman supervised the maintenance of trucks, equipment & run 3-4 men crews hung multi pair lines in the air
1987 - 1993 Exedra Drilling -Driller /Tool pusher took care of day to day operations running of rig, over seen hands, call in morning reports. Drilling for oil & gas from 8000-20000’. Took Drilling Supervisor job last two years over 4 rigs helped pushers keep rigs in top performance. Drilled in Northern Okla. for oil & gas, staked new locations & contracted subs to build location. Supervise all rig moves. No longer in business
1980 - 1987 Splicer’s Plus Owner (Self Employed) CATV Aerial & Underground Construction, Supervised 10 crews of 3 men per crew. Hang CATV cable & fiber optics in the air & placing under ground splicing all equipment in lines working with 8 sub contractors at a time to complete jobs on time
1979 - 1980 L.E. Jones Drilling - Daylight Driller & Tool pusher - Drilled from 8000’up to 25000’, some wells drilled for H2S & oil 10-500 parts per million. As pusher called D/S with morning reports hired & fired rig hands kept rig running at top performance at all times. No Longer in business
1977 – 1979 E.W. Moran Drilling– Evening tower Driller, drilled wells from 6000-25000’ drilling for oil & gas. Helped build rigs in yard. Company is no longer in business.
1975 – 1977 Harper Turner Drilling - Broke out in oilfield started in worms corner & was drilling morning tower within 1 year.
1972 – 1975 USMC, Vietnam Vet. E 5 when my enlistment was up.
Education:
2 years Cooke County College – Drafting
Wild Well Control Certification
OSHA Safety Cert.
Chemical License
CPR & First Aid, Heat Stress
Stuck Pipe
Preventative Maintenance
True Training
Confined Space
Riggers Training
Hazardous Communications (HAZCOM)
Electrical Safety (LO/TO Procedures)
Personal hoisting Procedure & Fall Protection
Spill Prevention & Control (SPCC Plan)
Team Building
Iron Roughneck Training in Hawk Jaw & ST80 & Scorpion VT2000
Top Drive Training on Varco, Tesco & Can Rig
H2S school & Certification
K & M School
Leader ship training
REFERENCES AVAILABLE UPON REQUEST.