Post Job Free

Resume

Sign in

Engineer Project

Location:
Tulsa, OK
Posted:
July 11, 2015

Contact this candidate

Resume:

Production Engineer * Reservoir Engineer

Five years of combined professional and education experience in the E&P industry including disciplines in reservoir, production, completions, and drilling.

Skills

PHDwin, Aries, SNAP, TWM, VBA, TANK, RodStar, QRod, AutoCAD, Solidworks

Education

University of Tulsa. Tulsa Aug 2008 to Dec 2012

Bachelor of Science in Petroleum Engineering GPA: 3.3

Petroleum Engineering Experience

Hurricane Creek Gas Venture, LLC. Tulsa, OK Jan 2015 to Present

Consulting Petroleum Engineer-Glass Paxton Lease Project, Nowata County OK

Recommended waterflood operation in 3 SI wells for 20% production increase.

Completed reservoir calculations to determine PDNP opportunities in Bartlesville Formation

Facility Design utilizing AutoCAD for SPEC permits

Consulting Petroleum Engineer – North Perkins Project, Payne County OK

Generated engineering database for A&D prospect

Completed reservoir calculations to determine PDNP opportunities in Redfork Formation

Used Hall Plot Method & IHS data to forecast waterflood opportunity.

Foundation Energy Management, LLC. Tulsa, OK Mar 2014 to Jan 2015

Production Engineer/Foreman-OK/KS

Supervised 12 pumpers & 180 wells in the Arkoma Basin, Mississippi Lime, and Anadarko Basin

Decreased chemical, electrical, and SWD hauling LOE by 20-50%

Wrote VBA program to alert operational personnel of LOE above 7.5%

Troubleshoot down wells with Echometer software for fluid shots and dynamometer test.

Root cause analysis: Tracked downtime and cause

Facility Design utilizing AutoCAD

Foundation Energy Management, LLC. Tulsa, OK Jan 2013 to Mar 2014

Operations Engineer-OK/KS & TX/LA

Managed 300 wells which contained rod pump, ESP, plunger lifted, and well head compression

Maintained production forecast, field economics, and PDNP/PDP/PUD cases with new pricings.

Generated risked economics with annual operations and drilling plan with cash flows and ROR

Created AFEs to present to upper management and CEO – PDNP, P&A, Artificial Lift, PUD.

Coordinated with Reservoir Engineers and Geologists in PDNP and PUD projects

Assisted Reservoir Engineer with SEC End-of-Year reporting for PDP, PDNP, and PUD cases

Waterflood management using Hall Plot Method and Buckley-Leverett Analysis

Increased production in Stonewall, TX by 20% by converting low producers to WIW

Completed reservoir calculation including volumetric recovery, pressure transient analysis, material balance, decline curve forecast, and ROR for PDNP and PUD cases.

Designed, analyzed and made recommendations to optimize artificial lift systems

Analyze well failures and made recommendations for optimization

Hurricane Creek Gas Venture, LLC. Tulsa, OK Jan 2012 to Dec 2012

Production Engineer Intern-Cooley Lease Project

Used log analysis, EUR evaluation, decline curve analysis, economic forecast, and isopach maps.

Created workover procedure to drill out CIBP to open Arbuckle formation. 10bopd/50bwpd



Contact this candidate