Post Job Free
Sign in

Project Manager Mechanical

Location:
Neenah, WI
Posted:
July 02, 2015

Contact this candidate

Resume:

Russell F. Hass

Kane, PA *****

Email: ********@*****.***

Home Ph. 814-***-****

Cell 814-***-****

Career Objective

A position as a Piping Mechanical Designer where my design skills, and commitment to safety and accuracy will contribute to the profitable operation of your organization.

Experience

FUSION ENGINEERING

Green Bay, WI

Piping Mechanical Designer/Drafter – Sept 2013 – Present

Piping mechanical designer.

Developed plan and created iso's to flush the lube oil systems on U.S.N. Littoral Combat Ship.

Worked on rationalization of parts catalog for the littoral combat ship.

UGS

Ashland, KY 41101

Piping Mechanical Designer/Drafter – Feb 2013 – April 2013

Piping mechanical designer

Modified existing product screw conveyors operating at 950F to allow free movement from thermal expansion, this included designing dust proof boots between conveyors capable of absorbing movement in two directions.

BE&K/KBR

Fayetteville, NC 28304

Piping Mechanical Designer/Drafter – June 2012 – Feb 2013

Working at Du Pont Fayetteville site on PSM and other P&ID updates, piping design and drawing conversions.

BE&K/KBR

Raleigh, NC 27713

Piping Mechanical Designer/Drafter –August 2011 – June 2012

Created piping design drawings (plans, sections and isometrics) for pulp mill upgrade.

Gathering as built data from field visits.

Modified existing stock tanks with internal plow and installation of agitator.

Modified chemi-washer stock & vacuum piping.

Designed installation of stock screens and fiberlizers, and changes to existing piping.

Designed and installed new shower piping manifolds, shower supports, and modifications to brown stock washer end shields allowing installation new shower booms.

Reworked existing refiner piping for new stock supply.

Designed new refiner installation to permit removal motors (34,000 lbs) cooling fans and ductwork.

WEYERHAEUSER EAST COAST ENGINEERING OFFICE

Charlotte, NC 28273

Piping Mechanical Designer/Drafter – April – June 2011

Created isometric drawings and material lists from orthographic drawings.

Updated model with data from existing plant drawings.

DOMTAR JOHNSONBURG MILL

Johnsonburg, Pa 15845

Piping Designer – February 1996 – July 2009

Discovered root cause of recovery boiler economizer leaks saving company approximately $800,000.00 annually in repair costs.

Reverse engineered and had a replacement CO2 vaporizer fabricated for a savings of $200,000 over OEM replacement.

Created P&ID's, designed piping, specified equipment and piping for numerous mill projects.

Acted as night shift supervisor for outside contractors during annual, power boiler and turbine major and minor outages.

Acted as project manager on construction projects using outside contractors or mill maintenance personnel.

Installed additional aeration basin blower, and emergency air compressor for waste treatment plant with 2 short shuts.

Designed and supervised installation of translating platforms for recovery boiler lift bay to allow 6000# scaffold pallets to be off loaded onto pallet jacks without twisting crane cables.

Developed record drawing sets to track inspection and repairs for 2 million lb per day 1250 psi recovery boiler, (2) 250,000 pph 1250 psi pulverized coal boilers, (2) low pressure package boilers, and various process vessels and storage tanks.

Designed and installed bleach injection systems to allow of elimination of elemental chlorine from the mill site.

Designed platforms and stairs for access to process equipment.

Designed and supervised installation of new sludge presses and sludge pumps at waste treatment plant with minimal outages (3 separate 4-8 hour outages).

Designed modifications to sludge pump piping to allow sludge level to be controlled in individual basins.

Maintained mill MTR record files.

Maintained electronic drawing files using Documentum and ImageSite software.

Created material takeoffs and ordered material using Impac and SAP Portal software.

MARATHON ENGINEERING ARCHITECTS AND PLANNERS

Appleton, Wi 54911

Piping Designer – November 1982 – February 1996

Lead piping designer, responsible for taking field measurements, creating drawings manually and using Microstation.

Directed other team members work to meet project deadlines.

Designed paper machine dryer drainage systems for Westvaco Tyrone, Neenah Paper, and Nicolet Papers De Pere.

Design of secondary headbox, BelBond relocation and secondary headbox stock prep system for Westvaco Covington.

Design of four separate stock preparation systems for American Can Kalamazoo.

Assisted in the design of CIP system for Galloway Co.

Designed new fuel oil storage tanks for Galloway Co.

Design winder installations for No. 7 paper machine Pentair Port Huron mill and No. 3 machine Wausau Papers.

Design of BMA plant for EKA Nobel/Du Pont joint venture in Augusta Ga.

Designed and installed savealls for no. 5 & 6 paper machines at Pentair Port Huron mill.

Ralph M. Parsons Co.

Pasadena, CA 91124

Model builder and Drafter - June 1980 – September 1982

Piping designer, model builder, and draftsman.

Designed piping for north slope seawater injection and pig launcher module.

Designed mil spec tubing and piping for USAF/NASA Vandenberg orbiter maintenance and check out facility.

Designed steam jacketed piping for handling liquid sulfur from Bevon sulfur removal units.

Military Service

United States Marine Corps

June 1974 - June 1978

Corporal – Squad Leader

Honorable Discharge

Education

Northeast Wisconsin Technical College - 1980

Green Bay, WI

Associate of Science degree in Architectural and Industrial Model Building

Skill Set

Intergraph Microstation 10 years experience

Auto Cad 98/2008 14 years experience

SAP (Portal)

Line Sizing

Spec Pumps and Valves

Head Loss Calculations.

MS Word

Manual Pipe Stress Analysis

ImageSite

Documentum



Contact this candidate