AFSHIN HASHEMI
M +** * **** **** E acqgcz@r.postjobfree.com
**/** ****** ******, *******, VIC 3132 Australia
PROFILE
Senior QC and welding inspector with 12 years experience of inspection in oil, gas and petrochemical
equipment. I have good practical and theoretical knowledge in evaluating procedures, studying the
requirements and executing the jobs and quite capable of working without supervision.
EMPLOYMENT SUMMARY
SEP 2014 - Present Aker Solution - Subsea (UK) Senior Welding, NDT and QA/QC Advisor
May 2013 - Nov 2013 Mc Connell Dowell (Australia) QC and Welding Supervisor
Aug 2009 - Jan 2013 BKS Senior QC, Welding and NDT Supervisor
July 2008 - May 2009 Fan Niroo Co. QA Manager, QC/ Welding Supervisor
Jan 2008 - July 2008 Tehran Refinery QC Engineer, Welding Supervisor
Jan 2006 - Jan 2008 K.M.I QA/QC Engineer
Feb 2005 - Jan 2006 K.M.I Quality Control and Welding Inspector
Aug 2003 - Feb 2005 PIDEMCO Co. QC Inspector, Welding Inspector, NDT Man
KEY STRENGTHS
QC/QA
Well experienced in using mechanical inspection equipment such as optical profile projector, master
measuring equipment, calipers, micrometers, depth gauges, welding gauge, RPM measuring, humidity
meter, hardness measuring, Flow meter, DFT meter, Hands on preparation of QC/QA documents,
Procedure, Qualified Internal Auditor ISO 9001, Proficient in engineering drawing interpretation
Welding
Senior Welding inspector - CSWIP 3.2.1 Level 3
Welding Inspector - CSWIP 3.1 Level 2
Certified Welding Inspector AWS QC1 - CWI
Hands on preparation of WPS, PQR, WPQT
Excellent knowledge and a comprehensive understanding of all aspects of construction welding, welding
processes (SMAW, GMAW, GTAW, SAW, FCAW, and Orbital)
NDT
Certified in UT Level I &II
Certified in RT Level II
Expert in VT and PT, Familiar with MPT
Interpreting skills for International Codes, Standards and Procedures Such as:
ASME Sec II, V, VIII, IX, B31.3
TEMA
API 1104, 510, 577, 650, 625, 598 and 6D
AWS D1.1, ASTM, ANSI Flange, TPS, Key to steel
ISO 9001, BS EN 5817, pn16, 287, 22553, 15614, 1011, 970
NASE, ASTM D3276
AS/ NZS 1554.1, 1554.6, 1554.7, 3992, 4041, 2885.2
Industrial Coating and painting's Inspection
Surface preparation, process, control and inspection
Fixed equipment's Inspection and construction process
Pressure Vessel, Cooling Towers, Heat Exchanger, Desalination and Storage Tank
Rotary equipment's Inspection
Compress natural gas (CNG) package assembly and performance test
Pump and axial compressor performance test
Piping
Inspection of Welding, Pneumatic and hydro static test
Familiar with Material
AFSHIN HASHEMI PAGE 1 OF 4
Carbon steel, Stainless steel (Duplex, Supper duplex, Nitronic50/60, Inconel, Monel) and Titanium
IT
Microsoft Office Package, Ms Project, Visio and Auto cad
EDUCATION
B.Sc. in Industrial Engineering Karaj, Iran 2000 - 2004
TRAINING & PROFESSIONAL DEVELOPMENT
CSWIP 3.2.1 Level3 TWI, Cambridge, Nov 2014
CSWIP 3.1 Level2 TWI, Cambridge, Feb 2013
Radiographic Test Level II SNT-TC-1A - Refresh PFP, Tehran, March 2012
Ultrasonic Testing Level I, II_ SNT-TC-1A - Refresh PFP, Tehran, March 2012
Member of American Society for Nondestructive Test ASNT, USA, March 2007- March 2008
WPS & PQR Acquaintance and Providing B.K.S Co, Tehran, Feb 2007
CWI - Certified Welding Inspector B.K.S Co, Tehran, Jan 2007
Internal Audit (ISO 9001) DNV, Tehran, Oct 2006
Centrifugal Rotor Performance Test Dresser Rand, Tehran, Nov 2005
CNG Package Assembly & Performance Test Nuovo Pignone, Italy, Jul 2005
Industrial Painting Supervisor Oil Company, Tehran, Feb 2005
Construction Induction Workplace health and safety Queensland, July 2013
EMPLOYMENT HISTORY & ACHIEVEMENTS
Senior Welding, NDT and QA/QC Advisor - Aker Solution (Sub-Sea Components)(UK)
SEP 2014 – Present
Key responsibilities
Welded process monitoring
Welding Visual test according with ASME B31.3, AWS D1.1, ISO 5817
Reviewed and approved Welding procedures specifications
Ensure that relevant welding procedures are available for specific procedures
Provided welding engineering support for production
Interpreted Radiographs, applied testing criteria in accordance with applicable specifications or standards
and evaluated results
NCR management including determination of corrective and protective action
Reporting the NCR status to Senior QA Engineer
Supported Senior QA Engineer in resolution of problems related to welding and NDT
Performed a full trend analysis to identify the failure modes
Created a Pareto chart to present the findings
Presented the trends of failure modes to senior management
Sign off Stab plates after completion of assembly and testing (FAT)
QC and Welding Supervisor - Mc Connell Dowell (Australia)
May 2013 – Nov 2013
Key responsibilities
Welded process inspection including set up, preheat, welding parameters, controlling heat input and
cooling rate
Visual test according with AS/NSZ 2885.2, API 1104
Witnessed Welding procedure specification(WPS) and procedure qualification report(PQR)
Monitored and verified Welder qualification test(WPQT)
Performed a full trend analysis to identify the welding defects including determination of corrective and
protective action
Coordinate with client and authorized inspector on all requested inspection
Liaise with client 3rd party with regards to project specifics documentation and assist in the resolution of
any quality issues
AFSHIN HASHEMI PAGE 2 OF 4
MDR's review
Senior QC, Welding and NDT Supervisor - BKS (Consulting Engineering & Inspection Co.)
Aug 2009 – Jan 2013
Key responsibilities
Welded and Coated process inspection (Before, during and after)
Hands on experience in preparation, review and monitor of WPS, Qualification of PQR, welder qualification
and Welding map
Final Visual Test according with ASME B31.3, AWS D1.1, ISO 5817
Monitored Welder qualification test
Provided welding consultancy service
Witnessed post weld heat treatment
Performed a full trend analysis to identify the Welding defects including determination of corrective and
protective action
Ensure that the inspection requirements of any quality/inspection plan can be met, within the allocated
time, budget and using the most suitable, personnel for the activity
Inspected of fixed equipments such as Pressure vessel, Heat exchanger, Desalination and thermo
compressor, Storage Modules
Interpreted Radiographs, applied testing criteria in accordance with applicable specifications or standards
and evaluated results
QA Manager, QC/ Welding Supervisor - Fan Niroo Co. (EPC in Thermal desalination, water solution, oil and gas equipment)
July 2008 – May 2009
Key responsibilities
Implementation of ISO 9001:2000 (team work)
Management & improvement of key factory performance indicators
Management & improvement of the manufacturing performance process
Ensuring appropriate use of factory information systems and providing relevant user training
Ensure that work is carried out fully in accordance with the project quality standards specified in the
contract
Supervising the equipment and production methods and improving overall quality
Circulating and maintaining all forms and records pertinent to the Quality Plan
Issuing, updating, distributing and following up of NCR forms
Supplier and sub-contractor audits
Base material check (including visual, dimensional, chemical, mechanical and performance test reviews)
Sign off work packs after completion of squad review
Audited Welding Suppliers and sub-contractors
Supervised 20 welder (SMAW, GMAW, GTAW and SAW)
Teaching welding technology theory in the engineering department
Inspected of fixed equipments such as Pressure vessel, Heat exchanger, Desalination and thermo
compressor
Inspected and monitoring of rotary machine performance test such as Water Pump
Final Visual Test according with ASME B31.3, AWS D1.1, ISO 5817
Quality Control Engineer / Welding Supervisor - Tehran Refinery (National Iranian oil refining company)
Jan 2008 – July 2008
Key responsibilities
Providing engineering documents such as WPS, PQR, Welding map, QC Plan and Visual Test procedures for
storage tanks
Experience of preparing, running and witnessing PQR, Welder Qualification tests
Monitored Storage tanks welding sequence, Hydro static and Vacuum test
Supervised 13 welder
Coordination of NDT activities (RT, UT, PT and Vacuum Test)
Base material check (visual, review chemical, mechanical and performance test certifications)
AFSHIN HASHEMI PAGE 3 OF 4
NCR issue, updating, distribution and follow up
Inspected Storage tank according to API 650
Interpretation of Radiographs
QA/QC Engineer, Representative of the Management in QMS - K.M.I
Jan 2006 – Jan 2008
Key responsibilities
Management & Improvement of the factory key performance indicators
Management & improvement of the manufacturing performance
Ensuring appropriate use of factory information systems and providing relevant user training
Internal Audit of ISO (9001) quality management systems
Holding management review meetings
Provided production lines standards
Reduced and controlled factory complexity
Managed pressure vessel project, using the company resources and managing the day to day operation
Key achievements
Passed external audit without getting any major or minor
Successfully managed time schedule
Increased production reliability and efficiency through effective implementation of ISO
Quality Control, Welding Inspector - K.M.I (E&P or Turnkey plants contractor)
Feb 2005 – Jan 2006
Key responsibilities
Inspected of fixed equipments such as Pressure vessel, Heat exchanger, Tower, Storage module
Provided QC forms and final inspection book include (MRI, Dimensional check, NDT, Tube expanding,
Hydrostatic and pneumatic test, PWHT, Hardness and painting measurement, PQR and WPS)
Experience of preparing, running and witnessing WPS, PQR, Welder Qualification tests
Witness pressure testing and ensuring that recordable calibrated pressure gauges are used
Welded process inspection
Visual and Penetration test according with relevant cods
Material inspection and review of test certificates (Visual, Chemical, Mechanical and Performance)
Coordinate with client and authorized inspector on all requested inspection
Plan, schedule and dispatch Non-Destructive Testing in accordance with project requirements
Quality Control, Welding Inspector - PIDEMCO. (EPC in Oil, Gas and Petrochemical industries)
Aug 2003 – Feb 2005
Key responsibilities
Inspected of fixed equipments such as Pressure vessel, Heat exchanger, Tower, Storage module
Inspected and monitoring of rotary machine performance test such as CNG compressor, centrifugal pump,
centrifugal rotor and shaft balancing
Provided QC forms and final inspection book including MRI, analyses request, dimensional check, NDT, tube
expansion, pneumatic and hydrostatic test, PWHT, hardness and painting measurement
Welded and Coated process inspection (Before, during and after)
Visual and Penetration test in accordance with relevant codes
Material inspection and review of test certificates (Visual, Chemical, Mechanical and Performance test)
Coordination of NDT and PWHT activities
Ensure that NCR’s are prepared and closed out in a timely manner
Ensure that pickling, sand blasting and painting carried out in accordance with the procedures
REFEREES
References available upon request
EDITION: April 2015
AFSHIN HASHEMI PAGE 4 OF 4