MUZAFFER CANOLCA
Sakarya Mah. **** Sok. No: **/* Merkez Manisa / TÜRKİYE
Mobile Phone Number : +90-532-***-**-**
E-Mail: *.*******@*****.***
Birth Date: 01.12.1985
Military Status : Completed
Educational Background
University : IstanbulTechnical University / Mechanical Engineering Faculty ( Istanbul / Turkey )
Graduation Total Avarage: 2.89 / 4.00
University : Anadolu University / Management Faculty (Eskisehir / Turkey )
Managment (2005-2010)
Graduation Total Avarage : 65/ 100
High School : Manisa Fatih Anatolian High School ( Manisa / Turkey )
Quantitative Section (1999-2003)
Graduation Total Avarage : 4,96
Experiances
SINTEK Mining and Machinery Industry Construction Ltd.
Full Time (Department: Project Management and Design) October 2014 – Up to now
Position Descriptions
Project Manager of The Modification of Existing Ball Mill System with Roller Press in Votorantim Hasanoğlan Cement Plant- EPC Contract
(Total Value of The Project = 3.028.000 Euro)
Assisting the process design manager to finalize the arrangement and sectional drawings of project
Managing to design the detailed projects of equipment
Preparing essential documents throughout getting construction license
Preparing the work schedule and submitting to employer
Managing to procure the regarding equipment that exist on the drawings based on the technical specifications and their capacities.
Organizing the transportation from all over the world based on the work schedule
Contract management
Preparing the cash flow table based on the manufacturing schedule and estimated working progress
Preparing monthly progress reports and payments
Managing the erection period at cement plant
Commissioning Roller Press, Belt Scale, Chain Bucket Elevators, Belt Conveyors…
Carrying out modification of Ball Mill 2nd Compartment with new liners and outlet diaphragm
Implementation of insulation and coating
Managing the commissioning period of the equipment to be carried out at site
Informing and educating to employer authorized workers in order to maintain the equipment based on the technical specifications on time.
SINTEK Mining and Machinery Industry Construction Ltd.
Full Time (Department: Project Management and Commissioning Engineer) January 2014 – October 2014
Position Descriptions
Project Management and Commissioning Engineer
Manufacturing of Bag Filter Cages and Inspecting them with FLSmidth ’s Representatives in workshop
Managing the maintenance period of existing equipment of Gumushane Askale Cement Plant
Increasing the capacity of belt bucket elevator in Gumushane Askale Cement Plant
Preparing the feasibility report to be occurred a project in Ivory Coast with LIMAK Cement Group
Assisting the process design manager during the period to be prepared quotation for the new projects
Preparing the new quotations for the new projects
Controlling the quotations and contracts of subcontractors
Determining the indirect costs for the new projects
Preparing monthly progress and payment documents for LIMAK CEMENT Group in Ankara
Managing the commissioning period of Cooling Tower supplied by FLSmidth and Vertical Raw Mill that are supplied by Pfeiffer
EKON Industry Construction and Trade Inc. Djebel Ressas Cement Factory (Mornag / Tunisia)
Full Time (Department: Electro- Mechanic) November 2012 – September2013
Descriptions of Job
Assembly Engineer
Managing the assembly activities in related sites such as Raw Meal Silo, Pre-Heater, Cement Silo equipment that were supplied by FLSmidth
Contract management
Controlling the warehouse inventory and requesting required materials based on projects
Leading the mechanical erection team in order to mount Air Slides, Bag Filters, Silo Feeding and Discharge Systems, Belt Conveyors, Bucket Elevators, Clinker Cooler System, Teritary Air Duct…etc that were supplied by Turkish Manufacturer
Ensuring following up quality procedures based on mechanical erection rules
Finding solutions for problems have been occurred at site during erection period
Reporting the erection progress to the technical office in order to prepare exact monthly progress payment
Handing over the machines to the electrical teams
As soon as electrical job have completed, performing cold-run and hot tests onto the assembled machines
According to test results, making revisions in order to increase machines’ efficiencies
Handing over the assembled machines to the client
Renaissance Construction Cement Factories (Volgograd – Novorossiysk / Russia)
Full Time (Department: Electro- Mechanic) April 2010 – September 2012
Position Descriptions
Material Planning and Quality Control Engineer / Logistic Engineer.
The work performed in Verhnebakansky Cement Plant has been performed with FLSmidth was divided into two steps as shown below,
First Step (in the workshops)
Classifying all materials based on whether or not could be manufactured in Russia
Contract management
Visiting to sub-contractors’ workshops and deciding to regarding items to be manufactured by considering capacity and capability
Preparing the agreements with sub-contractors.
Managing the start-up activities in the workshops
Preparing the manufacturing progress plan based on sub-contractors’ reports
Being in the workshops during end of the manufacturing period in order to reply sub-contractors’ questions about clarifying the tolerances or determining the alternative materials and manufacturing methods
Approving the all measured items by drawing on FLS quality documentations with materials supervisor
Packing all approved items and preparing the packing list
Preparing the related documentations in accordance with Turkish Customs Laws to send goods from port
Preparing the related documentations in accordance with Russian Customs Laws to clear goods
Second Step (at site)
Planning the warehouse organizations and finding the related manpower by considering project cost
Managing the mechanical and consumable materials warehouses
Preparing the warehouse inventory and reporting it to procurement manager
Preparing the material request orders based on warehouse inventory by determining missing and rejected items’ lists
Assisting the procurement department about selection of suppliers
Responding the regarding questions to be queried about ordering items
Managing the pre-assembly department towards end of the project
Enka Teknik (Zawia - Libya)
Full Time (Department: Procurement) April 2009 – February 2010
Position Descriptions
Material Planning and Quality Control Engineer in Zawia Desalination Plant Project;
Managing the mechanical and electrical warehouses
Preparing the warehouse inventory and reporting it to the project coordinator
Preparing the material request orders based on warehouse inventory by comparing the remaining projects
Assisting the procurement department about the selection of supplier by considering the end dates of projects
Determining missing items by comparing with packing list
Controlling the quality of supplied mechanical items based on SIDEM quality documentations
Creating a maintenance period list for mounted equipment
Supplying oil and grease for regarding items
Bosch and Siemens Home Appliances Group (Çerkezköy– Tekirdağ / TURKEY)
Part Time (Department: Research and Development) September 2008 – January 2009
Position Descriptions
Preparing Final Design Project and Working on Part - Time Jobs;
Projects: Analyzing the front tub of washing machine with ANSYS Workbench and improving its side walls’ strength against bending
Bosch and Siemens Home Appliances Group (Çerkezköy – Tekirdağ / TURKEY)
Summer Internship (Department: Research and Development) July – September 2008
Position Descriptions
Supporting to some research and development projects of the FIW department;
Projects: Chip Fixation, Optimization of insulation felt
Understanding the quality test procedures and learning some measuring equipments used in the test laboratory, the components of washing machine, the erection steps of washing machine, painting activities, and packaging system
DMG / Mori Seiki (Bergamo – ITALY)
Internship Position (Issues: Assembly) September- October 2007
Position Descriptions
Supporting to all assembly processes of the firm;
Pre-assembly and maintenance of the main steel frames, lubrication systems, cooling systems, controlling systems, and quality control procedures.
Courses and Seminars
Professional Management Plan ( PMP )
Firm: ERK Information Systems, Duration: 40 Hours, Date: June, 2015
International Trades and Practices
Firm: Educon, Duration: 16 Hours, Date: February, 2015 Certificate No: 335********
MS Project
Firm: BEC, Duration: 24 Hours, Date: January, 2015 Certificate No: 201580324
Site and Project Manager Signing Authority
Firm: MEO, Duration: 24 Hours, Date: December, 2014 Certificate No: 6992-68336
ISO 14731 Welding Supervisor
Firm: TUV SUD, Duration: 16 Hours, Date: October 2014 Certificate No: 14B-01221-003
Project Management
Firm: Procter and Gamble, Duration: 8 Hours, Date: November 2008
Sales Engineer
Firm: Elginkan Foundation, Duration: 7 Hours, Date: February 2008
ANSYS
Firm: FIGES Duration: 32 Hours, Date: January 2008
Brand Management
Firm: Bosporus University, Duration: 8 Hours, Date: May 2007
NLP Training
Firm: Elginkan Foundation, Duration: 7 Hours, Date: January 2007
Time Management
Firm: Elginkan Foundation, Duration: 7 Hours, Date: January 2007
Solid Works
Firm: Istanbul Technical University, Duration: 48 Hours, Date: February-June2006
Achievements
Graduation at Istanbul Technical University in 7 semesters
Honor list in Istanbul Technical University
Coming Second in Solar Splash 2008 in the World
Publishing to my interview in The HURRİYET HR newspaper
Skills
Computer Programs Knowledge:
Windows
Word
Excel
Power Point
Solid Works
Auto CAD
Ansys-Workbench
Language Knowledge:
English: Fluently speaking and writing
Russian: Fluently speaking and understandable writing
Memberships:
Solar Splash 2008 – Mechanical Design (http://www.solarsplash.com)
Mechanical Engineering Organization (Vice President )
ITU Investment Club
ITU EPGIK
References