CURRICULUM VITAE

Name PREZIOSA FRANCESCO

Date of Birth 20 February 1942

Education Diploma in Mechanical Engineering

Qualification Mechanical Engineer

Language English: Fluent, Spoken, and written

Phone 093*-****** – 348/6604719 (mobile)

Training Courses

and

Special Tasks:

6 months Scholarship at Ravenna ANIC Training Centre for Petrochemical Address

Toxic gases Operating License

Construction Total Quality course (ABB Baden-CH)

BOSIET Course.

H2S trained in Qatar - Libya – Kazakhstan.

Manpower Recruitment in: Philippines-Thailand-India-Pakistan Romania.

Safety - Codes - Standards - and Regulation Oriented

Method Statement assessment and preparation.

Troubleshooting engineering

Service history

2012 ERGONOS CONSULTING CO: SENIOR ENGINEERING

CONSULTANT

Sept-Nov 2010 SAIPEM ENERGY-VENEZUELA-COROCORO PROJECT:

COMMISSIONING LEADER

Jan 2010 EUROTECNICA:

QUATAR-Petrochemical plant-Maintenance Advisor

Dismantling Equipments procedures

Jul 08 to Aug 09 AGIP KCO: Kashagan Project –Installation – Hook-up & Precommissioning & Senior HVAC & Mechanical Engineer

D-Island (Kazakhstan).

May 06 to Jul 08 Bonatti –Dietsmann GMS Contract – ENI Gas Mellitah Complex: As Interface Contract Manager. Managing Local and International Sub- Contractor, Assistant of Project Manager,

Team Leader acting.

Jan 05 to May 06 Tecnimont – Eni GAS WLGP Wafa Coastal Plant – Libya

As: Production / Maintenance Interface Coordinator at Wafa Coastal Plant. The plants has been listed previously- He was coordinating the daily maintenance activities as an intermediation between Production Department and Maintenance Department. Participating in preparation, execution,and completion of critical task to ensure safe working practices shut down plans preparation. In liaison with JTS and ENI Gas for rectification jobs after RFPT and during Defects Liability Period. Permit to work issuer- H2S trained.

2004 to 2005 Tecnimont –Agip Lybia Project Wafa Coastal Plant

Senior Shift Supervisor within Commissioning Team. Coordinating with Process and Commissoning Supervisors, Logistic area,Mellitah Gas Compression Station

Wafa Desert C.R-Incident Coordinator

2003 to May 2004: Technip Italy - Power Generation Coordinator for Agip Gas BV Wafa Desert Plant PMS

The Project is consisting of:

- 3 GTG Nuovo Pignone Frame 5

- 3 WHRU – Hot Oil System

- Coordination for civil works, electrical works, painting works. I.C.

Works, piping work for the area.

2002 to 2003: Enelpower – Power Plant Construction Manager, HSE Manager for Ras Laffan-Power Plant.Qatar

Power Plant (Qatar)

The Project is consisting of

- 4 General Electric Gas Turbine Frame-9 Output 100x4 MW

- 4 HRSG (Doosan)

- 2 Steam Turbine (Franco Tosi) Output 250 MW each

- Water Treatment Plant

- Potable Water Tank

- Cooling Water System (Cooling Tower)

- HVAC System

- Painting

- Insulation

- Fire Fighting System

- Electrical / I & C System

2001 to 2002 Mar : Technip-Italy-Piping Superintendent for Qatargas SRX Project,

Ras Laffan, Qatar

1999 to 2001 : API Refinery - Field Engineer-Translator between TEXACO licensor and API refinery personnel, for IGCC Plant (Integrated Gasification Combined Cycle).Falconara, Italy

The project is consisting of :

N 1 Gas Turbine Type 13E2 (ABB POWER GENERATION)

N 1 HRSG (Heat Recovery Steam Generator)

No.1 Steam Turbine

N 2Gasification Unit (TEXACO LICENSOR)

No.1 Air Separation Unit

N 1 Pump House and related water intake.

Utilities System.

1998 to 1999 ABB SADELMI- Resident Construction Manager with ABB Sadelmi for “Ruwais Refinery Expansion Project” General utilities Plant Expansion

The Project is consisting of:

N 3 WHRB (Combustion Engineering)

N 4 Gas Turbine Type 13E2 (ABB POWER GENERATION)

N 2 MSF Unit (Fisia Impianti)

N 1 Water Treatment Plant

N 2 Distilled Water Tanks

N 2 Demineralization Water Tanks

N 1 Sea Water Pump house and related water intake

-Electrical I & C System for the Power Plant

-HVAC System – F.F. System

- Painting – Insulation.

1998 to 1998 ABB SADELMI-Bahrain combined cycle project-as Project Co-ordinator at Black & Veatch Headquarter in Kansas City, U.S.A.

1995 to 1998 ABB SAE SADELMI – Construction Manager with ABB SAE SADELMI for “ GHOM Combined Cycle Power Plant ”

The Project is consisting of :

N 4 HRSG ( Combustion Engineering )

N 2 Steam Turbine/ Generators ABB/KWE Germany )

N 1 Water Treatment Plant ( IDRECO ).

N 1 Auxiliary Plant ( BONO – ATLAS – COPCO )

N 2 Air Cooled Condensers ( GEA .Germany )

N 2 C.C.C.W ( GEA Germany )

-Electrical System for all Power Plant ( HV – MV – LV )

-I & C System for all Power Plant

-Insulation, Painting, HVAC System

1991 to 1995 ABB SAE SADELMI; Construction Manager – Deputy Site Manager for Rabigh Steam Power Plant Extension- Conversion to Combined Cycle & Infrastructure- Rabigh Saudi Arabia

The Project was consisting of :

N 8 HRSG ( Cockeril Mech. Industry ).

N 2 Steam Turbine / Generators of 133 MW ( ABB – Baden ) Switzerland

N 2 Crude oil Tanks of 64000 CM by CBI

N 4 Water Tanks

Water Intake – Civil Part

Water Pump House – Civil – Mechanical part

C. W Distribution System

Control Room

Electrical System (Procontrol System)

Channel / Road Steel Bridges

Painting

Insulation

HVAC System.

1990 to 1991 SNAMPROGETTI: Contract Manager for the “ LNG Plant ” at Panigallia – Snam S.p.a. Italy.

Managing the demolition of the existing plant and the construction of the

Mechanical, Insulation, Painting contracts.

1989 to 1990 SNAMPROGETTI: Precommissioning Engineer for Tanks Farm/BD Sulfur Plant at Rabigh Refinery – Saudi Arabia with Snamprogetti S.A.

1988 to 1989 KOMES : Construction Manager for the contract AGIP/KOMES and ENICHEM/ KOMES – Gela

Responsable for Mechanical works, Painting and Thermal insulation of the Recovery Crude Oil Center at Gela. Responsible for Mechanical works of Pumping Station Relocations at Gela, Rasi.

1986 to 1988 SNAM: As Project Co-ordinator for the NNPC/SNAM contract, responsible for the :

Management

Operation

Maintenance

Of the NNPC National Gas Gathering, Transmission and pipeline System in the Nigerian Gas Company of NNPC, Nigeria.

1981 to 1986 Construction, Commissioning, Start-up Manager at Bandar Abbas Thermal Power plant 4 x 320 MW, Iran.

In this position held responsible for the construction of N 2 units for the commissioning and start-up of all mechanical equipments of the plant and maintenance:

Boilers

Turbines

Generators

Thermal Cycles

Gas reducing Station

Fans

Auxiliary Plant

And also had the responsibility of the As Built Dept – Punch list

1980ROSSETTI : Site Manager at Ruwais Refinery, U. A . E during the construction of A.D.N.O.C. Refinery for Thermal insulation system

1967 to 1980 ANIC : Operation and Maintenance Superintendent at Gela Petrochemical Complex .

In this position, he was responsible for the operation and the maintenance of all the facilities relevant to :

22 MM cm DAM on Dirillo River

Pipe rack and Utilities

Waste water Treatment

Ballast water Treatment

Sewage System

Blow Down and Flare System

Desalination Plant

Also in this position, had the responsability to carry on the debottlenecking project with an investiment of 150 MM USD.

1964 to 1967 ANIC: Operation & Maintenance Supervisor at Gela Refinery.

In this position, was responsible for the operation & maintenance of several facilities like:

Oil and Gas pipelines including pumps and compressors

Ethylene storage and pipeline

Water treatment Plant

Ammonia – Sulphuric Acid – Caustic Soda pipelines

API Separator.

1961 to 1964 ANIC: Shift Engineer on Aux. plants and Hydr. Units at Gela Refinery

Reference Managers: Dott. Ing. A. Arcidiacono (ENI )

Dott. Ing. F.Chiaruttini ( Enelpower- Technimont )

MR. Lino De Lorenzo. (Mellitah Gas,Libya)

El. M. Kashim. (Mellitah Gas Libya)

Dott. Ing. Mimmo De Marzo