Joh Goody
Fort Worth, TX 76132 ******@****.***/*********@*****.*** Cell: 817-***-****
DEGREES / LICENSES
ASQ Certified Quality Engineer (CQE)
BS in Aeronautics – Embry Riddle Aeronautics University- (Expected August 2015 )
ISO/AS certified
FAA Licensed Authorize Inspector (IA) Since 2009,
Airframe and Power plant Certification (A&P) since 2005
FCC General Radiotelephone Operator (PG) and Radar Endorsement Since 2009
Core Professional Quality Engineering Qualifications
ISO & AS Leadership
Lean Quality Tools (FMEA, Pareto Charts, Fishbone Diagrams, Six Sigma 5S, 8D Methodology)
Finite Element Analysis (FEA)
Geometric Dimensioning and Tolerancing (GD&T)
Process Development & Improvement and Scrap Reduction & Output Increase
Statistical Process Controls (SPC) and Quality Auditing
Systems Design & Automation and AutoCAD, MS Project & MS Office
Extensive working and theoretical knowledge of purchasing practices
Strong knowledge of Supplier Management issues and Complex supplier quality solutions
Risk-based supplier audit research and Supplier Corrective Action Requests and NCR system management.
Core Professional Aeronautical Qualifications
Aircraft & Avionics Systems
Aerodynamics, Mechanics & Thermodynamics
Propulsion
Project Plans & Documentation
FAA & DOT Regulatory Compliance
Experience
Sikorsky Aircraft/APA, Coatesville, PA 09/2014 – 06/2015
QA Inspection
Perform inspection in production, completion/Repair Station and Customer delivery stages during the fabrication, installation, and assembly of the S92 and S76 aircraft to insure that the workmanship and materials conform to the aircraft manufacturers’ specifications and maintenance manual procedures. Utilized the Solumina system to generate report discrepancies (DRs). Monitor systems testing and Avionics/Electrical installations and checkouts. Determine accuracy of installation of components in power plant and hydraulic system to ensure that specified tolerances are met.
Coordinate, and facilitate all maintenance activities performed on flight test aircraft during all phases of the flight test program. Install/OK to Close, and Preflight Inspections on S76D, S92A and CH-148 Helicopters. Updates/maintains Aircraft Records (paper and computerized).
Perform inspection on the transmissions, GE CT7 -8A and Pratt & Whitney PW210S Engines.
Armstrong Aeromod/ Delta Airline – Wayne County International Airport Detroit, MI
GoGo Avionic/Structural Modification Inspector – 4/2014- 9/2014
Responsible for inspecting aircraft avionics and structural systems upgrades, installations and modifications as directed in accordance with the rules and regulations set forth by the FAA and our customer. Interfacing, troubleshooting, and the installation of the latest avionics equipment .Electrical wiring interconnection system (EWIS), Enhanced Airworthiness Program for Airplane systems(EAPAS), Enhanced Zonal Analysis Procedure(EZAP), General Visual Inspection(GVI) and Detailed Inspection(DET).
Perform inspection on the KU Airborne WiFi Subsystem on Airbus 330/B747s and the Broadband (ABS) ATG4 Airborne subsystem on Airbus A319/B737s
Rolls Royce/ Sikorsky Aircraft/ VERIFY INC Feb 2013 – April 2014
Project/Quality Specialist/ Contract Supplier/Vendor Quality Representative (CQR)
Supplier management operational testing and evaluating manufacturing processes systems.
Production Control and Supplier Surveillance - Source inspection (visual and dimensional), inspecting machined parts, Knowledge in GD&T and interpreting complex blueprints and performing AS9102 First Article Inspection . Production Control and Supplier Surveillance, Monitoring, testing and inspecting products to make certain they meet specified standards. Testing products to determine how long they will last, what part may break down first and how to improve product durability and inspecting product materials, mechanics and electrical systems.
UTC (United Technologies Aerospace systems) Landing Gear Facility- Fort Worth, TX
July 2013- Jan 2014
Quality Technician (Senior Inspector)
Inspected the production/ Assembly of the F15, F16, F18, F35 and C-17 aircraft landing Gears
Responsible in sharing in the responsibility for providing statistical product and process analysis; support Quality Engineers with deployment of positive change as it relates to process development/improvement efforts, and continually audit product and processes to assure compliance to Quality System, testing and specification requirements
Worked with precision measuring tools, testing per ATP and systems such as CATIA, MATRIX, SAP to generate QNs and quality tags. Proficient in MRP software
AAR Aircraft Services- Duluth, Minnesota
April 2013- July 2013
Aircraft Maintenance Inspector
Performed MRO work repair, alter, modify and inspect tasks performed on Air Canada Airbus 320s 319s and 321s in accordance with AMM and SRM per AAR(Repair Station Quality Manual)
United Technologies Corporation - Goodrich Aerospace Systems - Chula Vista, San Diego, CA
Jan 2013- April 2013
A&P/Aircraft Structural Inspector
Inspected Assembly, maintenance and sheet metal work on the Boeing 787 General Electric and Pratt & Whitney Engines inlets and thrust reversers production lines - Layouts, drill, countersink and riveting
Composite hand layup, vacuum bag processing, autoclave processing, resin transfer, compression molding, clean room bonding, and injection molding.
Lockheed Martin Aero, Fort Worth, TX April 2012-Jan 2013
Structural/Avionic Assembler
Worked on the JSF (Joint Strike Fighter) F35 program as a Structural/Avionic assembler on Final line-EMAS / Wing box mating stations and Landing gear installation. Familiar with QA processes for Inspection, data management, SFM, EWIS, QAD, blueprints and engineering documentations
Spirit Aerospace Systems/PMP, Tulsa, OK Jan 2012-April 2012
Production Control Specialist
Receiving Inspection and inventory on the 787 wing assembly project
Perform work scheduling of Crews of both shifts.
Responsible for parts and material inspection in accordance with company purchase order requirements, drawings and standard specifications with the use of precision measuring instruments like Gap gun, Micrometer, Micro hite, Sine bar, Comparators and Profilometer for skin mismatch, height, concentricity, and roughness in compliance with dimensions
Maintaining receiving records- logs, inspection records, monthly stockroom inventory and material identification tagging
Pratt &Whitney/Southern California Aviation, Victorville, CA. Nov. 2011- Jan.2012
A&P Mechanic
MRO work - A Checks, preservation, Induction and reactivation (storage) on heavy commercial Aircrafts and Engines- B747, MD80, B717, DC10, MD11, Q400, B757-200, B767-300ER, B737, Gulfstream Airplanes and Falcons. Worked on Spey and Tay 611-8/511-8/upgrades Rolls-Royce engines off 722-100series and Gulfstream IV
Pacific Aerospace Resources and Technologies- Victorville, CA 07/2011-11/2011
A&P/Sheet Metal Mechanic
Repairs and maintenance on heavy commercial narrow and wide body aircrafts (MRO)
Performed A, C&D checks on B747-200/400, B707
Inspect aircraft and components by obtaining and interpreting work cards, reviewing inspection and maintenance requirements scope and detail then completing the task.
SWISSPORT USA-Los Angeles, CA 01/2007-01/2012
A&P/Aircraft Flight Line Maintenance Technician( second job - Night-time)
Perform Preflight/Daily checks on A 300(Aero Union Airlines) and B 777-300ER (Turkish Airlines)
Perform aircraft inspection and services in accordance with applicable customer’s instruction/procedures and sign for action taken and record keeping when work is accomplished as required by AMM/ GMM
IFE systems
Minor sheet metal work (taking off panels/fixing dents)
ROBINSON Helicopter-Torrance, CA 12/2004- 4/2009
Aircraft Mechanic/Inspector
Clutch, gearbox, swash plate, collective, spindle etc. assemblies and drill, countersink, shimming and fasteners installation on the R22, R44 and R66 Helicopters
Perform repairs and servicing of R66 Rolls Royce RR300 Turbo shaft, R44 /R22 Lycoming IO-540-AE1A5 Engines
Production Phase inspection Sub Assembly Dept. for R22 /R44 helicopters 12/2004 4/2009
Performed pre-assembly inspection P/A and final inspections/ functional checks with the use of precision measuring instruments - micrometer, caliper, dial indicator, bore gages on the drive train components i.e. clutch, fan wheel, gearbox in accordance with Title 14 CFR 21
Repair station phase inspection performed 100Hr and Annual inspections in accordance with Title 14 CFR 27, 43, 91, Airworthiness Directives, Specifications, Forms 337 and 8130-3 Airworthiness release certificate
EDUCATION
Embry-Riddle Aeronautical University, Daytona Beach, FL
Major: BS in Aeronautics, Minor: BS in Engineering Science GPA: 3.0 (A=4.0)
Westwood College of Aviation Technology, Inglewood, CA. Graduated Dec. 2004
Major: Airframe and Power plant GPA: 3.4(A=4.0)