Manufacturing Engineer Summary
For Thirty years I have worked at Aerospace companies, as a direct hire and a contractor, acquiring extinctive knowledge in the manufacturing processes as a Supervisor/Manager, Manufacturing Engineer / Planner and a Quality Engineer. With twenty years of fabrication and assembly of aircraft detail parts and assemblies. I have a working knowledge of lean manufacturing. I have created planning sequences for the fabrication of detail parts, sub-assemblies and major assemblies from engineering drawings and all types of engineering releases. I created tool orders for new tools and the rework of existing tools.
Participated on Integrated Product Team (IPT) to identify and search for the desired solutions of problems.
Interfaced with vendors, engineering, quality and management in meetings to assure all are striving to be on schedule with deliveries. Ensure that quality policies are being practiced. Using independent judgment to accomplish objectives within defined policies and procedures
Systems Experience:
CATIA v5, Delmia, Enovia, VMCSII, Capps and SAP
ThyssenKrupp – Fort Worth, TX Nov 2012 to present
MANUFACTURING ENGINEER / PROPOSAL SPECIALIST
Planning for assembly of Bridge assemblies.
Working knowledge of lean manufacturing, currently enrolled in a Six Sigma online class to get my Green belt certificate.
Wrote planning sequences for sub-assemblies and major assemblies from Engineering drawings and New Engineering releases.
Presently working continuous Improvement and Involved in Six Sigma improvement.
Triumph Vought Company – Fort Worth, TX Aug 2012 to Nov 2012
MANUFACTURING PROPOSAL PLANNER (contract)
Created planning for sheet metal details and wrote tool fabrication orders for the 747-8, using the SAP planning system and CATIAv5, Enovia and Delmia.
Developed, implemented and maintained manufacturing plan, bill of material, work instructions and illustrations.
Developed RFI’s, new business proposals.
Developed tooling requirements by performing tool analysis based on manufacturing engineering requirements.
Provided input to design.
In the times I have worked at Vought I have worked on many programs
Middle River Aircraft Systems - Middle River, MD Sept 2011 to Aug2012
MANUFACTURING / PLANNING ENGINEER (contract)
Manufacturing Engineer, working floor support of V-22 wing assemblies.
Develop and Maintained assembly plans that production can interpret and can work to.
Created rework tool orders for sub assembly tools.
Red lined shop floor planning.
Added illustrations to the planning for ease of assembly using illustrator.
Revised detail and assembly planning to be in compliance with AS9100C standards.
Develop, evaluate and implement the overall manufacturing plan.
Conducted, manufacturability assessments of the design concepts task including creating the manufacturing plan, data analysis, development/installation of production methods and processes, preparation of estimates for bids and proposals.
Assisted in make or buy proposals.
Planner Bell Helicopter - Amarillo, Texas. Dec 2010 to Aug 2011
MANUFACTURING ENGINEER
Manufacturing Engineer working direct shop floor support on the OH-58
Updating / creating new sub-assembly shop order travelers writing tool orders to replace lost and broken tool.
Revised shop floor planning and up dated the planning Master in the computer’s Velocity data base.
Wrote rework planning to correct vendor supplied detail parts and sub- assemblies.
Using SAP and Capp planning systems, verifying parts are per the CATIAv5 and ENOVIA model data base
Hawker Beechcraft - Kansas Aug 2010 - Oct 2010
MANUFACTURING ENGINEER / Operations Program & strategy (contract)
Wrote assembly planning for out sourcing the 400 series aircraft to Mexico
Using the CAP planning system. Verified the EBOM and MBOM were in accord.
Using the S.A.P. system
Vought Aircraft Company - Dallas, TX Oct.2005 - Aug 2010
MANUFACTURING ENGINEER PLANNER (contract)
Projects assignments C-5, 767, CH-60, 787, 747-8 C-17,747-8, CH-60 and Gulf Stream V Global outsourcing of sheet metal and machined parts.
Created planning for sheet metal details and wrote tool fabrication orders for the 747-8.
Assigned to an IPT team for (5) months in Israel as a Quality Engineer. At IAI Aircraft
Co-representing Vought Aircraft Company as a technical contact on the 787 composite program. Verified the first article, and identified details parts issues. Assisted in resolving vendor problems with composite lay up of floor beams and beam assemblies. Interfaced with NC Programming on the development of manufacturing process plans, hold in fixture concepts
Manufacturing Engineering planner investigated and resolved manufacturing related issues, applying lean principles to manufacturing methods.
(Sheet metal) Developed implemented and maintained various manufacturing plans for various programs, to define and document as built configuration. Developed tooling requirements based on manufacturing and engineering requirements.
Vought Aircraft Company - Dallas, Texas. Oct 2005 - Aug 2011
MANUFACTURING ENGINEER/ PLANNER
Projects assignments C-5, 767, CH-60, 787, 747-8
At the present assigned to the C-17,747-8, CH-60 and Gulf Stream V Global outsourcing of sheet metal and machined parts.
Created planning for sheet metal details and wrote tool fabrication orders for the 747-8.
Spirit Aero Structures Jul 2005 - Oct 2005
MANUFACTURING ENGINEER PLANNER
Contract Wyatt and Assoc. Wichita, KS.
Composites for the 41 section of the 787 create/revise manufacturing plan
For the hand and automate ply lay-up of the composite barrel section and stringers.
Create Dart files, CAPP/PDM and a working knowledge of MES.
Utilized CATIA v5 verifying production parts are correct to engineering.
Training: 40 hours of CATIA v5, 40 hours of Enovia, 24 hours of DELMIA and 32 hours of on line CATIA companion class.
Contract P.D.S Technical Irving Texas.
Vought Aircraft Company Dallas Texas Oct 2002- Jul 2005
Contract RMI /ASGARD Arlington Texas (C-5 MOD.
MANUFACTURING ENGINEER PLANNER
Provided detail planning instructions, Issues with tooling, detail, sub-assemblies and final assemblies on the C-5 control surface program, using the Vought Aircraft VCMS II planning system, Microsoft windows 98, MS office and Word.
Manufacturing Engineering planner investigated and resolved manufacturing related issues, applying lean principles to manufacturing methods, for the Black Hawk helicopter sheet metal assemblies.
Involved in creating a new business proposal for C-130 to fabricate and build the elevator, flight control surfaces.
New business proposal for the P3.
Bell Helicopter – Amarillo, Texas Jun 2002- Oct 2002
Contract PDS
MANUFACTURING ENGINEER (V22 OSPREY)
Liaison Manufacturing Engineer preparing work instructions and follows up on nonconforming Composite detail parts and or assemblies.
Continuous improvement via work instructions, statistical process on the modification of the V-22 Osprey for return to flight configuration and delivery for testing.
Bell Helicopter – Hurst, Texas Apr 2001 – Dec 2001
Contract NCN Dallas, Texas
MANUFACTURING ENGINEER (V22 OSPREY)
Created planning for activities in machining of composite panel’s using the water jet.
Created planning for composite fittings.
Wrote cost estimates for new tools. Estimated cost for engineering changes which included man hours for planning, project engineering, R and D and tooling for in house and purchase tools from outside vendors which included man hours for fabrication and tool design.
Verifying tooling was correct using (CAD) Unigraphics II computer designs.
Lockheed Martin - Fort Worth, Texas May 2000 – Mar 2001
MANUFACTURING PLANNER (F-16 Fighter)
Interpreted engineering documents flow process for creating electrical wiring installation planning for the Air ForceF-16 program.
Updated original operation plans for engineering order changes, revised installation sketches for electrical components.
Northrop - El Segundo / Hawthorne 1998 - 2000
MANUFACTURING ENGINEER
Composites (F-18 aft body section Details) & (747 re-tooling Program) Using the established manufacturing process flow, defined sequences of events, developed text & graphics work instructions/ illustrations, from manufacturing datasets, tooling requirements, & manufacturing bills of material.
Created planning for detail parts and sub-assemblies, For the F-18 aft section and 747 AFA retooling program
Reviewed first articles, rejection tags for cause, and worked assembly planning revisions.
McDonnell Douglas/Boeing - Long Beach, CA & St. Louis, MO 1996 - 1998
MANUFACTURING ENGINEER
(MDTSC, Contract Labor)
McDonnell Douglas at St. Louis on the F-18 E&F forward fuselage, Revised on Line Planning for Detail & Sub-assemblies.
McDonnell Douglas in Long Beach assigned to MD-11 project creating detail purchase plans for vendors.
As a supplier Quality Engineer reviewing vendor rejections and assisted with feedback for root-cause analysis and correction.
General Dynamics - Convair Division - San Diego, CA 1991 - 1996
MANUFACTURING ENGINEER / Team Leader - Product Support Team
Directed and coordination rework for Product Support Team personnel located at McDonnell Douglas Aircraft Company's MD-11 assembly facility Long Beach Ca.
Reviewed all customer-identified discrepancies to verify validity and provide feedback for root-cause analysis and correction.
Developed planning and implementation schedules for warranty required rework activity with minimum impact to customer production schedules, developed labor estimates and material / parts for required rework.
Northrop - Perry, GA Division 1992 - 1993
MANUFACTURING ENGINEER
(Johnson Service Group Contractor Labor)
Four-month assignment at Northrop - Perry, GA Division providing technical support of planning and correcting Assembly Jigs to reflect current Engineering 747 Off-load of frame and doors assemblies.
Boeing Aircraft Company - Seattle, WA 1988 – 1991
MANUFACTURING ENGINEER
(Kirk-Meyer, Inc., Contract Labor)
Performed technical review and analysis of B2 aircraft engineering documentation for production engineering, of composite detail parts (structural assemblies, & hydraulic tubing installations.)
Northrop -Ventura, CA Division 1986 - 1988
SENIOR MANUFACTURING ENGINEER
Developed, and implemented manufacturing plans / procedures for sheet metal fabrication, machine/detail part fabrication, for sub-assembly for the747 off-load activities.
Rockwell International - Palmdale, CA 1985 - 1986
B1-B PRODUCTION SUPERVISOR
Supervisor of forward assembly of fuselage panel assemblies.
Gates Learjet - Wichita, KS & Tucson, AZ 1971 - 1985
DEPARTMENT MANAGER/SUPERVISOR
Manager of completion center for five years. Prior to that I was a supervisor of fab shop, machine shop, wing shop for about ten.
Boeing - Wichita, Ks. 1966 - 1971
TOOL MAKER
Task of fabricating of tool fabrication
Education:
Witchita State University – NON DEGREED 1973
Manufacturing Engineering sponsored courses including Composites, Robotics Technology, product support, Concepts, Paint processes and Mil-spec Requirement Implementation and Compliance.