SHAGEER S KHATRI
Ascon acres *th / A wing,
*th /704 near mayor bang low,
Naya nagar Mira road ( E ),
Mumbai 104, E-mail: *******.**@*****.***
Maharashtra. Phone:+91-987*******
NAME : M.Shageer Salim Khatri.
DIPLOMA :Interior designer ( Maharashtra state board technical education )
PROFESSIONAL OBJECTIVE:
Consistent endeavor to achieve a challenging and rewarding career in an organization, thus effectively contribute to add value for overall growth of the organization and prove my mettle.
Designtion:Sr.Interior Designer Asst project manager, with responsibilities including preparing conceptual design, giving presentations, guide to preparing working drawings and construction details, co-ordination with other disciplines, Appointment of consultants for project. Approval of building materials & expertise in site execution.
EXPERIENCE SUMMARY
Have got 9 years and 1 months of work experience as an Interior Designer & Asst project manager ( Project )
CLASS / COURSE
NAME OF THE
INSTITUTION
BOARD OF STUDY
YEAR OF PASSING
MARKS % / CGPA
DIPLOMA
Rizvi collage of Architecture.Interior Designer
MSBTE Board
2007
2ND CLASS
DIPLOMA
Mhit Institute Auto Cad
Maharashtra Board
2006
A
DIPLOMA
Global govt recognized education centre. 3Dmax
Maharashtra Board
2006
A
Name of the firm
Duration
Role
Area of Expertise
Al kazim furniture LLC Dubai Emirates.
From Dec 2005 to May 2009
Interior designer
Design for Residential, Commercial Apartments and Bungalow interior.
(Sahara International Airport)
From May 2009 Till 2013
Sr.Interior designer.
From May 2009 working in Larsen & Toubro as Interior designer for EDRC department and promoted in Sr Interior designer coordination for finishing department Mumbai International Airport Project, Mumbai
Wits interactive pvt ltd a divison of Terrawits Mumbai india.
From 2013 Till
Sr. interior designer project manager asst.
From Nov 2013 till as an sr interior designer project asst manager ( IPCA laboratory ) Head office Mumbai. All finishing activity coordination drawing approval & site execution 150000 sq.ft area Including all services.
In Wits interactive pvt ltd : Mumbai ( IPCA lab project Head office commercial )
Commercial building ipca plot – 125 Total area each Floor 29500 sq.ft from lower basement till 6th floor.
All floor designing shop drawing, presentation & sample of material with costing.
Site execution with technical team as Asst Manager detailing in brief execution.
All interior & exterior package scope including services & automation AV/VC.
In Mumbai : Sahara International Airport ( Mail Project )
Ancillary buildings for Mumbai Sahara International Airport Project.
MLCP for Mumbai Sahara International Airport Project.
BOH PACAKAGE for Mumbai Sahara International Airport Project.
Block Wall PACAKAGE for Mumbai Sahara International Airport Project.
1.Lead a team of architects, draftsmen, Technical assistants for the detailed design development.
2.Co-coordinated with departments Civil & Structural, Electrical, Plumbing & Sanitation, HVAC (Heat, Ventilation and Air-Condition), IT & Special systems (Information and Technology), Fire protection & Piping, Pavements & Roads and Fuel Hydrant System
3.Design and prepare drawings for Airport Terminal, Service building, Substation, boarding bridges, Ancillary building, Cargo buildings, Rescue operation building
4.Develop concepts with strong visual, functional design principles and aesthetic sense reflecting the architectural styles/ image of the client, presentation and sketch detailing of drawings and architectural submission of drawings to meet relevant local authority requirements.
5.Formulate design, which is practical, aesthetic, and conducive futuristic usage.
6.Creating and submitting shop drawings / Working drawings with details supporting the drawing as per the standards (Local or International standards).
7.Reviewing pre submission design documents, drawings and details.
8.Coordination with site for solving issues and after discussion, issuing Drawings or Details.
9.Regular site visits for site coordination.
10.Confirming the system to be followed, according to design specifications and quantity of required materials. Integrate engineering element into unified design
11. My responsibility encompasses from 2009 to till date coordinates to Finishing work from SWP to PROCESSOR AREA, around 50000.00sq.mt
12.Given service core coordinates for SWP before starting work for ACP cladding, I- sections and fabrication works from level 01 to level 06.
13.Given co-ordinates for toilet area in SWP and Processor achieved with respected completion for staff toilet and public toilet area.
14.Given coordinates with coordinating between project office through site office engineers for block wall cutout and services.
15.Preparing 3D views and concept designing for EDRC team given MLCP building, utility service building, Toilets area, Sahar Police Station and BOH package.
1.Highly motivated toward professional development and advancement.
2.Demonstrated effectiveness working independently or as a team.
3.Outstanding organization and planning skills; adept at problem mediation and resolution while successfully upholding company objective.
4.Excellent communicator; interact effectively and professionally with individuals in all levels of business.
5Respond effectively and creatively to change; highly adaptable to fluctuating requirements and situations
In Dubai : Al Kazim Furniture LLC.
1.AL Tamimi and Co, Advocates,
The Scope of work for this Project was to Design and execute a 2700sqm of Office for a highly reputed Law firm of Dubai. The site was located in DIFC, Dubai.
The Project was executed in 100working days adding on a lot to my experience.
2.Burt Hill, (Consultants Office, Dubai)
The Scope of the Project was to execute a 2000sqm of Office for the Consultancy Firm as all the Design Drawings were received by the Designers in Chicago;
The Project included two floors to be furnished with Flooring works, Ceiling, Civil and MEP services.
The site is Located at Dubai Investment park.
3.Eden Park Stores, DFC, Dubai.
This Project was a Retail outlet of 200sqm for Men’s wear, it is under the Group of Rivoli LLC, and the Scope consisted of Executing the Project as per the Standard of the Original Store in Paris.
The Designs were provided by the Chief designer of the Store from Paris, the work was executed in Dubai Festival City mall as per the Standards of the Mall.
The Project was executed in 45working days.
4.Angels Stores, Wafi Mall, & Jumeirah Beach Residence, Dubai
This Project was a Retail outlet of 200sqm for Children’s Fashion wear, it is under the Group of Rivoli LLC, and the Scope consisted of Executing the Project as per the Design and Specs of the UK based Designer Zebra Design.
5.Younly Stores, Burjuman Mall, Dubai
This Project was a Retail outlet of 140sqm for Children’s Fashion wear, it is under the Group of Rivoli LLC, and the Scope consisted of Executing the Project as per the Standard of the Original Store in Paris.
The Final Furnishing materials such as Display Units and Wall Panels were imported from France and Germany, our Scope was to execute the Civil and MEP works and prepared the shell of the store as per requirements of the finals Finishes.
6.24Seven Convenient Stores, (7No Outlets around Dubai),
This was a Store was a part of our Group of Companies, I was fulltime involved in the project from the scratch till the end of project which includes drawing preparations, costing and execution of the Project at site.
7.Al Mulla Majlis @ Nad AL Sheba, Dubai.
The Majlis was designed by M/s Wren & Associates Architect; I was a part in the execution as well as preparation of the entire workshop and detailed Drawings of the Project.
8.Residence Villa in Emirates Hills, Dubai.
I have executed a number of Residential Villa’s in Emirates hills, Dubai; some of them are named here as, Adib Al Ataya Villa, Mrs. Atena Villa, Mr. Nandwani’s Villa, Majed Al Kareem’s Villa.
Apart from the above Projects I have been a Part of some other prestigious project with my present company Involving Projects as Restaurants and Café’s.
1.Reading books
2.Traveling
English
Hindi
Marathi
DATE OF BIRTH : 09.02.1987 AGE : 26 GENDER: Male
FATHER’S NAME : Mohammed shamim khatri
RELIGION : Muslim NATIONALITY: Indian
MOTHER TONGUE : Rajasthan
M. shageer khatri do hereby declare that the information cited above is true to the best of my knowledge.
SIGNATURE: