ANDY LOPEZ
**** ********* **., ***********, ** **312 • Cell: 661-***-**** • *********@*****.***
SUMMARY OF QUALIFICATIONS
Petroleum Engineer with 27 years of experience as a production engineer, reservoir engineer and sales representative.
Provide SEC reserves, full field development plans, annual capital budget and project economics
Forecast CAPEX, OPEX, well schedule and oil and gas production
Analyze oil and gas production surveillance to predict and improve production
Design hydraulic fractures, acid jobs and completions and associated well work programs
Experience with TETRAD, SSI Therms-S (reservoir simulation programs), Oil Field Manager, Dynamic Surveillance System (production analysis programs), Aries, PEEP (economics programs) Excel, Word, Power Point, and Lowis
EXPERIENCE
Consulting Feb 15 – Current
Run economic evaluations for development and acquisitions
Business Development Representative, Enova, Bakersfield, CA Oct 12 – Feb 15
Get new accounts and make stimulation recommendations
Provide consulting services
Senior Staff Reservoir Engineer, Berry Petroleum, North Midway Sunset, CA, March 11 – Sept 12
Recommended Pan Potter steam increase from 3,000 to 7,000 BSPD resulted in an incremental 450 BOPD increase
Recommended Fairfield Potter steam increase from 1,000 to 4,500 BSPD resulted in an incremental 250 BOPD and still increasing.
Recommended completion changes to 21Z Tulare and Pan Potter expected result is less than 20 days down time per well per year and increased production by 28% beyond old completion practices
Senior Production Engineer, Seneca Resources, North Midway Sunset, CA, July 08 – March 11
Recommended operating policy change resulted in an increase of ~750 BOPD (17%)
Made steam forecast resulted in an increase of steam from 12,500 BSPD to 20,500 BSPD
Recommended AFEs totaling 5.925 MMBO reserves and 1,200 BOPD
Technical Sales Manager, BJ Services Company, Bakersfield, CA, Nov. 06 – July 08
Maintain and get new accounts
Received new account worth $12MM/yr.
Region Engineer, BJ Services Company, Bakersfield, CA, Jan. 05 – Oct. 06
Design fractures, acid jobs, cement jobs and make Proposals
Senior Production Engineer, Macpherson Oil Company, Round Mountain Unit, CA, Jan. 04 – Aug. 04
Recommended development of the Pyramid Hills formation potential 15 MMBO reserves
Supervise/Monitor drilling program and installation of facilities
Senior Reservoir Engineer, Plains Exploration and Production, Mt Poso and Arroyo Grande, CA, Jun. 00 – Dec. 03
Recommended 196 wells and 43 Recompletions at Mount Poso Resulted in drilling 196 wells and 18 Recompletions for ~5,540 MBO
Hydraulically fractured 96 wells
Recommended to shut-in the Fireflood at Mount Poso, since the wells failure rate exceeded the incremental oil value that resulted in an immediate increase oil response
Recommended 41 producers and 15 steam injectors at Arroyo Grande that resulted in ~4,800 MBO
Recommended steam injection to decrease effective decline rate from 29% to 15%
Recommended slimhole steam injectors at Arroyo Grande that saved $45M/well
Recommended triple string injector at Arroyo Grande to increase steam flux that resulted in three times as much steam injection per well and decrease steam response time
Made three acquisition evaluations and assisted in various other acquisition evaluations
Provided economics, reserve estimates, surveillance, field analysis, depletion plans, and capital budget plans
Sr. Production/Sr. Reservoir Engineer, Texaco/SFER, Kern River, South Belridge, CNU, Shafter, Jan 96 – Jun. 00
Designed and recompleted 18 steamflood patterns which resulted in 753 MBO
Recommended and implemented steamflood profile improvement for 1,221 MBO
Recommended changes in steam targets that saved $845M in steam
Developed a plan for the water interdiction project
Provided a Vogel spreadsheet and Latent heat discussion to peers for steamflood injection rates
Developed well locations and economics for Shafter light oil
Recommended to stop dewatering of CNU gas cap. Made a pressure-content plot, P/Z Vs Q, and recognized the gas was trapped in the water
Recommended and initiated a Lower Tulare 1.25 acre pilot steamflood pattern for a probable 1.2MMBO increase in reserves
Added potentially 300 well locations to an existing waterflood at the King Ellis lease
Increased the number of yearly development wells from 12 to 29 at the King Ellis waterflood
Successful top bidder in the Arroyo Grande acquisition evaluation
Reservoir Engineer, Mobil, Sublett Co., WY, Feb. 95 - Dec. 1995
Analyzed, evaluated and optimized reservoir/zone/section/well gas field performance
Economic analysis and reserves evaluation showing diminishing returns and uneconomic decisions
Well normalization study of gas wells
Reservoir Engineer, Mobil, North Midway, CA, May 92 - Feb. 95
Developed and produced heavy oil reserves, manage capital and expenses for steamflood development, redrill, and surveillance
Forecast production/injection rates, capital, and expenses for business planning, and report the same for Ad Valorem taxes, Federal EOR tax credits, and reserve surveys
Analyzed, evaluated and optimized reservoir/zone/pattern/well steamflood performance
Recommended 11 well recompletions and increase reserves 1MMBO @ $1/BO
Stopped steam injection of an uneconomic lease (Bolivar)
Optimized steam injection of the Alberta/Shale leases and saved 4,000 BSPD
Provided Shale lease simulation studies showing oil slumping in water zone
Production Engineer, Mobil, Lost Hills, CA, Dec. 87 - May 92
Designed and optimized producer & injector completions, artificial lift, and basic well stimulations and workovers
Increased steam injectivity 4,000 BSPD and oil production 420 BOPD at Lost Hills
Implemented 3 Heavy oil steamfloods
Designed and developed Mobil’s first slimhole injectors and TOW’s
Well, pattern and field performance evaluations, with Production Analyst
EDUCATION
Masters of Business Administration, University of Phoenix, Bakersfield, CA, March 2000
Bachelor Science of Petroleum Engineering, University of Southern California, Los Angeles, CA, Dec. 1987
TRAINING
OFM Fundamentals, Jul. 2012
CMG Stars simulation, May 2011
Six Sigma Black Belt, Nov. 2010, Six Sigma Online
Waterflooding: Performance, Predictions and Surveillance, Oct. 2010, William M. Cobb
Fundamentals of Supervision, Oct. 2003, Bakersfield College
Mangement and Reservoir Engineering of Watefloods, Nov. 2002, I. Ershaghi
Economic Evaluation, ~Feb. 2000, Franklin J. Stermole
Subsurface Heat Mangement, Nov. 1999, Suzanne Griston Castrup
Investment Science for Industry, Sept. 1999, Standford Univ., David G. Luenberger
Fundamentals of Steamflooding, Mar. 1999, P. J. Closmann
Exploration Economics, Risk Analysis and Prospect Evaluation, Jun. 1998, Jim Mackay
Steamflood Reservoir Management, Feb. 1997, K. C. Hong
Practical Aspects of Waterflooding, July 1996, Roy Engineer
Cased Hole and Production Log Evaluation, Sep. 1994, Dr.J.J.Smolen
Advanced Oilfield Management Using PA, Jan. 1994, OGCI
Reservoir Simulation, Nov. 1993, OGCI, Dr. L. C. Young
Thermal Recovery for Geologists, Feb. 1993, Thomas C. Boberg
Gas Reservoir Engineering, Oct. 1991, H. C. “Slip” Slider
Hydraulic Fracturing, Jul. 1991, OGCI, C. R. Fast
Thermal Recovery Engineering, Mar. 1989, S. M. Farouq Ali
***References Available Upon Request***