Deepak Kumar Saini
E-Mail: *******@*****.***
+91-757*******, +91-976*******
CAREER OBJECTIVE
To pursue career in a progressive organization offering PLM - CAD solutions
PROFESSIONAL EXPERIENCE
PLM – Teamcenter, CAD-CAE – UG (NX) Domain
Teamcenter Unified - Teamcenter Implementation/ Administration
Production Site/ Customer Technical Support – L2 & L3
Teamcenter BMIDE, Multisite, Teamcenter Modules
Siemens certified UG-NX Design User, NX Support
Work experience globally: Holding UK-VISA (Business) Long term (2 Years – Active)
EXPERIENCE SUMMARY
I am a PLM – CAD Technical Analyst associated with Lucy Electric. Work involved enhancing PLM and other engineering systems to support business growth along with new and emerging needs. Analyze requirements, recommend solutions, implement projects working in an agile environment and ensure the PLM systems meet the business and service level objectives.
Company Name - Lucy Electric (India) Pvt Ltd (W Lucy & Co Ltd – Switchgear MFG Unit)
Duration - March’2015 to till date
Designation - CAD PLM Support Engineer
Profile - Individual Contributor for PLM - CAD Support in Lucy India, Dubai and Thailand Unit
Lucy Group – Over 200 Years of Engineering Excellence
www.lucygroup.com www.lucyelectric.com www.lucyzodion.com www.lucycastings.com www.lucyproperties.co.uk
Lucy Switchgear: Manufacturing unit for Medium Voltage and Ring Main unit, High / Medium Voltage switch disconnections, Low voltage Distribution Cabinets, Cut outs, Energy Services, ABC distribution box, Rapier AX, Rapier DSB, Rapier GX, Isolating links, Dropout fuses, AcuLok MSDB, Distribution cabinet, Aegis Plus, Sabre, Trident
Profile Detail:
oManage PLM – Teamcenter and UG NX Infrastructure within the Organization and Lucy Group
oWork with designers and wider team (Purchase, Supply Chain, Production, Quality) based across the globe (UK, Dubai, India, Thailand) for implementing Change Management, Requirements Management and Teamcenter Reporting and Analytics
oAnalyze PLM business processes, Capture and document business requirements and work with the PLM team
oPerform technical role in development, testing and implementation of configuration changes, software upgrades, patches and bespoke applications. Maintain test environments, test cases and manage UAT
oEstablish Teamcenter Templates, Workflow Processes and Access Controls to meet evolving business requirements. Configure the appearance and behavior of Teamcenter Rich/Thin Client interfaces
oTeamcenter Multisite administration and support for global Lucy sites
oResponsible for user support and work on user issues, helpdesk calls related to Teamcenter and UG NX
oHandle Siemens GTAC account IR/ PR for Lucy Electric and perform technical role in Software Procurement
oWork on Documentation, Help Guide related to Teamcenter and NX user and arrange Training Session
Technical Detail:
oTeamcenter Installation: TC 2 Tier, 4 Tier, Oracle DB installation on Windows and Linux Environment
Teamcenter Multisite Configuration, BMIDE Deployments, Dispatcher Translation Services configuration
oTeamcenter Modules: My Teamcenter, Structure Manager, Workflow Designer, Workflow Viewer,
Access Manager, Organization, CAE Manager, CAE Structure Designer, Import Export Data, PLMXML,
Query Builder, Command separation, Project Manager, Teamcenter Preferences, Style Sheet
oCAD Installation: UG (NX) Installation, TC-NX Integration, Mapping of Attributes in NX and write PAX files
oCAD Design User: Sketch, Modelling, Drafting, Surfacing, Sheet Metal, Flat Pattern, Simulation, Motion
oCAE Tool: Support for CAE Tools, NX Advance Simulation, Flux 2D – 3D Electromagnetic Simulation
Technical Project:
Teamcenter Projects:
Dubai Multisite Consolidation Project
IT group decided to shut down Multisite Services in Lucy Electric Dubai Unit
Performed Task:
oCreate Custom Query to find Remotely owned Item/ DS, Import / Export Query definition for future references
oInstall MSA (Multisite Analysis) Tool and Debug from MSA tools ( IR, DS, and – MMS, NMS, Duplicate Issues)
oCreate scripts to run utilities in sequence for Data Share, Transfer ownership, Delete records
oResolve Issues related to mixed ownership, transfer ownership, duplicate IDs, FSC proxy error,
oRunning Oracle commands to find out all types of conflict data and delete export import records
oShut down Lucy Electric Dubai site permanently and removed multisite services and Teamcenter preferences
oPrepare Detailed document and help doc : Multisite implementation from initial configuration to shut down
Production Workflow Analysis and Implement changes
PLM Team need to document existing workflow process, functionality and unused custom handler task behavior,
Changes in existing workflow process with removing legacy, unwanted handlers and implement new suggestion
Performed Task:
oExamine existing workflow process and review purpose and checks at various level of workflow handlers
oPrepare detailed document on workflow process and include every checks, task and argument behavior
oDocument to remove legacy task and unused arguments, And suggest new checks to improve business process
oMaintenance workflow and include new task to generate PLMXML file to Dev, Eng, Production Released WFs
oTest new workflow process, Demo to design department and GO Live into production server
Teamcenter Security Project – Implement from UK Office
Engineering group need to restrict Teamcenter data access between different departments, group and role based
Performed Task:
oCapture and understand business requirements to data access, restrictions and security base on projects level
oWork on High Level Document, Create Model of TC Security (Based on Projects, Organization, ACL, Preferences)
oDefine related data and Projects in Project Manager Module and defined user groups and roles in Organization
oCreate ACL restriction on data at various level including Workflow and access through rules in Access Manager
oImplement Teamcenter Preferences to configure behavior at various level and organization group and role set
oPerform testing of project at high level and implemented into Production Environment and Support to end user
Teamcenter Upgrade Project – BMIDE and Workflow Template Mapping
Upgrade process Teamcenter 8.3 to Teamcenter 10.1 effect from Sep’ 2015
Performed Task:
oInitiate new TC10.1 BMIDE project and train team mates to BMIDE on Test TC 10.1 environment
oCreate new custom Items, Custom Properties, Add Compound properties, Display Rule, Naming Rule, Create Form, Add Relationship Rule, Deep Copy Rule, Extension Rule, Create LOVs – filter LOV, Cascading LOV, interdependent LOV, Suggestive LOVs, LOVs with condition, Externally managed LOV
oEdit live data, BMIDE deployments on Thin client, Effective preferences for web based changes of BMIDE
oNeed to map Workflow Templates from TC 8.3 to TC 10.1
oGather requirements to create new workflow handlers and implement on TC 10.1 test environment and testing
oEnsure custom handler and arguments working on upgrade system, Export workflow definition in XML format
Lucy Electric, Thailand FSC Server Configuration
Need to configure Teamcenter FSC Server in Thailand to support approx. 20 local users
Performed Task:
oConfigure of Teamcenter FSC server and UG NX Custom Files on local Thailand Server
oConfiguration of Master and Slave FSC Server to communicate between central and local FSC server
Teamcenter Translation Services Configuration
Design User need to generate PDF and CGM data and store with UGPART dataset in Teamcenter
Performed Task:
oImplement Teamcenter Dispatcher Translation Services to generate PDF and CGM (Common Graphics Meta)
oRun Dispatcher, Modular and Schedule services to invoke customize tool through Translation Process
Teamcenter – NX Integration Project: – Implement from UK Office
Teamcenter – NX Attributes mapping and update Drawing Border Template
Design users require implement new TC attributes in NX and also map the same with Drawing Border Templates
Performed Task:
oGather Business Requirements from Global Design Team to enhance experience in NX
oPerform technical implementation and testing on Teamcenter Test Server
oUse NX attribute mapping file and add BMIDE custom attributes Run Utilities and modify PAX files
oFinalize the changes with design team and confirm sign off, Deployed on production server
oTraining design user on new enhancements and ensure frequent use, Prepare Support Documents
CAD (UG – NX) Design User and Teamcenter Integration
oInstall CAD Tool UG (NX), TC Visualization and configure user profile, map to custom NX library
oAdd - import assembly/ components from native NX to Teamcenter and assigned Item ID
oCreate UGMASTER, UGPART, JT, CGM, DXF files for Teamcenter
oSiemens certified advance level UG-NX user
oWorked on Sketching, Modeling, Extrude, Revolve, Pattern feature, Mirror body, Unite, subtract, Join face, Trim Body, Split Body, Extend, Divide face, Thicken, Offset, Edge Blend, Chamfer, Sew, Datum Plane
oAdd Assembly, Constraints, Mirror Assembly, Drafting, Drawing, Dimension, Annotation
oDesign Sheet Metal, Flange, Contour flange, Lofted Flange, Bend, Jog, Corner, Dimple, Louver, Cutout, Bead, Solid Punch, Gusset, Bend Taper, Resize, Re Bend, Edge RIP, Flat solid, Flat Pattern
oSurfacing, Move, Face, Offset, Region, Curve, Join, Mirror, Intersect, Rapid surfacing, Mesh surfacing
Company Name - SIEMENS PLM Software, Pune
Duration - Dec’2010 to Jan’2015
Designation - Project Test Engineer Associate
Client - Daimler, Ford Motors
Technical Detail:
PLM – Teamcenter Administration
oWorking experience on Teamcenter2007, Teamcenter8.3, Teamcnetr9.1, Teamcenter10.1
oInteraction with Customer for business requirement study and clarifications on Technical Documents
oPerform Organization Administration, Groups and Roles Management, Site Management
oWork on Structure Manager, CAD Assembly, BOM Structure, Create Revision Rules, Create Variant Rules
oCreation of Workflow Process and Handlers, Creation of Access Manager Rules, ACL Rule Tree management
oWork on PLM XML, TCXML Import/Export methods and transfer mode to share Teamcenter Data
oWork on Query Builder Module to perform custom search into TC Database, Import/Export Query Definition
oWorking experience on Project Module to add Users, Projects Admin and apply Access Rules on Project Data
oCAE Data management configuration, CAE Packages, Structure Map, Simulation Tool, Batch Meshing
oWork on Style Sheets project and configure Teamcenter and populate attributes as per requirements
PLM – Teamcenter Implementation
oInstall Teamcenter 2 Tier, 4 Tier and configure FSC Server as per customer environment and monitor services
oInstall CAD Tool UG(NX) and integration with Teamcenter and deploy Attribute mapping and templates
oInstallation standalone and embedded Teamcenter Visualization as per requirement
oConfigure Teamcenter Multisite environment and Running utilities for Data Management
oCreate BMIDE Projects and BMIDE Template deployments – Hot Deployment, Cold Deployment
oInstallation and configuration of Teamcenter Dispatcher Services on Windows and Linux
oInstall/Update Oracle DB for Teamcenter and Run Oracle commands to access TC Data
Project Detail:
Project: CAE Variant Management (Release: TC10.1.2)
Description: During the virtual validation of a vehicle, Analysts may create different simulation variants. The analyst will leverage rule sets and apply them to master or template studies to create a specific simulation variant.
Responsibilities:
oWork with customer team to understand the architecture level aspects of new functionalities
oConfigure Teamcenter environment with enabled new enhancements as per the specifications
oCustomize Teamcenter Data Model and create new rules and Items in BMIDE and deploy
oPrepare Use case and effective scenario and perform testing share results with client team
oCommunicate with end user and troubleshooting issues related to functionalities, Eng. Queries. Create help Doc
Project: Simulation Tool Launch Enhancements for HPC Support (Release: TC10.1.0.1)
Description: Teamcenter for Simulation tool launch capability that supports customer configuration of any number of simulation tools that may be organized into customer defined categories. It is highly desirable for the user to launch the simulation tool on the Teamcenter server, rather than on their client machine.
Responsibilities:
oIntegrate Teamcenter with CAE Solver Tool (NxNastran, Femap) with enabling Translation Services
oConfiguration of Dispatcher communication between Windows and Linux platform to run tool on Linux setup
oCommunicate with end user to troubleshooting issues related to functionalities and Eng. queries
oPrepare customer help document and training material
Project: Teamcenter with Multi Field Key Support (Release: TC9.1)
Description: Teamcenter business objects are identified by a single unique attribute, ID. This project will address the extension of multi-field keys in Teamcenter client side functions.
Responsibilities:
oReview and Study SRS and FS document for enhancements in Teamcenter
oCustomize Teamcenter Data Model and create new rules and Items as per customer using BMIDE
oWork on issues, bugs and configuration environment
Project: Teamcenter NX Check Mate (Release: TC9.1)
Description: TC- NX Check mate project is based on low and medium priority changes and modification in existing PLM system, Business document is based on meeting held with department heads and design users
Responsibilities:
oReview and Study business document, Check for feasibility and prepare implementation document
oChanges in Data Model and implement new LOV’s, naming pattern and new attributes in Teamcenter
oAdd new time - date stamp, ECN number, Engineering Change Criticality, Design Authority, Priority Attributes
Project: Teamcenter Thin Client Customization (Release: TC8.3)
Description: Customization project related to cosmic changes into Teamcenter Thin Client interface
Responsibilities:
oStudy project document and identify required changes and effectivity on Thin Client Interface
oConfigure and implement changes on Teamcenter Server and analyze preferences for Thin Client
oModify Teamcenter Preferences and effectivity on Thin Client Teamcenter view
oPerform testing as per use cases and demonstrate to Client team and sign off project to GO Live
Project: Teamcenter Oracle DB patch upgrade (Release: TC8.3)
Responsibilities:
oShut down services for Teamcenter, NX and Ansys Software
oImplement latest patch to Oracle and restarted services on server
oPerform testing: Login TC, start NX from TC, perform search item id, navigate BOM structure, Load item into NX, Perform save as to new item id, Revise new number, login TC Thin client
Project: New Teamcenter Licenses Configuration (Release: TC8.3)
Description: Client configure new Teamcenter License Server with running LMD tool and services
Responsibilities:
oInstall Teamcenter license file on server and configured LMD tool with license files
oCreate schedule task to keep track on Teamcenter license server and write log files for usage
oMap users to new license server and ensure configuration on port @ 28000
Company Name - MPHASIS (An HP Company)
Duration - Oct’2009 to Dec’ 2010
Designation - Development Trainee Software Engineer
Client - General Motors - Global Product Development
Technical Detail:
Teamcenter Application Support Engineer
oProvide Global Support to General Motors on TcAE (Teamcenter Engineering)
oTeamcenter Functionality issues like Login Issue, User Profile Issue, FCC Issue, Delete Request, Un Release, Release, Check In, Check Out, TC Data Access and TCAE Sync of Data between TCAE & UG (NX) Integration
oPerforming User Administration, Groups and Roles Management
oIssue handled on Multisite, Run utilities like Data Share, Export Recovery, Remote Import, Data Management
oResolving issues in Teamcenter like mixed ownership, Import / Export, Publish /UN Publish, Replica Deletion etc.
Responsibilities:
oTroubleshooting user problems and resolve issues related to General Motors Design Group and General Users
oCommunication with customer by Calls and Net Meetings and provide solutions their Engineering queries
oWork on Ticket and incident log by user and provide update status on issue
oPrepare documentation related to user technical issues, Prepare reports and knowledge material
Company Name - AKSH OPTIFIBRE LIMITED (PLANT III)
Duration - Nov’2008 to Oct’2009
Designation - Process Member MFG
Products - FRP, ARP Rods & Optical Fiber Cable
Responsibilities:
oEnsure that Product is fit to use
oDoing R&D for New Product & Raw Material scope
oStudy and prepare cost reduce Reports for Raw Material and Packing
oImplement System And 5 WHY Analysis, Knowledge of Lean Mfg. Concepts and Kaizen Effects
PROFESSIONAL QUALIFICATION
2004-08, Bachelor of Engineering [Electronics & Communication]
MAIET, Jaipur [University of Rajasthan, Jaipur]
PERSONAL INFORMATION
Date of Birth - 26th October 1985
Permanent Address - 7-E, Rathore Marg, Vivekanand Colony, Nayakhera, Ambabari, Jaipur-302039, Raj, India
Corresponding Address - B/298, Siddarth Banglows, Sama Savali Road, Vadodara - 390008, Gujrat, India