Larry P. Baum
**** *** ***. **. 205-***-**** Home
Irondale AL 35210 205-***-**** Mobile
Background Summary
Experienced and successful engineering/construction/scheduling manager with
direct responsibility of complex projects from inception through execution.
A determined hands-on leader and strategic planner with the proven ability
to conceptualize develop and implement project solutions. An energetic,
results-oriented manager with excellent strategic/system planning, channel
development, communication, problem solving, and organizational skills,
leads teams to consistently achieve targeted objectives and maintain a
strong customer focus.
Professional Experience
SOUTHERN COMPANY SERVICES Birmingham, AL
Piping Coordinator, Scheduling Manager, PSM Facilitator 2/2012 to
4/2015
Kemper County IGCC Project
Coordinated and scheduled pipe fabrication activities to support
construction. Managed a diverse scheduling team, which provided detailed
Engineering, Procurement, Construction and Start-up Activity Schedule.
Worked with Southern Company Services Engineering and Procurement, Area
Managers, Contractors and related personnel for required updates to provide
Site Management the detail they needed to manage the overall project.
Currently, facilitating the collection, and review of PSM (Process Safety
Management) documentation from fabricators and installers which will become
an integral portion of the Kemper County Mechanical Integrity program.
ALSTOM
Richmond, VA
Worldwide leader in Turbine Design and Installation. Installation includes
new builds and retrofits in the power (fossil, hydro and nuclear) industry.
Installation Planner
10/2010 to 1/2012
Representative Projects:
Surry Nuclear Power Station Unit 2 Outage - Surry, VA
DC Cook Nuclear Power Unit 1 Outage - Bridgman, MI
Provided Scheduling and Work Instruction Planning for major Turbine
Retrofits during the Outages referenced above. Also, provide Pre-Planning
Scheduling for other Projects as necessary
Larry P. Baum
Page 2
PIC Group, Inc. Subsidiary of the Marubeni Group
Marietta, GA
A boiler/steam turbine repair company who performs field work for major
electrical providers in the Americas and Caribbean. Parent Company,
Marubeni, is a world-wide diversified corporation with over $5 billion
dollars of sales.
Project Manager/Scheduler
9/2009 to 6/2010
Representative Projects:
Mirant Morgantown 2010 Unit 2 Outage - Morgantown, MD
AEP Flint Creek 2009 Fall Unit 1 Outage - Gentry, AR
Turbine Overhaul, Water Wall, Superheat Replacement, Reheat Pendants, Coal
Feeders, Air Heaters and other associated plant equipment. Both outages
were completed ahead of schedule. Specific duties were; P6 schedule
development and reporting, project coordination and liaison with the
client.
. Mirant - Instrumental in the development of a master outage schedule for
both operating units. This streamlining of the planning process allows
the owner to devote more time in the evaluation of outage cost and scope.
Plant Performance Services Subsidiary of Fluor
Baton Rouge, LA
A full service construction company that executes capital and turnaround
work along the gulf coast for; the chemical, oil and gas, government and
power sectors.
Scheduler/Project Manager/Area Manager
2/2008 to 8/2009
Developed detailed fabrication schedules for nine refinery heaters for
Marathon Garyville major expansion project. This work was done in
conjunction with the heater supplier,
On-Quest and was performed at fabrication facilities in Mexico. Was
assigned as Scheduler, Material Manager and Area Manager over the
installation of five refinery heaters at the Marathon major expansion site
in Garyville, LA.
Fluor Enterprises, Inc.
Greenville, SC
A full service Engineering, Procurement, Construction Company, with
expertise in the industrial sector; concentrating in the oil and gas,
government, chemicals, power, pharmaceutical, mining and infrastructure
markets both domestically and abroad. Current contract backlog for 2010 is
$27 billion dollars.
Larry P. Baum
Page 3
Project Manager
3/2006 to 2/2008
Provided detailed proposal estimates and schedules for major environmental
retrofit projects for Progress Energy and Southern Company.
Assigned as Project/Site Manager for Texas Utilities Sandow 4 Environmental
Retrofit Program. Work consisted of an SCR Installation with new ID Fans,
water cannons, intelligent soot-blowing and additional boiler upgrades.
. During project negotiations and review; was able to earn the respect of
the client's upper management by being straightforward and self-
confident.
. Meetings and decisions were in a Kaizen environment; at the plant and
corporate level.
The Saxon Group, Inc.
Sugar Hill, GA
WBE Construction Company that; performs mechanical work on industrial
projects in the Southeastern United States. Saxon Group is considered a
small disadvantaged company with annual contracts of less than $25 million.
Project Manager
6/2005 to 3/2006
Provided complete site responsibility, on a mechanical expansion of an
existing gas producing plant, located at the Air Products facility in
Baytown, TX.
. Worked in an active Kaizen environment; mentored construction supervision
on the process, which enhanced communications with plant and Air Products
Corporate staff.
CB & A Project Management Services
Birmingham, AL
CB&A is a project management and consulting firm that was formed by me and
three of my former colleagues from Raytheon. Provided industrial clients
with project management services on an as needed basis. CB&A is a small
private enterprise with billings of less than $5 million dollars a year.
Owner/ Project Manager
2/1996 to 6/2005
. Achieved profitability within nine months of company start.
. Reduced advertising costs by 75%, promoted repeat business with clients.
Representative Projects:
Holcim Cement Midlothian, TX, - Provided project management for two Flue
Gas Desulphurization Scrubbers on existing and new cement facilities.
CIBA Specialty Chemical Plant West Memphis, AR, - Provided project
management and
Larry P. Baum
Page 4
Start- up coordination for a new plant which manufactures water treatment
chemicals.
BP Amoco Chemicals, Decatur AL - Provided pre-outage/outage planning and
project management services, for replacement of PTA Dryer Systems on two
operating units.
. Worked with team members to outline, develop and implement an improvement
process on execution of work that produced a savings of 125K in direct
project execution costs.
Southern Company Services Birmingham AL, - Provided project management and
subcontract development services on existing coal fired power plants during
their environmental program.
. Provided insight and detailed analysis on outage schedules that provided
a four day improvement to the baseline; allowed the facility to start-up
four days earlier than scheduled; that resulted in improved generation
billings by $4,000,000.
Merck & Company Albany GA - Provided project management, subcontractor and
material management services for Clean Room Modifications and
Process/Chemical Sewer Upgrades. Majority of the work was executed on an
outage basis in a pure room environment.
Raytheon Engineering and Constructors, Inc.
Birmingham, AL
Raytheon purchased Rust Engineering in 1996 from Rust's owner Waste
Management. Raytheon and Rust provided full service Engineering,
Procurement and Construction, with expertise in the industrial sector;
concentrating in the pulp and paper, government, chemicals, power and steel
markets primarily in the United States. Currently Raytheon does not support
full service EPC work except in the defense area.
Materials Manager
2/1994 to 2/1996
Developed procurement coordination plans, provided expediting for
vendor/supplier deliverables, vendor/supplier coordination, delivery
coordination, purchase order and change order negotiations, coordination of
QA/QC shop inspections and development of startup programs.
Representative Projects:
Blue Water Fiber- Port Huron MI
Vista Chemical Company Aberdeen MS
Mead Corporation Stevenson, AL
Olin Corporation McIntosh, AL
Rust Construction Services Division
4/1989 to 2/1994
Chief Construction Engineer
Monitored all related field engineering, constructability, scheduling,
procurement activities,
Larry P. Baum
Page 5
Sub-contract development and coordination, shutdown coordination, material
control and start up for pulp and paper and other industrial facilities.
Rust was consistently rated in the top ten of Engineering and Construction
companies worldwide with billings of over $1 billion dollars.
Representative Projects:
St Joe Forest Products Port St. Joe, FL
Great Northern Nekoosa Clyatville, GA
Naheola Recovery and Power Facility Pennington, AL
. Spearheaded an initiative to develop a field purchasing database system
that would track field purchased items, receiving/warehousing and
accounts payables. System provided instant cost information, reduced
errors, improved productivity and produced savings of 5% on invoiced
materials.
. Organized functional managers to discuss the merits of placing an active
3-D design model on the project site. System immediately improved
communications across all trade boundaries. Minimized field work due to
interferences issues. System produced savings of 5% in installation
costs.
Weyerhaeuser Consumer Products Columbus, MS
Riverwood International Macon, GA
Blount International
Montgomery, AL
Blount provided full service Engineering, Procurement and Construction,
with expertise in the industrial sector; concentrating in the pulp and
paper, government, and power. Blount exited the construction business in
1993 and turned its focus exclusively on manufacturing. During the late
eighties Blount consistently had billings over $250 million dollars.
Project Engineer
11/1986 to 4/1989
Manager of Engineering responsible for subcontracts and permit
coordination, A-E coordination, quantity estimates and trending,
scheduling, material control and site liaison with regulatory agencies for
a Waste-to-Energy facility.
. Contaminated materials (soil and water) were encountered during
construction of a power facility. Designed, secured approval from the
environmental agencies, and implemented a process to treat the
contaminated materials on-site. Ultimate benefit was removing the
responsibility (due to RCRA standards) of the contaminated materials at
an off-site landfill or treatment facility. This ultimately saved future
litigation costs related to these contaminated materials.
A.E. Staley Company
Decatur, IL
A.E. Staley is a producer of agriculturally based products including corn
starches, corn oil, high fructose corn syrup and ethanol. Staley was
acquired by Tate & Lyle in 1988 and currently have sales worldwide of over
$6 billion dollars.
Larry P. Baum
Page 6
Project Manager/ Engineer
1980 to 1986
Responsible for overseeing new construction, expansions and upgrades at
various site locations related to corn wet milling. Responsibilities
included involvement in the civil and mechanical aspects of these projects,
with emphasis on equipment and food grade piping.
Representative Projects:
Corn Syrup Plant Upgrade Lafayette, IN
. Re-engineered, planned and implemented plant modifications (tie-ins) at
this facility that were accomplished in one day, saving any subsequent
downtime to the existing facility (plant produced $1,000,000 of sellable
product/day)
Corn Syrup Plant Upgrade Morrisville PA
New Corn Syrup/Ethanol Facility Loudon TN
. Proposed an alternate design for pipe support materials which saved
$250K.
. Planned and managed: boiler repair, evaporator equipment repairs and
major water piping modifications. All work was fast tracked in the
operating facility. Strategies implemented during the execution of
aforementioned projects saved the facility $5,000,000 in lost operations.
Education
University of Dayton- Dayton, OH BS-
Civil Engineering