Ph.D. Student in Applied Math (GPA *.*)
XIAO WANG
Dec. 2014
Direct Numerical Simulation Center of the UT
Arlington, Arlington, TX
Address: *** ******* *** *** ** Master (and Bachelor) of Civil
Arlington, TX 76010
Engineering (GPA 3.7)
Phone: 682-***-****
May 2008
Email: ****.****@****.***.***
www.linkedin.com/in/xiaowang2014/ Wind Engineering Center of Hunan University,
Hunan, China
RESEARCH AND WORKING
SUMMARY
EXPERIENCE
Blends mathematical skills and engineering
application with data subtracting, processing,
Research Projects
analyzing experience. Also known for problem
solving, job organizing, team working and quick
learning abilities. Used Elliptic Grid Generation theory to
•
generate 3D grids data set for supersonic
QUALIFICATIONS flow field with Micro Ramp Vortex
Generator (MVG). Adapted old programs for
• Training in Mathematical Abstraction
the new case.
and Derivation, Analytical Thinking,
Employed Linux/Unix system and remote
Mathematical Modeling, Simulation and •
High Performance Computer for several
problem solving skills.
cases' computation. Responsible for remote
• Proficiency in Fortran/Matlab, familiar
task submission, maintenance and data
with Unix/Linux and shell scripting, Hands
transmission, collection as well as analysis.
on experience in Parallel Computing,
Learned Linux shell scripting to deal with
Mathematica and SAS.
large sized data.
• Skilled in Tecplot, Gridgen,
Applied Tecplot and made movies to
•
ANSYS(APDL), AutoCAD(customization),
visualize MVG flow topology, discovered
LaTex, etc. Ability to process, analyze and
detailed mechanism of flow around and after
visualize computational data.
MVG and ramp.
• Engineering knowledge and background
Used Fourier Transformation on Navier
•
with extensive experimental, design and
Stokes Equations to analyze the stability of
project management experience.
Compressible Viscous Supersonic Boundary
• Established ability to work independently Layer flow with Fortran.
or to communicate and cooperate with team.
Five publications. Teaching assistant for
•
Good written and verbal skills.
6 courses and teacher of 3.
EDUCATION Widely chosen courses like ODE, PDE,
•
CFD, Numerical Analysis, FEM, Statistical
Analysis, Math Finances, etc.
Structure Designer, Representing Engineer
Experimental projects and management
•
experiences, responsible for planning, on site
preparation, operation, data collection, data
Sep. 2004
processing and final reports.
Tai’an City Construction Survey & Design
Wind tunnel working experience.
•
Institute, Shandong, China.
Modeling and Simulation experience with
Independent designer of four roads and
commercial codes. •
two bridges.
Non linear spatial cable positioning
•
Responsible for communication with
problem modeling and regression analysis •
project owner and construction companies,
with Fortran & Matlab.
negotiating on design alterations, and
Intern Data Analyst handling unexpected events on the
construction site of Panhe Bridge project.
May 2014
SELECTED HONORS AND
Innobeee tech. Inc, Cupertino, CA
PUBLICATIONS
Learned and used regression and
•
predictive modeling, Fast Fourier STEM and EGTA stipend for Ph.D
•
Transformation, interpolation and students (USA); National Scholarship for
extrapolation methods to deal with collected Graduate Student (China).
data.
Dissertation: High Order LES for
•
Performed data obtaining, cleaning and Supersonic Ramp Flow Control and Stability
•
preparing. Read and made changes to With MVG.
original Fortran, VB and Matlab programs
Publication: Xiao Wang, C Liu, Y Yan:
•
for several cases.
LES Investigation of the Generation of
Experienced in data summarization, data Momentum Deficit in the Supersonic Wake
•
modeling and graphical reporting. from a Micro Ramp. JMST. d
Responsible for the program instruction, 10.1007/s12206 013 1164 x
communication with customers and final
Publication: Xiao Wang, Y Yan, C Liu:
•
report.
The Vortical Structures in the Rear
Intern Structure Design Separation and Wake Produced by a
Supersonic Micro Ramp. Flow, Turbulence
and Combustion. doi: 10.1007/s10494 014
Summer 2006 & 2007
9531 y
Hunan Provincial Communications Planning
Member of AIAA, SIAM, AMS. Speaker
•
Survey & Design Institute, Hunan, China.
of AIAA 51st conference.
Co designer of Tunnel Anchorage of
•
Teaching experience of College Algebra,
•
Aizhai Great Bridge(main span 3,760 ft) and
Trigonometry, Calculus I, II, III and
E’lipo Bridge.
Statistics.
Responsible for FEM modeling with
•
Organizer and host of two major events
•
ANSYS and Bridge Doctor for stability
of UTA Chinese Student Association.
calculation and stress analysis, then the
generation of detailed construction
document design using AutoCAD.