Rameses Sorrell, *** N. Genesee Ave. Los Angeles, CA, 90036, 323-907-
****, ******@*****.***
Jah Jah Productions- Los Angeles
September 2005 - Present
Project Manager/Project Coordination/Transportation/Design/Build/BIM/CAD
Drawing Coordination
Client: Kroger for LazerCAD
December 2014 - Present
. Building survey assessments of mechanical structures and
equipment
. Duties: Made physical survey assessments of building elements
including placement of structural elements such as columns, beams,
joists, decks, racks, and mechanical equipment
Client: O'Reilly's Auto Parts for The Trinity Group
June 2012 - December 2013
. Building survey assessments of mechanical structures and equipment
. Duties: Made physical survey assessments of building elements
including placement of structural elements such as columns, beams,
joists, decks, and mechanical equipment
Client: Mona Metwalli for Thomas Halstead Interiors
December 2012 - February 2013
Site survey, as built and remodel
. Recently completed site survey for high-end condominium in
Beverly Hills
. Created new As-builts of existing floor design then created new
construction document sets including electrical layout for newly
remodeled condominium designs
. Use AutoCAD for 2D drawing creation
Client: Ray E. Brown AIA & Associates
January 2006 - December 2011
BIM/CAD Manager/Drawing Set Coordination/Structural Details/ Hospital
Remodel
Architect Assistant /Surveys Work/Field Measurements/Fixtures
. With Ray E. Brown we surveyed the site and produced a
completely new set of accurate as-built drawings
. Ensured no error when the time came for construction of the
project
. Completed project turned out so good we were asked to upgrade
the existing area to new remodel standards
Client: Guller Padilla Designs
June 2006 -
September 2006
BIM 3D Renderings/CAD Management/Low Income Housing Resolution
. Commissioned me to produce and manage a full set of BIM 3D
Design layouts and drawings
. BIM 3D Computer generated renderings were produced to convey the ideas
for a new housing project in Palm Springs
. Based on steel containers this series of designs will
revolutionize the low income housing development dilemma
. Responsible for supervision and delegation of work to other
drafters on team
Wyzant Tutoring Services
December 2012 - 2015
Tutoring services in AutoCAD and Revit
. Assisted several Engineering and Design students at USC, UCLA, CSUN,
etc. with the completion of BIM related AutoCAD and Revit assignments
. Use Revit and AutoCAD to create complex 3D building geometries
. Proficient with Revit and AutoCAD
. Proficient with Auto CAD
. Experience in 3D design
Contract Work
Client: Disney Imagineering for Cunningham Group(Contract)
January 2012 -March 2012
MEP CAD Architect
. Budget: $1,000,000,000
. Hired as contractor on the Paradise Cove/Treasure Island team to
produce construction document sets and structural details using BIM
AutoCAD software for Pirates of the Caribbean area ride and
surrounding facilities
Client: Chipman Adams Pacific- Pasadena (Contract)
September 2006- December 2006
Tenant Improvement/Architect Assistant
. Junior Associate/CAD Work/Retail/Fixtures Projects- Ulta Hair Salons-
Meza, AZ, Phoenix, AZ, etc.
. Sketchers Retail Shoe Stores- Florida Tenant Improvement, Model Store
Roll-Outs, Fixtures
-Helped minimal staff produce and complete Construction
Documents sets for the Ulta Hair Salons and Sketchers Retail
shoe stores in Florida
. These documents sets included Tenant Improvement Floor Plans, Finish
Plans, Reflected Ceiling Plans, Lighting Layouts, Fixture Plans and
Furniture Plans, Interior Elevations, and Exterior Elevations for
stores in Mesa, AZ, Phoenix, AZ, etc.
Client: Nadel Architects, Los Angeles, CA (Contract)
July 2005-September 2005
Retail Site Planning/Civil/ AutoCAD Draftsperson
. Projects- Apple Valley, Hesperia, Perris, etc.,
. Tenants- Target, Wal-Mart, Lowes, Home Depot, Kohl's, Bank of America
. Produced site plans for large 1,000, 000+ S.F. Retail shopping centers
which included parking facilities
. Working from satellite images and CAD generated Civil drawings
. Produced multiple preliminary site plans
. Compiling data analyses for planning and completion of accurate
drawings after initial design
. Ensuring proper presentation of site layout according to civil
calculations
. Designs are based on tenant/ developer negotiations, translated to me
and then put into CAD drawings
Client: Lee+Burkhart+Liu Architecture/Planning/Interiors (Contract)
April 2005 - June 2005
Award Winning Project/Hospital Master Planner Assistant/Structural/AutoCAD
Draftsperson
. Projects- Santa Barbara Cottage Hospital, 2000+ Sheet Drawing Set
Coordination/Structural Details, $100,000,000+ Budget, architects of
the new LAC+USC hospital, Produced Construction Documents and
structural details
. I worked closely with the Master Planner producing custom structural
details for steel wall interfaces; assisted with the conception of
ideas into reality for the remodel of the Santa Barbara Cottage
Hospital; meeting the goals of easy patient care & OSHPD guidelines
. The SBCH is an award winning project
Architects: Wolcott Architecture Interiors (Contract)
December 2004 - March 2005
Projects: THQ/Trammel Crow/Larry Flynt
. Created full construction document sets which included floor, lighting
and fixture plans
. Drawing sets included reflected ceiling plans for placement of lights
. Signage, emergency lighting, etc.
. Created construction documents detailing cloud duct systems that would
be used in the corporate office remodel of THQ
. Also produced numerous construction document sets showing locations of
power, thermostat, light controls and telephone connections within the
many tenant improvement projects
. Worked from Engineer's markups and sketches under minimum
supervision
. Learned new programs as required by individual projects
JAH JAH PRODUCTIONS MEP Project List
Hospital Projects
Architects: Ray E. Brown & Associates
January 2006 - January 2009
Project: Huntington Hospital
. Worked on several different projects with Huntington Hospital
. Produced several drawing sets which included work on MEP facilities of
the hospital
. Work often included creating generator layouts, plumbing line systems,
details for anchoring of equipment, etc.
Architects: Lee Burkhart Liu
April 2005
- June 2005
Project: Santa Barbara Cottage Hospital
Budget: $300,000,000+
Sheet Set Size: 2000+
. Responsible for drawing set coordination
. Responsible for putting together and coordinating the many floor
plans, interior elevations, sections, etc. for this multi-level,
phased construction project
. Duties included working with the Master Planner to meet OSHPD approval
comments (Drawings were approved)
. Ensured outputs met the required standards and agreed deadlines
. Created Structural details for steel frame construction staircases,
handrails, pneumatic message system, walls, etc.
. Also coordinated and designed Interior Design layouts for nurse
stations, Critical Care areas, Surgery areas, Post-Partum, etc.
. Worked on the design and floor plan arrangement of Physicians area,
Exam rooms, Pharmacy, Patient Recovery areas, Patient Pavilion,
Admitting, Radiology, and multiple work rooms
. Responsible for drawing the heli-pad on the roof top area of the multi-
level hospital
. Created details of steel framed wall types, doors types etc. in the
drawing that represented the proper rating for these elements
according to OSHPD regulations
. Also input information about most advanced medical equipment, beds,
medical devices, lighting and instruments that would be first used in
this award winning hospital to create both a patient and doctor
friendly hospital that services the entire community
Entertainment/Tenant Improvement
Architects: Ray E. Brown & Associates
January 2006 - January 2012
Project: Inglewood Unified School District Adult School
. Worked on the revamping of the Inglewood Unified School District Adult
School
. This project required MEP consultant usage of AutoCAD files which I
prepared and often translated for clients use
. Worked with consultants to create HVAC layouts for projects
. Took responsibility for own work produced to a high standard.
. We created a new plan which includes school district administrative
offices, a beautician school with custom work stations, furniture
fixtures and amenities, lawyer's office, and computer center
. We produced several construction document drawing sets which included
placement of duct systems and multi-ton roof top air conditioning
units
. Developed lighting and electrical scheme that would serve the three
story educational facility
. Drawing sets included reflected ceiling plans for placement of lights
. Signage, emergency lighting, etc.
. Set up power and track layout for hairdresser units on first floor
. Created details for stud wall systems that would be used in the new
construction of the building
Architects: Ray E. Brown & Associates:
January 2009 - January2011
Project: SCE
. Created multiple details for generator units and anchoring systems for
several residential homes and facilities within the Southern
California and Arizona areas
. Use AutoCAD for 2D drawing creation
Architects: Lexington, USA
June 2007 - September 2007
Projects: Ferrari Land theme park in Abu Dhabi, United Emirates.
. Lexington was responsible for creating and designing three Ferrari
Theme park rides for the park which included trams, special effects,
visual amenities and custom props. I was
. Responsible for implementing the scene by scene transitions of the
ride into an information matrix. From this information matrix we were
able to give the conceptual ideas developed by designers a formal
structure. This enabled the ability for us to create construction
documents.
. Formal structure of information documentation lead to the further
development of ride scenes
. Conveyed a better understanding of the stage by stage transitions
through which the ride progressed
. Information matrix structure also allowed for the ride to be
constructed accurately according to designer plans and concepts by
overseas contractors in the field
Education
Santa Monica College, Santa Monica, CA
June 1994 - June 1997
Program: Associate of Arts Degree
. Concentration : Architecture
. Awards: Selected by School of Art and Design to display design
. Recipient: Alpha Gamma Sigma Honor Society, Certificate of Merit
. Certificate of Achievement in Mathematics
. Certificate of Outstanding Academic Achievement 3.49 GPA
. Certificate of Appreciation for completing transfer requisites
. Recipient: Black Collegians Academic Award
. Recipient: Wilson Brothers Building Award
University of Southern California, Los Angeles, CA
September 1997 - December 2000
Program: Bachelor of Arts Degree
. Concentration : Architecture/Religion
. Acquired Architectural and Graphic Design skills
. Including the use of Adobe Photoshop, Illustrator, AutoCAD, Form Z,
and other computer art working programs.
California Polytechnic State University, Pomona, Pomona, CA
September 2001 - October 2003
Program: March1
. Acquired Environmental Design, Graphics skills, and website
design
. Including the use of Adobe Photoshop, Illustrator, AutoCAD, Form Z,
and other computer art working programs.
. Completed case studies for Claremont Colleges proposed new
dormitories,
. Case Studies; Louis Kahn Erdman Hall, Hakuei Residence, etc.,
Mt. San Antonio College, Walnut, CA
September 2004 - June 2009
Program: 3D BIM Illustration
. 3D Modeling/Illustration, Civil Engineering Tech Courses,
. Actively involved in Graphic Design and 3D BIM Computer rendering
courses at the college
. Including the use of Adobe Photoshop, AutoCAD, Viz, Revit and other
computer art working programs.
East Los Angeles College, Monterey Park, CA
February 2011 - December 2011
Program: BIM/Revit
. 3D BIM Modeling/Illustration
. Acquired 3D Building Information Modeling skills
. Including the use of Revit computer Modeling programs and 4D
application of software.