Sreenivasan K
Mumbai, India
**************@*****.***
PERSONAL PROFILE
02nd April 1981
Date of Birth :
Nationality : Indian
Proposed Position : Site QC Engineer
Total Experience : 11+ Years
Joining Time : 30 Days
Marital Status : Single
Languages’ Known : English, Hindi, Tamil and Malayalam
Passport No./Expiry Date : L3787307 / 12.09.2023
Permanent Address : MIG 35, Housing Board Unit,
Anna Nagar, Cuddalore-607 001
Tamil Nadu, India
EDUCATIONAL QUALIFICATIONS
Diploma in Mechanical Engineering with First Class from SNGPC Tech Institute, Coimbatore, India.
Post Graduate Diploma in Piping Engineering from Suvidhya Institute of Technology, Mumbai
SKILLS/CERTIFICATIONS:
Proficient in Industrial Strainers/valves
Proficient in Reading Drawings of Piping Layout, Equipment Layout, Foundation Layout, P&ID, Vessel,
Valves, Strainers, Rotary Equipment, Precision Components
Cad Software: AutoCAD
Proficient in MS Word, Excel
ASNT Level- II certification in “Radiography Testing”
ASNT Level- II certification in “DP, MPI and UT”
Lean Six Sigma ( Green Belt )
Proficiency In
Preparation of bulk material take off, plot plans, site layout, piping Isometrics and checking of Piping &
Instrumentation Diagrams.
Well conversant with welding processes of SMAW, GTAW, GMAW, FCAW and SAW
Preparation of Strainer and valve data sheets.
Preparation of pipe support general arrangement, pipe support schedule and piping line lists
Pipe support span calculation
Design of Pipe Racks
Reinforcement pad and miter bend calculation
Inspecting the piping material for oil and gas field, compliance to NACE MR 01 75.
Material identification of various materials like ASTM A106 Gr B, A333 Gr 6, A105N, A516 Gr60/70, A234
WPB, A216 WCB/WCC, A193, A194, A312 TP316/L, 304/L, A182 F316, A351 CF8M, A240 and AISI 316,
AISI 4140, AISI 4130, viton, RPTFE, spring Inconel X750, API 5L etc.,
Vendor inspection were carried out for the CS, SS Pipes, Plates, Valves, Flanges and Fittings
Conversant with various industry codes such as ASME SEC IX, AWS D 1.1, API 650, API 1104, ASME B
31.1, ASME B 31.3, NACE MR 01 75, ASME Sec VIII Div-1
May 2015 Page 1 of 4
Sreenivasan K
Mumbai, India
**************@*****.***
EMPLOYMENT HISTORY
INDIA
SL No Period Company Position
1. Nov 2012 to Till Date Procedyne Engineers Site QC Engineer
2. Dec 2009 to Oct 2012 CCPIL, Mumbai Site QC Engineer
3. Sep 2006 to Nov 2009 GESCO, Chennai Quality Control Engineer
4. May 2004 to Aug 2006 Bakkiyam Industries, Coimbatore Quality Control Engineer
SUMMARY OF EXPERIENCE
With more than 11 years of industry experience in the area of Quality assurance, Quality Control, NDT
witness, materials procurement, Piping design, piping site verification, erection, installation, commissioning
and on site trouble shooting.
Actively involved and executed various projects by coordinating with the site management and managing
various third party sub-contractors. Explicit effective written and communication skills with good amount of
site experience, piping design experience, interpreting industry recognized standards and have hands on
experience in software tools like AutoCAD, Pro-E and MS office tools.
EXPERIENCE GAINED AS QUALITY CONTROL ENGINEER & EXPIDITING ENGINEER
1. COMPANY – PROCEDYNE ENGINEERS Chennai [ From Nov 2012 – Till Date ]
OVERALL JOB RESPONSIBILITIES
Quality control & assurance activities for material handling equipments & heavy Engineering items.
(fabricated components as well as machining components)
All stage wise inspection of job like: raw material identification on the bases of T.C. Fit Up-set up,
and NDT, hydro test, vacuum test, Pneumatic test, Holiday test, Pin Hole test, DFT
Preparing all necessary document as per QAP
Preparing Stage wise inspection report for fabrication, machining & welding jo int. Preparing WPS,
PQR & WQR
Co - ordination with third party Inspection
Follow up approvals of documents/drawings from discipline engineers. Receive purchase order
acknowledgment and execution schedules from suppliers. Maintain an expediting file for each purchase
order, which would be used through out the project period. Carry out desk as well as field expediting visits
to speed up deliveries.
Coordinate inspection and logistics activities between supplier and concerned parties. Authorize th ird party
inspection agencies for taking up inspection activities. Receive test results from inspector engineers and
follow up approvals by QA/QC. Fix up inspection visits in coordination with suppliers and TPA. Review
May 2015 Page 2 of 4
Sreenivasan K
Mumbai, India
**************@*****.***
inspection report and verify for compliance with PO requirements in consultation with QA/QC and respective
discipline.
Coordinate with freight forwarders and shipping department for quick transportation of equipments to
site. Issue marine declaration statement and maintain relationship between shipping, accounts payable and
procurements department. Also verify any discrepancies of invoices in accounting.
PROJECT EXPERIENCE AS SITE ENGINEER, PIPING
1. Mother Dairy Expansion Project, Pilakuva
Client: IDMCL, Anand, Vadodara
Scope of work: Piping, Equipment Erection & Commissioning
Role: Site in – Charge
Job Duration: May 2011 – Oct 2012
2. Devyani Foods Pvt. Ltd
Client: IDMCL, Anand, Vadodara
Scope of work: Piping, Equipment Erection & Commissioning
Role: Site in – Charge
Job Duration: Jan 2011 – Apr 2011
3. Kerala Water Associates
Client: BESL, Ernakulam
Scope of Work: Waste water treatment plant piping & Equipment erection
Role: Site In-Charge
Job Duration: Oct 2010 – Dec 2010
4. Kerala Water Associates
Client: L&T, ECC – Chennai
Scope of Work: Waste water treatment plant piping & Equipment erection
Role: Site In-Charge
Job Duration: Oct 2009 – Sep 2010
5. Surathgarh Thermal Power Plant
Client: Indure Private Ltd, New Delhi
Scope of Work: Waste water treatment plant piping & Equipment erection
Role: Site In-Charge
Job Duration: Dec 2008 – Sep 2009
OVERALL JOB RESPONSIBILITIES
Preparation of site activity planning in the detailed project schedule.
To review the planned activities and confirm the actual resources including the human, equipment, plant,
documentation, work method and sub-contractor as applicable during the site planning stages.
Daily and long term planning at site, coordination, control and efficient utilization of the required
resources for all site activities.
Coordination with QA/QC Engineer in receiving and inspection materials at site and generation of
material receiving records.
Coordination with QA/QC Engineer in reporting and disposition of NCR’s at site.
Coordination with Safety Engineer for the safety arrangements at site prior to start any activity at site.
May 2015 Page 3 of 4
Sreenivasan K
Mumbai, India
**************@*****.***
Reconciliation of all mark up drawings needed for As-built drawing generation.
Arrange proper handling and storage of materials/equipment at project site.
Regular review/progress meeting with the project team, sub-contractor personnel on the actual current
site execution status and plan for the required resources to meet the project target schedules/plans.
Overall coordination with the sub-contractor at project site.
Coordination with client representative on inspection/test witness and any other contractual obligation.
Monitoring & control of the relevant company procedures to ensure that they are followed correctly.
Rectify and implement any deficiencies reported by the client or QA/Q C Engineer.
Overall coordination with QA/QC Engineer, Project Engineer and all other engineers working at project
site.
Coordination of all requests for inspection at site and arrangement for inspection and testing at various
stages.
Monitoring, progress certifications, formal reporting and documentation including quality control of the
execution of the work in accordance with the procedures and requirements.
EXPERIENCE GAINED AS QUALITY CONTROL ENGINEER [From Jun 2004 – Aug 2008]
1. COMPANY - GESCO, Chennai [Sep 2006 – Nov 2008]
2. COMPANY – BAKKIYAM Industries, Coimbatore [May 2004 – Aug 2006]
OVERALL JOB RESPONSIBILITIES
Exposed to the areas of production, planning, quality Control, quality assurance and Regulatory Affairs
documentation.
Individually managed and executed the production line workman activities
Visual Inspection and dimensional measurements of precision machine components using
Digital & Dial Vernier, micrometer, Digital Height Gauge, Bore Dial, Profile Projector, ring
gauges and plug gauges.
Inspection and testing of production lines for complete line clearance before and after each production
slot.
Reviewed and verified production components meeting the manufacturing documentation requirements
Verification and quality check of incoming raw material before it goes to production phase.
Knowledge in ensuring production quality assurance checks through associated measuring instruments.
PERSONAL
Aggressive and devoted individual with penchant for hard work, thirst for continuous learning and
growing, Single and willing to relocate.
Effective communication and written skills.
May 2015 Page 4 of 4