OBJECTIVE
Maintenance Supervisor/Manager
SUMMARY OF QUALIFICATIONS
Maintenance Manager
WORK EXPERIENCE
Climatech, Hopkins, MN 12/2014 - Present
Maintenance Manager
I am responsible for my maintenance team, equipment, and prevention of
down time. I trouble shoot PLC's, program PLC's, Smart Relays, work on
hydraulic, pneumatic, electrical problems 120,230/480 VAC/DC, welding and
fabrication. I am efficient in PowerPoint, word, and excel.
Machines I Work on and with:
. Extrusion Machines
. Screw Coolers
. Water Filtration system
. Double Cut Saws
. Air Compressors
. Presses
. Punches
. Silos
Goals that I worked on maintaining my maintenance team:
I Train and upkeep on maintenance team's performance and schedules.
Make sure the maintenance teams routine maintenance goals are met.
Maintain and repair as needed electronic, pneumatic, and hydraulic
equipment.
Organize maintenance PM's and practices for continuous improvement so
that production equipment can achieve production goals.
Administration of PM's and work order management systems, to ensuring
system reliability and accuracy.
To maintain safety, cleanliness, and upkeep of equipment and maintenance
areas.
Akona Manufacturing, Maple Plain, MN 08/2010 - 12/2014
Maintenance Supervisor
I am responsible for the maintenance team, equipment, and prevention of
down time. I work to trouble shoot PLC's, Smart Relays, hydraulic,
pneumatic, electrical problems 230/480 VAC, welding and fabrication.
Machines I Work on and with:
. Dust Collection System
. Air Compressors
. Matrix
. Baggers
. Mixers
. Transfer Augers
. Silos
. 6 Head Filler
. Liquid Mixers
. Flexicon Fillers
. Whirl Air
Goals that I worked on for maintaining maintenance team:
I am Responsible of the maintenance team, how they perform, and what
their schedules are.
I Respond to maintenance PM's for routine maintenance, so that production
goals are met.
Maintain and repair as needed electronic, pneumatic, and hydraulic
equipment.
Accomplish PM's and practice continuous improvement so that production
equipment can achieve production goals set for that day.
Administration of PM's management system, ensuring system reliability and
accuracy.
To maintain safety, cleanliness, and upkeep of equipment and maintenance
areas.
Apex International, Chaska MN 01/ 2009 - 08/2010
Maintenance Mechanic Tech 3
Responsible for maintaining maintenance on machines. Configuration of
PLC's, set-up, testing and troubleshooting PLS, PLC. Troubleshooting 3
phase motors, hydraulics, pneumatics, and electrical.
Machines I Work on and with:
. Tub Lines
. Conveyor's
. Filling Machines
. Sealing Machines
. Bottle Fill Machines
. Tube Filling Machines
. Vertical Lines
Goals that I worked on maintaining for maintenance:
Respond to maintenance PM's for routine maintenance, so that production
goals are met.
Maintain and repair as needed electronic, pneumatic, and hydraulic
equipment.
Accomplish PM's and practice continuous improvement so that production
equipment can achieve production goals set for that day.
Keeping the PM's system up to date to ensuring system reliability and
accuracy.
To maintain safety, cleanliness, and upkeep of equipment and maintenance
areas.
Kopak Packaging Corporation, MN 09/2005 - 01/2009
Maintenance tech/supervisor
Responsible for making sure the shift is properly running while
maintaining maintenance on machines and its equipment.
Mechanic, my job is to make sure all lines are running and if a problem
arises fix it. To get production going first then to figure out how to
prevent that problem from happening again. Configuration, set-up, testing
and troubleshooting PLS, PLC, robotics. I have work with three phase
motors, hydraulics, pneumatics, electrical troubleshooting, and others.
Machines I Work on and with:
. Bartelts
. Protopaks
. Conveyor's
. HMC's
. Roberts Line
. Sandiacre
. Matrix
. Rovemea
. Volpaks
. Pacmac
. Conveyor's
. Metal Detectors
Supervise 2nd shift, which I would have a meeting with the shift to talk
about what our objectives are and how to achieve them at the start and end
of shift. We also talked about what we could improve on and how to achieve
our new goals. I worked on making sure things ran smoothly, and if there is
a problem I improvise to the situation appropriately.
I am the 2nd shift forklift driver where I organize the warehouse when
needed, load and unload 55ft trucks.
Goals that I worked on maintaining for maintenance:
Respond to maintenance requests and conduct routine maintenance so that
production equipment reliably achieves production goals.
Maintain and repair as needed electronic systems and equipment used for
that production time.
Accomplish preventive maintenance and practice continuous improvement so
that production equipment achieves production goals.
Administration of the computerized maintenance management system,
ensuring system reliability and accuracy.
To maintain safety, cleanliness, and upkeep of equipment and maintenance
areas.
EDUCATION
2005-2009 Automated Robotic Engineering Technology, Hennepin Technical
College, Eden Prairie, MN
Student Transcripts
Hennepin Technical College
Course Cr/Hr GPA
GPA
Subj Nbr Title Cr/Hr Grade Earned Credit
Pts
Fall 2005
Major: Automotive Technology (Ford ASSET)
COMM 2050 Interpersonal Comm 3.00 B 3.00 3.00
9.00
MATH 1000 Prealgebra 2.00 A 2.00 2.00
8.00
UNDG Term Att: 5.00 Earn: 5.00 GPA Crs: 5.00 GPA Pts: 17.00 GPA:
3.40
Cum Att: 5.00 Earn: 5.00 GPA Crs: 5.00 GPA Pts: 17.00 GPA:
3.40
Spring 2006
CPLT 1100 Intro to PC 3.00 A 3.00 3.00
12.00
SSCI 2100 Intro to Sociology 3.00 F 0.00 3.00
0.00
PHIL 2100 Critical Thinking 3.00 B 3.00 3.00
9.00
PHIL 2200 Ethics 3.00 A 3.00 3.00
12.00
ENGL 2125 Tech Writing 3.00 A 3.00 3.00
12.00
UNDG Term Att: 15.00 Earn: 12.00 GPA Crs: 15.00 GPA Pts: 45.00 GPA:
3.00
Cum Att: 20.00 Earn: 17.00 GPA Crs: 20.00 GPA Pts: 62.00 GPA:
3.10
Fall 2008
ARET 1125 Power Trans & Mech Systms 4.00 A 4.00 4.00
16.00
ARET 1130 Maintenance Operations 2.00 A 2.00 2.00
8.00
ARET 1160 Packaging Machnry Sys 4.00 A 4.00 4.00
16.00
ARET 1190 Prgrm Logic Controllers 3.00 A 3.00 3.00
12.00
President's List Achievement
UNDG Term Att: 13.00 Earn: 13.00 GPA Crs: 13.00 GPA Pts: 52.00 GPA:
4.00
Cum Att: 33.00 Earn: 30.00 GPA Crs: 33.00 GPA Pts: 114.00 GPA:
3.45
Spring 2009
ARET 1155 Automation Controls 3.00 A 3.00 3.00
12.00
ARET 1170 Troubleshoot Pkgng Mach 3.00 A 3.00 3.00
12.00
ARET 1200 Intro to Robotics 2.00 A 2.00 2.00
8.00
ARET 2110 Adv Prgrm Logic Contrl 4.00 A 4.00 4.00
16.00
UNDG Term Att: 15.00 Earn: 12.00 GPA Crs: 15.00 GPA Pts: 48.00 GPA:
3.20
Cum Att: 48.00 Earn: 42.00 GPA Crs: 48.00 GPA Pts: 162.00 GPA:
3.37
Fall 2009
ARET 2100 Adv Industrial Controls 4.00 A 4.00 4.00
16.00
ARET 2105 Fluid Pwr Motion Cntrl 2.00 A 2.00 2.00
8.00
ARET 2150 Eng Design & Fabrication 2.00 A 2.00 2.00
8.00
President's List Achievement
UNDG Term Att: 8.00 Earn: 8.00 GPA Crs: 8.00 GPA Pts: 32.00 GPA:
4.00
Cum Att: 56.00 Earn: 50.00 GPA Crs: 56.00 GPA Pts: 194.00 GPA:
3.46
* * * END OF ACADEMIC RECORD * * *