Post Job Free
Sign in

Project Manager Construction

Location:
San Diego, CA
Posted:
May 15, 2015

Contact this candidate

Resume:

KEY PERSONNEL RESUME

HARVEY ROGOFF

PROJECT MANAGER

EMPLOYMENT HISTORY & QUALIFICATIONS

Harvey Rogoff has over 42 years experience in the construction industry and more than 17 years with

Harper Construction Company. He has been involved in a wide variety of projects and his extensive

experience has prepared him to be exceptionally well qualified as Project Manager on a variety of

complex project types. He has been involved in all stages of project management, preconstruction, and

development, providing him with specific project experience in scheduling, contracts, construction law,

management and construction.

He has significant experience with Industrial, Commercial, Medical/Healthcare, University, Military, and

Design-Build projects. He is well versed in Systems Analysis, Value Engineering, and Design Resolution that

give him a basis to provide creative solutions to complex challenges while emphasizing a “win-win”

philosophy. As Project Manager, he oversees all administration and operations during both the design and

construction phases. He is responsible for the control of overall profitability, schedule management,

negotiation, and cost control. He is also qualified in safety and accident prevention, education and

training, compliance with OSHA, and EM-385-1-1 regulations, and our corporate safety program.

HARPER CONSTRUCTION CO., INC. June 2001 to Present

San Diego, CA

Project Manager

F-35 Joint Strike Fighter (JSF) Aircraft Maintenance Hangar (P-535), MCAS Yuma, Arizona. Contract No.:

N62473-08-D-8617-0004. Design-Bid-Build construction of the new P-535 Aircraft Maintenance Hangar to

provide a new transient universal hangar facility at Marine Corps Air Station, Yuma, Arizona. The hangar

supports the training and maintenance operations of transient rotary wing aircraft (MV-22) deployed to

Marine Corps Air Station (MCAS) Yuma and also be compliant with F-35 Joint Strike Fighter (JSF) aircraft

maintenance requirements including a high bay space, crew and equipment space, administrative

space and Special Access Program Facility (SAPF) areas. The new 2-story F-35 Joint Strike Fighter (JSF)

compliant Aircraft Maintenance Hangar includes a high bay space (OH), crew and equipment space

(01), administrative space and Special Access Program Facility (SAPF) areas (02). The SAPF areas

incorporate the requirements of the Automatic Logistics Information system (ALIS). The new hangar is

designed to meet mission requirements of the F-35 JSF. New POV parking will include sun shades

(carports) with roof-mounted Photovoltaics. Paving and site improvements include exterior site and

building lighting, paved parking, sidewalks, storm water management, drainage improvements,

earthwork, grading and xeriscape landscaping. Total Square Footage: 65,609 SF. Award Date:

09/06/2012 - Completion Date: 12/31/2014 (est.). Award Amount: $29,181,434 - Final Contract Amount:

$29,968,064 (est.).

Project Manager – Partial Assignment: F-35 Aircraft Maintenance Hangar (P-545) – North, MCAS Yuma, Arizona.

Contract No.: N62473-10-D-5406-0003. Design and construction of a new 2-story F-35 Joint Strike Fighter

(JSF) compliant Aircraft Maintenance Hangar including a high bay space (OH), crew and equipment

space (01), administrative space and Special Access Program Facility (SAPF) areas (02). The facility also

includes Offices, Briefing Rooms, Maintenance areas, Tool Rooms, and Locker Rooms. All spaces were

designed to comply with ADA and Anti-Terrorism/Force Protection (AT/FP) criteria. The project site

included concrete aircraft parking aprons adjacent to the hangars, taxiway connections and all

required striping. The parking apron included aircraft sun shields, electrical grounding, and refractory

concrete. New POV parking will include sun shades (carports) with roof-mounted Photovoltaics. Paving

HARVEY ROGOFF KEY PERSONNEL RESUME – Page 2

and site improvements include exterior site and building lighting, paved parking, sidewalks, covered

picnic area, storm water management, drainage improvements, earthwork, grading and xeriscape

landscaping. The project achieved a USGBC LEED Gold Certification. Total Square Footage: 62,522 F.

Award Date: 03/20/2012 - Completion Date: 06/31/2014 (est.). Award Amount: $36,735,202 - Final

Contract Amount: $39,121,568.

Project Manager – Partial Assignment: F-35 Aircraft Maintenance Hangar (P-545) – South, MCAS Yuma, Arizona.

Contract No.: N62473-10-D-5406-0003. Design and construction of a new 2-story F-35 Joint Strike Fighter

(JSF) compliant Aircraft Maintenance Hangar including a high bay space (OH), crew and equipment

space (01), administrative space and Special Access Program Facility (SAPF) areas (02). The facility also

includes Offices, Briefing Rooms, Maintenance areas, Tool Rooms, and Locker Rooms. All spaces were

designed to comply with ADA and Anti-Terrorism/Force Protection (AT/FP) criteria. The project site

included concrete aircraft parking aprons adjacent to the hangars, taxiway connections and all

required striping. The parking apron included aircraft sun shields, electrical grounding, and refractory

concrete. New POV parking will include sun shades (carports) with roof-mounted Photovoltaics. Paving

and site improvements include exterior site and building lighting, paved parking, sidewalks, covered

picnic area, storm water management, drainage improvements, earthwork, grading and xeriscape

landscaping. The project achieved a USGBC LEED Gold Certification. Total Square Footage: 62,522 SF.

Award Date: 03/20/2012 - Completion Date: 06/31/2014 (est.). Award Amount: $33,190,866 - Final

Contract Amount: $37,837,715.

Regimental Maintenance Complex (P-726) - Phase III, Las Pulgas 43 Area, MCB Camp Pendleton, CA.

Contract No.: N62473-08-D-8617-0003. Design-Build Contract. This project constructs Phase III of the

Regimental Maintenance Complex in the Las Pulgas Area 43 of MCB Camp Pendleton. The complex

includes design and construction of a Battalion/Squadron Headquarters, Engineering Maintenance

Facility, Conversion of Building 43574 into Storage Air/Ground and Applied Instruction Facility, and Heavy

Equipment Parking Area. The Battalion/Squadron Headquarters is an 18,159 sf, three-story, masonry

building and will provide administrative offices and other support functions. The Battalion/Squadron

Headquarters is an 18,159 sf, three-story, masonry building and will provide administrative offices and

other support functions. The Engineering Maintenance Facility is a 12,971 sf, one-story masonry building

and will provide repairs and maintenance of engineering construction equipment including tracked

vehicles. The building includes (6) drive-through bays, two grease pits, battery shop, parts storage room,

tool room, restrooms/showers, locker room, framing support for 10-ton overhead bridge crane, and

administrative spaces. Existing Building 43574 will be converted for Storage of Air or Ground Organic

Units (14,424 sf) and an Applied Instruction Facility (5,177 sf) including an upgrade of the structural system

to meet current seismic codes, and a new standing seam metal roof. Includes demolition of existing

Buildings 43433 and 43432. The project achieved a USGBC LEED Platinum Certification. Total Square

Footage: 47,717 sf. Awarded 09/30/2009 – Completed 10/19/2011. Award Amount: $16,838,431 – Final

Contract Amount: $22,994,094.

Parkside Terrace Residential & Community Church, San Diego, CA. Parkside Terrace is a mixed-use

project located in downtown San Diego and combined a church facility and a mid-rise residential

structure. It is comprised of 77 affordable housing rental units intended for low-income residents (25

studios, 18 one-bedroom, 29 two-bedroom and 5 three-bedroom units), plus 700 SF of retail space, and

the East Village Community Church. The apartment project is built adjacent to and over the Church.

The housing portion of the project included residential units, an indoor community center, a computer

room, common laundry facilities and an outdoor community terrace with play-equipment. The East

Village Community Church was designed with 300 seats, in a vaulted sanctuary featuring an iconic

stained-glass cross at the corner of 14th Street & Island Avenue. The project focused on energy and

resource-efficiency and more healthy and durable conditions for the occupants. Electricity to the

common areas is provided by photovoltaic system. The project achieved LEED Platinum Certification

under the USGBC Homes Pilot Program. Parkside is the first affordable housing development in San

Diego to achieve a USGBC LEED certification for achievement in green homebuilding and design.

Awarded 04/01/2008 - Completed: 12/01/2009.

HARVEY ROGOFF KEY PERSONNEL RESUME – Page 3

The Rock Church & Academy, NTC-Liberty Station, San Diego, CA. Construction of a combination

remodel and new construction of a religious school and church facility at the former Naval Training

Center site in San Diego. The multi-story Rock Church building will be 180 feet wide, three stories tall, and

443 feet long. Nearly 3 football fields could fit on the ground floor. This amazing space will become the

home to the Rock Church, Rock Academy School & Miles Ahead Ministries. The sanctuary will have

3,500 seats sloping down to a 60-foot wide center stage. The Rock Academy will be housed in 35,000

square feet of classroom space, with 21 separate classrooms for grades K-12. The classrooms are

designed for flexibility as The Rock University will use the classroom space during the evening and

weekends for adult education and training. A 6,000 square foot “Rockpile” Resource Center will be used

to supply students, faculty and members with books, bibles, study materials, music and clothing.

Connected to this bookstore will be the cafeteria, with over 500 seats, both inside and outside,

overlooking Rock Creek Park. The scope of work included the major demolition, renovation, and new

construction on the site of an existing building previously used by the Navy at the former Naval Training

Center. Approximately half of the existing structure was completely demolished, including all testing and

abatement of numerous hazardous materials. The area was replaced with the large and dramatic

sanctuary area. The balance of the existing building was completely gutted and remodeled into the

Academy classrooms, cafeteria, bookstore, administration offices, and support areas. The entire facility

was designed with state-of-the-art equipment and systems to provide a top quality experience for

students, faculty, church members, and visitors alike. Total Square Footage: 200,000 sf. Awarded

09/01/2005 – Completed 08/24/2007. Award Amount: $27,304,740 – Final Contract Amount: $34,408,304.

Air Traffic Control Tower (P-216), Naval Air Station (NAS) Lemoore, CA. Contract No.: N68711-02-D-8067-

0004. Design-Build Contract. Design-build construction of a new 10-story Air Traffic Control Tower. The

project scope included relocation of existing rooftop antennas, cameras, and equipment. The tower

included a briefing/break room, offices, training and storage rooms, stairway, elevator, restroom facilities

near the cab and locker room, and blast resistant windows. Also included in the project scope was the

demolition of the upper floors of the existing Control Tower (Bldg 5) and various modifications to the

remaining floors of Bldg 5 to make it suitable for future use. The lower floors of Bldg 5 will remain to

maintain utility services. Awarded 02/22/2006 – Completed 07/11/2008. Award Amount: $8,827,265 –

Final Contract Amount: $8,827,265.

Young Life - Oakbridge Club Room, Ramona, CA. Design-Build Contract. Design and construction of a

new Club Room at the existing Oakbridge Retreat Facility. Oakbridge is used as a multi-denominational

destination and retreat for various adult and youth groups associated with churches and youth

organizations. The facility has been developed over the course of 20 years with several additions and

improvements completed by Harper Construction in that time. Awarded 01/20/2006 – Completed

12/15/2006. Award Amount: $1,550,581– Final Contract Amount: $1,390,237.

G Lofts West, San Diego, CA. This mixed-use project is located in the heart of the newly redeveloped

community of East Village in Downtown San Diego. The project is adjacent to the Historic Gaslamp

Quarter and spans 6th Avenue on a corner location on G Street. The five-story project provides prime

retail and residential lofts in the heart of San Diego’s downtown. This mixed-use project includes 148 high-

end apartment homes, with retail space on the street level, and levels 2 thru 5 comprised of residential

units. Residential parking is provided in the underground garage. The structure was a multi-story building,

with wood floors, steel frames, and a combination of built-up and shingled roofing. All building products,

fixtures, hardware, and other system components were selected for high end residential living, and

designed for durability and energy efficiency. The design included dedicated service core areas

consisting of laundry facilities, vertical & horizontal circulations, janitor’s closets, and

mechanical/electrical space. Total Square Footage: 130,000 sf of 5-Story Apartment Building + 58,000 sf

of Parking. Awarded 07/21/2004 – Completed 12/07/2006. Award Amount: $18,614,000 – Final Contract

Amount: $19,472,882.

Catholic Charities, San Diego, CA. A multi-story residential project located in the heart of Downtown San

Diego. The project was designed as a transitional residence for in-need women. Harper Construction

Company assisted the developer and the owner (Catholic Charities) with the design and budgeting of

HARVEY ROGOFF KEY PERSONNEL RESUME – Page 4

the project through the initial concept phases. The funding requirements of the project required

extensive value engineering and considerable conceptual estimating to insure that the project could

be delivered within budget. The structure was a multi-story wood-framed building, with wood floors &

steel frames. Awarded 12/01/2003 – Completed 04/15/2005. Final Contract Amount: $4,211,390.

Air Traffic Control Tower & Radar Air Traffic Control Center (P-474), MCAS Yuma, Arizona. Contract

No.: N68711-01-D-6223-0003. Construction of a pre-engineered building, including a 15-story high

Control Tower and an adjacent Radar Air Traffic Control Center. The Air Traffic Control Tower

(ATCT) and Radar Air Traffic Control Center (RATCC) include elements of a design-build process to

include: (1) a pre-engineering building; (2) communications duct bank; (3) pre-cast concrete

panels for the tower; and (4) fire sprinkler system and related work. The Radar Air Traffic Control

Center consists mostly of support offices designed for administrative functions. The control tower

includes an operations cab and was designed for both military and civilian air traffic control. All

aspects of the project were carefully coordinated with the Federal Aeronautics Administration

(FFA). Compliance with both the military and FAA Design Guidelines was critical to the successful

delivery of this project. A double security fence, turnstiles, and card readers were included for

security and Anti-terrorism/Force Protection (AT/FP) consideration. Also included in the scope was

the extensive routing of the communications duct bank and electrical cabling to the new tower

location. This included tunneling under the existing runway without disrupting on-going flight

operations, and conformance to Airfield Safety Criteria of NAVFAC P-80.3. Sitework includes a new

storm drainage system for the adjacent canyon, a public parking lot, and miscellaneous civil

structures for a city maintenance facility. Total Square Footage: 16,747 sf. Awarded 09/20/2002 –

Completed 03/28/2004. Award Amount: $7,564,399 – Final Contract Amount: $7,505,434.

Engine/Chassis Maintenance Training School (P-520), Naval Base Ventura, Port Hueneme, CA.

Contract No.: N68711-01-D-6217-0005. Design-Build Contract. Design-build construction of a

single-story, high-bay building intended for use as a vehicle maintenance school. The facility

included space for classrooms, administration areas, tool storage, and a large vehicle apron.

Classrooms and shops were provided with proper space for instructional mock-ups and displays

including engines or bulldozer chassis. The vehicle apron was been designed for dynamic loading

and the storage of full-size, heavy equipment vehicles. HAZMAT storage for vehicle fluid such as

lubricants, oils, antifreeze and hydraulic fluid was included in a designated space. The design

provided a reinforced masonry, high-bay building with a steel frame, concrete slab-on-grade, and

a standing seam metal roof. The standing seam metal roof included numerous skylights to optimize

natural daylighting. The interiors at the one-story classroom, tool room and office spaces were

metal stud framing with gypsum board. Attractive durable materials were used for the exterior

finishes including; CMU, aluminum louvers, aluminum windows, insulated metal doors with welded

frames, and aluminum soffits. Six existing buildings were demolished and require the removal and

disposal of lead, asbestos, and other hazardous materials. Special design features for Anti-terrorism

and Force Protection were included in the final design. Total Square Footage: 9,244 sf. Awarded

08/19/2002 –Completed 02/05/2004. Award Amount: $3,297,265 – Final Contract Amount:

$3,291,282.

U.S.D. East Campus Student Housing, 103 Student Apartments, University of San Diego, CA. Design-

Assist contract. The project consists of two (2) individual, Type 5 wood-framed buildings. The

project includes one 4-story and one 3-story building. The two buildings are three and four levels of

apartments with full kitchens and living rooms. Conference rooms are provided on the first and

third floors of the facility for large group meetings and classes. A convenience store is included on

the first floor of the four-story building. Includes 103 student apartments with 356 total beds,

designed in 2 & 4 bedroom configurations, plus several administration and multi-purpose areas.

Includes parking for 317 cars. The project is concrete podium construction, with three and four

levels of wood framing constructed above two levels of underground parking. The project site

included several challenges including: replacement of 650 linear ft. of the 54" RCP storm drain;

excavating and removing more than 50,000 cubic yards of earth, rubble and concrete debris;

HARVEY ROGOFF KEY PERSONNEL RESUME – Page 5

installing 1,230 linear ft. of cast-in-place concrete caissons; installing 1,750 linear ft. of Keystone

retaining walls; relocating 1,500 ft. of 12 KVA power lines and transformers; and coordinating daily

activities and site access around campus sporting events and an operating Child Development

Center directly adjacent to the site. The entire project was accelerated on an extremely

aggressive fast-track schedule to accommodate the school year schedule. Total Square Footage:

248,471 sf (141,471 sq. ft. of wood frame structure over 107,000 sq. ft. of concrete garage). Phase 1

Awarded 05/01/2001 / Phase 2 Awarded 02/05/2002 – Completed 09/15/2002. Phase 1 Award

Amount: $5,386,377 + Phase 2 Award Amount: $14,529,856– Final Contract Amount: $20,735,459

(combined).

SUNROAD ENTERPRISES 1998 to 2001

San Diego, California

Vice President of Construction

Sunroad Corporate Centre (Four, 4-storyBuildings + 2 Parking Structures), La Jolla, CA, $100,000,000.

Maderas Golf Club, Poway, CA.

Sunroad Otay Centre, San Diego, CA.

Sunroad Otay Park, San Diego, CA.

Sunroad Otay Ranch, San Diego, CA.

Sunroad Palomar Centre, Carlsbad, CA.

Sunroad Resort Marina, San Diego, CA.

Sunroad Valley Centre, San Diego, CA.

HARPER CONSTRUCTION COMPANY, INC. 1995 to 1998

San Diego, CA

Project Manager

Child Development Center, Edwards Air Force Base, Army Corps of Engineers, Lancaster, CA.

Design-Build Contract. Design-build construction of a single-story, 33,000 square foot classroom

and administration building. This project was nominated as a finalist candidate for a prestigious

1997 Air Force Merit Award, an Air Force-wide award for project excellence. Total Square Footage:

33,000 sf. Completed 08/27/1996. Contract Amount: $4,725,562.

Navy Lodge Addition-100 Rooms, NAS North Island, Coronado, CA. Contract No.: N68711-94-C-

1653. Design-Build Contract. Design-build construction of a single multi-story project resembling a

private sector hotel. Included administration offices, 100 guestrooms, laundry facilities, and

covered porte cochere. The project is made up of a multi-story, 79,748 square foot structure. The

exterior architecture was traditional Spanish-influenced, stucco with a concrete tile roof, and tile

accents. Awarded 05/24/1995 – Completed 06/06/1996. Award Amount: $4,299,265– Final

Contract Amount: $4,546,999.

Maranatha Chapel, Rancho Bernardo, CA. Design-Build Contract. Three buildings including a

Sanctuary, a Classroom Building and a Fellowship Hall, with parking for 750 vehicles. The Sanctuary

Building is approximately 43,000 square feet and features an impressive glass foyer, and a 3,000

seat main chapel room with open ceiling, and numerous offices, a conference room, and a study.

The interior features olive wood and Jerusalem stone for an old world look. The Classroom Building

is an 18,187 square foot, two-story structure used to accommodate Sunday School and Bible Study

classes. The Fellowship Hall is a 9,720 square foot, single-story, multi-purpose room. Total Square

Footage: 75,000 sf. Contract Amount: $6,112,067. Completed 11/1997.

Staff Lounge, Young Life's Oakbridge Camp, Ramona, CA. Completed 1996.

HARVEY ROGOFF KEY PERSONNEL RESUME – Page 6

SELF EMPLOYED CONSTRUCTION MANAGEMENT CONSULTANT 1994 to 1995

San Diego, CA

Construction Management Services and Expert Witness Testimony

Argen Precious Metals, Inc., San Diego, CA.

Copyline Corporation, San Diego, CA.

Gray, Cary, Ware & Freidenrich, San Diego, CA.

International Savings Bank, San Diego, CA.

Kearny Mesa Ford, San Diego, CA.

Pacific Honda, San Diego, CA.

Sunroad Enterprises, San Diego, CA.

KILGALLON CONSTRUCTION COMPANY, INC. 1993 to 1994

San Diego, CA

Vice President / Senior Project Manager

Air Traffic Control Facility, United States Navy, MCAS Camp Pendleton, Oceanside, CA.

Construction of a new Air Traffic Control Tower and an adjacent Radar Air Traffic Control Center

adjacent to the runway at Marine Corps Air Station, Camp Pendleton.

Automobile Maintenance Facility, NAVSTA San Diego, CA.

Gymnasium Remodel, US Air Force, Riverside, CA.

Small Craft Maintenance Facility, NAB Coronado, CA.

Medical/Dental Building, United States Navy, San Diego, CA.

Mess Hall Expansion, United States Navy, MCB Camp Pendleton, Oceanside, CA.

Tierrasanta Elementary School Number Five, San Diego Unified School District, San Diego, CA.

CENTEX GOLDEN CONSTRUCTION COMPANY 1990 to 1993

San Diego, CA

Senior Project Manager / Project Manager

U.C.S.D. Thornton Hospital, University of California at San Diego, La Jolla, CA, $53,000,000.

Eastlake High School - Phase I, Sweetwater Union High School District, Chula Vista, CA.

Entry Deck Restoration, Frost St. Medical Office Building, S.D. Med. Center Assoc., San Diego, CA.

U.C.S.D. Perlman Ambulatory Care Center, University of California at San Diego, La Jolla, CA.

SUNROAD ENTERPRISES 1986 to 1990

San Diego, California

Senior Project Manager / Project Manager

Sunroad Park Plaza Office Building, San Diego, CA.

Sunroad Resort Marina, San Diego, CA.

Street Improvements, Avon, Colorado

Sunroad Plaza III Office Building, San Diego, CA.

Sunroad Mitsubishi, Escondido, CA.

Sunroad Acura, Escondido, CA.

Lomas Del Cerro Condominiums (Four Buildings), San Diego, CA.

Sunroad Pacific Tower Office Building, San Diego, CA.

HARVEY ROGOFF KEY PERSONNEL RESUME – Page 7

Sunroad Mesa Gateway Office Building, San Diego. CA.

M. H. GOLDEN COMPANY 1981 to 1986

San Diego, California

Project Manager / Division Manager

U.S.D. School of Business, University of San Diego, San Diego, CA.

U.S.D. Manchester Conference Center, University of San Diego, San Diego, CA.

Imperial Bank Office Tower, Trammell Crow Company, San Diego, CA.

Carroll Business Center, Trammell Crow Company, San Diego, CA.

Maple Canyon Condominiums, Douglas Development, San Diego, CA.

Target Department Store Remodel (Eight Buildings), Target, San Diego County, CA.

Frost Street Medical Office Building, San Diego Medical Center Associates, San Diego, CA.

Magnetic Resonance Imaging Facility, Sharp Hospital, San Diego, CA.

Bekins Warehouse Remodel, McClintock Plaza Partners, San Diego, CA.

Rio Vista Office Building, Calmat Properties Company, San Diego, CA.

Office Building, KJOS Enterprises, San Diego, CA.

Vista Hill Hospital, Vista Hill Foundation, Chula Vista, CA.

Plaza at La Jolla Village (Two Buildings), Harry L. Summers, Inc., La Jolla, CA.

Kearny Mesa Industrial Park, Douglas Development, San Diego, CA.

ROBERT G. FISHER COMPANY 1977 to 1981

San Diego, CA

Director of Contract Administration / Vice President & General Manager of Fisher/CM

Cancer Research Animal Facility, Salk Institute, La Jolla, CA.

May Company, Plaza Bonita Shopping Center, Chula Vista, CA.

Wangenheim Junior High School, San Diego Unified School District, San Diego, CA.

Valencia High School, Yorba Linda School District, Placentia, CA.

Woodbridge High School, Irvine Unified School District, Irvine, CA.

Office Complex, Roy Carver, Jr., Irvine, CA.

Civic Center, City of Chula Vista, Chula Vista, CA.

Aerospace Museum Remodel, City of San Diego, San Diego, CA.

G. L. CORY, INC. 1972 to 1977

San Diego, CA

Estimator / Project Engineer / Project Manager

U.C.I. Residence Halls (Nine Buildings), University of California at Irvine, Irvine, CA.

Hangar Number Six, Miramar Naval Air Station, San Diego, CA. Construction of a new aircraft

hangar at Miramar Naval Air Station. The hangar was over 600-feet long with twelve hangar bays.

The Hangar included new fire alarm and sensing and suppression systems. All fire suppression

system will include an Aqueous Film Forming Foam System (AFFF) and a water sprinkler system.

Border Crossing Station, United States Government, San Ysidro, CA.

U.C.S.D. Cancer Research Facility (Two Buildings), U.C.S.D. Medical Center, San Diego, CA.

Office Complex (Three Buildings), Allstate Insurance Company, Rancho Bernardo, CA.

Hospital Complex, Community Hospital of Chula Vista, Chula Vista, CA.

HARVEY ROGOFF KEY PERSONNEL RESUME – Page 8

Metropolitan Correctional Center, United States Government, San Diego, CA.

Rehabilitation Center, Sharp Hospital, San Diego, CA.

Math Science Building, San Diego Community College District, San Diego, CA.

EDUCATION

Bachelor of Architecture Degree (Engineering Option); University of Illinois, Urbana, Illinois, 1970.

Master of Science Degree in Architectural Engineering; University of Illinois, Urbana, Illinois, 1971.

Master of Science Degree in Civil Engineering (Construction Management Program); Stanford

University: Palo Alto, California, 1972.

Course Work in Contracts, Property, Torts, Legal Writing, and Legal Bibliography; University of San

Diego School of Law (Evening Program), San Diego, California, 1973 - 1974.

SUMMARY OF QUALIFICATIONS, CERTIFICATIONS & PROFESSIONAL AFFILIATIONS

Member - Commercial Panel, Mediation Panel, and Dispute Review Board Panel of the American

Arbitration Association

Member - San Diego State University College of Engineering Faculty. Taught an Undergraduate

course in Construction Scheduling and a Graduate Course in Construction Management.

Member - California Community Colleges Faculty. Instructor of Architecture and Engineering,

General Contractor's License, State of California, License Number B-406049, Classification "B".

Safety Certification: 30-Hour OSHA Construction Safety Course



Contact this candidate