CRAIG CHIPPERFIELD ************.*****@*****.***
**** ***** *** **., *******, GA 30041 678-***-****
Summary
Manufacturing professional with a strong work ethic and passion to drive business results through developing
and implementing strategies, optimization of supply chain and manufacturing processes, and motivating and
developing teams.
Professional Experience
Clorox – Product Supply Organization
The Clorox Company, a Fortune 500 company, is a multinational manufacturer and marketer of consumer and
professional products. Clorox annual net sales are approximately $5.5 billion with nearly 8,000 employees supporting
its global business.
-Atlanta, GA
Global Strategic Sourcing Manager – Contract Manufacturing Corporate
2013 -Current
• Responsible for creation and execution of category Manufacturing Supply Chain Strategy supporting
new product growth and improving cost of manufacturing at over 20 manufacturing sites.
• Identified capable manufacturing partners, negotiated commercial terms, and managed business
relationships of over $50MM spend comprised of both EPA & FDA regulated products.
• Provided leadership to ensure alignment between the Strategic Business Units and the Operations
functional objectives.
• Led cross-functional teams to create and implement over $2MM cost savings annually through supply
chain optimization, packaging and process innovation, and operations excellence.
• Manufacturing and Sourcing Subject Matter Expert on over four company-wide Kaizen / Value Stream
Mapping process improvement initiatives.
-Atlanta, GA
Project Manager – Contract manufacturing Corporate
2013
• Managed a customer-transparent transition of Systems, Processes and People of a $4MM
Final/Secondary Copack FDA - Cosmetics manufacturing operation.
• This complex project included working under an accelerated timeline for project planning phase
through steady state phase, demanding constant communication & coordination with all levels of the
organization, ultimately producing a launch that was on time and under budget.
• Conducted Process Mapping Events to identify and create actions against critical handoffs; ensuring
supply during each phase of the transition as well as laying a foundation for long-term business results.
-Atlanta, GA
Global Contract Manufacturing Manager Corporate
2011 – 2013
• Operational Plant Manager of nine contract manufacturing plants; over $25MM in contracted spend of
350+ EPA and FDA regulated sku’s.
• Lead manufacturing site transition and operational start-up of two $5MM Secondary Pack
manufacturing plants while ensuring supply of over 200 products.
• Established and promoted best-in-class capacity planning models and metrics to drive out losses and
attain business objectives: S.P.A.C.E. (Safety, Product Quality, Availability, Cost, and Enable
Innovation).
• Leveraged LEAN methodologies to drive out over $750K in waste in both production plants and the
supply chain.
-Spring Hill, KS
Maintenance Manager Clorox / A&M Products
2008 – 2011
• Managed daily and strategic objectives of 21 maintenance personnel, including planner, scheduler, and
procurement.
• Effectively controlled a $3MM maintenance annual budget for a 500K sq.ft cat litter facility.
• Supported five highly automated high speed production lines with over 5,000ft. of conveyor, and an
automated processing department capable of producing 155tons/hr.
• Utilizing World Class Manufacturing principles, reduced equipment breakdowns by 25% per year,
achieving record lows for the facility.
• Increased technician skill levels via training to reduce fixed maintenance spend 6% per year.
• Modified organizational structure of maintenance group to facilitate improved line safety, OEE and
teamwork.
• Initiated companies first Value Stream Mapping event on maintenance work order flow to decrease
work order lead times and increase process efficiencies.
• Embraced innovation, using methodologies that include Focused Improvements, VSM, 5S, and PM
Optimization.
Lincoln, NE
Molex Incorporated – Automotive Division
Molex is the world's second-largest manufacturer of electronic and electrical interconnection products and systems.
This $3.5 billion business involves high-volume production and assembly of plastic injection-molded components,
electrical circuitry, stamped and plated terminals, and die-castings.
Stamping Maintenance Supervisor Stamping Department
2006 – 2008
• Managed fifteen maintenance personnel, process and controls engineers, and process technicians.
• Implemented predictive maintenance metrics to maximize OEE and equipment reliability.
• Championed Six Sigma tools such as LEAN, DMIAC, and 5S to implement cost reduction ideas,
equipment improvements and department change initiatives.
• Successfully raised on-time completion of PM’s from 32% to 92%, reducing average days to complete a
planned PM from 36 to 3 days, while managing complex plant and corporate engineering projects.
• Helped ideate and implement short and long-term strategies at the department and plant level (Capital,
Organizational structure, IT, processes) to enable continued growth and competitiveness.
Production Planner Supervisor / Buy & Resale Planner Stamping Department
2004 - 2006
• Directly managed two department planners and indirectly supervised six material handlers to plan Buy
and Resale products for the entire facility.
• Worked cross-functionally with corporate purchasing and marketing to ensure sustainable, strong
vendor performance.
• Actively initiated and directed LEAN events that facilitated reduction of lead-times, material
movements and reduction of inventory levels by over 40%, while increasing promised delivery
attainment to record 97.2%
• Created metrics, complied and utilized department reports to drive optimization and sustainment in
capacity planning, forecast, inventory, and delivery.
Production Planner Stamping Department
2003 - 2004
• Effectively utilized SAP to run material requirements planning (MRP) enabling timely execution of
customer orders while supporting ISO and QS9000 Standards.
• Proactively planned in highly complex work environment with constantly changing demands to meet
customer requested delivery dates while maintaining low inventory of finished goods, raw materials and
packaging.
• Coordinated daily production schedules with all functions of the operations, tool & die, and quality.
Manufacturing Engineer Assembly Engineering Department
1999 - 2003
• Executed new product development projects using tools such as feasibility analysis, process flow charts,
FMEA’s, prototypes and concept design reviews focusing on cost and quality measures.
• Proactively identified and solved manufacturing and product quality problems through measurement
techniques, data gathering, statistical tools, and root cause analysis.
• Worked cross functionally to identify, perform feasibility studies, and execute cost reduction / process
improvement measures on the manufacturing floor which included design and drawing of machine
tooling, work area layout, training / planning operator tasks, performing time effectiveness studies and
ergonomic analysis.
Failure Analysis Technician Intern Quality Control Department
1999
Identified root-cause for failure of electrically faulty parts. Dealt particularly with Surface Mount
•
Technology related issues and communicated these between machine operators and/or suppliers to
resolve quality concerns.
Education
Bachelor of Science in Industrial and Management Engineering
2003 University of Nebraska-Lincoln
Six Sigma Green Belt Certification
2007 Break-Through Management Group