Profile
Motivated and personable, with a successful 8-year track record of lease
operating and optimization. Talent for quickly adapting to different
methods of production. Dedicated to ensuring safe work practices in the
field.
Flexible and versatile - able to maintain a sense of humor under pressure.
Thrive in fast-paced environments. Work well with others.
Skills Summary
SCADA Surface Production Equipment Leadership
Down hole Operations Vendor Relations Teamwork
Artificial Lift Methods Project Management Microsoft Office
Work Experience
optimization operator - talisman energy
o WORK CLOSELY WITH ENGINEERS TO DEVELOP DIFFERENT METHODS OF
OPTIMIZING PRODUCTION
o Install and optimize plunger lift systems
o Perform down hole work such as swabbing, setting BHA for plunger
lifts, pressure test, tubing testing
o Optimize gas lift on wells to enhance production
o Train operators on proper methods of operating fields
o Keep up with daily reports, and cost
o Perform fluid shots to determine fluid level
lease operator level B - devon energy
0. OPTIMIZE WELL PRODUCTION USING VARIOUS METHODS OF ARTIFICIAL LIFT
0. Maintain low LOE
0. Maintain production equipment
0. Use technology to gather and input information for different well
sites
0. Ensure safe work practices
0. Comply with regulatory and environmental standards
lead man/sr. lease operator - chesapeake energy, cleburne field office
ASSESS REPORTS FROM PUMPERS AND PRIORITIZE DAILY FIELD TASKS
Work with engineers for field production improvements
Solve complex production problems
Maintain low LOE
Maintain production equipment
Manage crews while working on location
Optimize well production while using various methods of artificial lift
Foster teamwork to help other pumpers enhance production
Ensure safe work practices
Comply with regulatory and environmental standards
sr. lease operator - chesapeake energy, cleburne field office
OPTIMIZE WELL PRODUCTION USING VARIOUS METHODS OF ARTIFICIAL LIFT
Maintain low LOE
Maintain production equipment
Use technology to gather and input information for different well sites
Ensure safe work practices
Comply with regulatory and environmental standards
lease operator, level III - chesapeake energy, tyler field office
OPTIMIZE WELL PRODUCTION USING VARIOUS METHODS OF ARTIFICIAL LIFT
Maintain low LOE
Maintain production equipment
Use technology to gather and input information for different well sites
Ensure safe work practices
Comply with regulatory and environmental standards
pumper - bowman's oilfield service
OPTIMIZE WELL PRODUCTION USING VARIOUS METHODS OF ARTIFICIAL LIFT
Maintain low LOE
Maintain production equipment
Use Sony to calculate well production
Change charts
Ensure safe work practices
Comply with regulatory and environmental standards
radiographer, level II - h&h x-ray services
PERFORM NON-DESTRUCTIVE TESTING ON PIPELINES AND TANKS
Film interpretation
Welder tests
Work with blue prints and draw as builts
Comply with Texas Bureau of Radiation Control and other regulatory and
environmental standards
Employment History
Talisman Energy - Three Rivers, Texas
Optimization Operator - 8/2013 to present
devon energy - Cresson, TX Field Office
Lease Operator, Level B - 12/2012 to 8/2013
chesapeake energy - Tyler, TX and Cleburne, TX Field Offices
Lead Man / Sr. Lease Operator - 3/2012 to 12/2012
Sr. Lease Operator - 6/2010 to 3/2012
Lease Operator, Level III - 6/2008 to 6/2010
bowman's oilfield services - Henderson, TX
Contract Pumper - 1/2006 to 6/2008
H&h x-ray services - Tyler, TX
Radiographer, Level II - 6/2001 to 12/2005
Education
rusk high school - Rusk, TX
1993 Graduate
Training
2007 - Training on various pumping units, hydraulic, electric, and gas
powered. Training consisted of what to look for, how to change out packing,
stroke speed, pump fillage. How to check to see the warmth of the polish
rod, and look for jerks in rod string. Also learned how to read a dyno-
card. Given by Lufkin
2008 - Gained training through experience with de-hy, heater- treater, and
line heater. Learned how to pull samples for dew point.
2011 - Extensive training on plunger lifts, and gas lifts by Lufkin.
Learned different set ups on gas valves, how they operate and how the
bottom hole pressure determines the pressures in which the gas lift valves
are set. With plunger lifts I was trained on what plungers could bring up
the right amount of fluid, and looked at various plungers from a sand
plunger to a fast fall, to a two piece. Learned drop times and how to set
up a plunger. Training was provided by Lufkin and PCS plunger systems.
2012 - Refresher training on both plunger lift systems and gas lift
systems. Given by Lufkin and PCS Plunger Systems.
2012 - Training on hydraulic pumping unit set in a horizontal well. Also
refresher on reading a dyno-card
2013 - Refresher on plunger lift systems
2014 - Echometer Certification
2014 - Well Control Certification # N179684