DAVID E. HERNANDEZ
Conway, AR 72033
Home Phone 501-***-****
***********@**********.***
CAREER HIGHLIGHTS:
- Initiated the Successful Turnaround of an under-producing
operation
- Implemented new Operating Systems and Product Lines
- Reduced finished goods Inventories from $10 million to $4
million
- Minimized manufacturing order Cycle Time
- Implemented Lean Manufacturing techniques
- Managed manufacturing Facilities Relocation
- Implemented ISO 9002 Standards and obtained ASME Code
Certification
- Implemented computer systems into production facilities
SUMMARY
Effectively directs employees to meet company objectives, and
financial goals. Determines and implements techniques to
simplify manufacturing processes thereby reducing cost and
increasing productivity.
WORK HISTORY
2/13 - 8/13 Plant Manager, Therma-Flite (Screw Heat
Exchangers)
Responsible for all activities which
include Production, Quality, Purchasing, Receiving,
Manufacturing Engineering, and Human Resources at the El
Dorado plant.
8/02 - 11/12 Plant Manager, TIGG Corporation (Activated
Carbon Filters)
Responsible for all activities at Tigg Corporation Custom
Manufacturing operations. Manage fabrication of Steel and
Plastic filtration vessels. Tripled productivity of tank
fabrication in 2 years with the introduction of state of the
art fabrication equipment and Lean Techniques. Received
Certification and Authorization from ASME and National Board
to manufacture and repair Pressure Vessels. Directed the
relocation TIGG manufacturing facility. Participated in
increasing TIGG total sales by 6 million dollars. Integrated
a network computer system into the production facility.
Implemented labor reporting, and visual aids in the shop.
Maintain flexibility in production schedule and shop floor.
Managed 6 direct reports and 26 plant personnel.
1/01-5/02 Plant Manager, J. V. Manufacturing (Cram-A-
Lot)
Initiated the successful turnaround of
an under-producing operation and yielded profitability within
first year of such effort. Implemented new Operating systems,
Quality system, and new JV products into the manufacturing
facility. Responsible for profit and loss of JV's Conway's
manufacturing operations. Instilled a sense of urgency and
maintained effective communication within plant and business
units. Managed 5 direct reports and 60 plant personnel.
4/97-4/00 Senior Manufacturing Engineer, Frymaster
L.L.C. (ENODIS) (Fryers)
Responsible for the facilities and
maintenance of three manufacturing plants: (Lean
Manufacturing Environment). Responsible for the construction
and renovation of 2 manufacturing facilities. One direct and
13+ indirect reports. Wrote and justified capital
acquisitions. Managed compliance with City, State, and
Federal EPA and OSHA Regulations.
12/84-1/97 Chief Industrial Engineer, Clarke Industries
(Commercial cleaning equipment)
Implemented lean manufacturing techniques which resulted in
$6 million dollar decrease in Finished Goods: Focus Factory,
Build to order, Kanbans, 5S, and Visual Manufacturing.
Managed activities of Cycle Time reduction team which
resulted in 32 day decrease in sales order processing.
Responsible for all plant engineering and maintenance
function: Managed 5 Industrial Engineers, 4 maintenance men
and one M.R.O. Buyer. Managed the activities of 40
Fabrication and Welding employees. Managed implementation of
I.S.O. 9000 Standards into the Manufacturing Dept.
Coordinated activities of Value Analysis Design team.
Responsible for plant layout, scheduling, equipment
justification, budgeting of facility relocation, and
satellite warehouse relocations (Siloam Springs, AR to
Springdale, AR). This resulted in a Promotion. Participated
in the facility relocation from Michigan to Arkansas.
1/84-12/84 Sales Engineer, D & G Surface Finishing
(Equipment Sales)
1/83-1-84 Manufacturing Engineer, Dearborn Brass
(Plumbing Products)
Researched and justified waste treatment equipment for
plating operation effluent. Coordinated purchase and
installation of equipment, and building renovation. Design
work stations to manufacture and package products.
Established standard cost using MTM and time studies.
Prepared plant layouts.
1/81-1/83 Manufacturing Engineer, McEvoy Oilfield
Equipment
Responsible for preparing part routings, developed standard
hours, verified raw material, ensure quality specifications
attainment, machine tool selection. Prepared plant layouts,
coordinated facilities projects, evaluated cost improvements.
Developed monthly plant manning reports.
4/78-1/81 Industrial Engineer, Pep Industries
(Automotive Wire Harnesses)
Developed material routing. Established standard data using
MTM. Responsible for labor efficiency reporting, capital
equipment selection and justification, plant and work station
layout. Designed tooling, jigs and material handling
equipment. Supervised quarterly physical inventories.
9/77-4/78 Industrial Engineer, Ingalls Shipbuilding
(Submarine Overhaul)
2/77-9/77 Industrial Engineer, Synadyne Corporation
(Automotive Wire Harnesses)
EDUCATION
Bachelor of Science Degree in Industrial Management
Technology, Southeastern Louisiana University.