Clarito A. Plaza
Block **, Lot ** Samantha Homes, Bago Gallera Davao City, Philippines 8000
*******.*****@******.***
Heavy Equipment Mechanic
Earthmoving equipment expert specialised in Overhauling or Rebuild Caterpillar Engine and Transmission, excellent in
understanding of troubleshooting handbook and parts survey for every equipment model, mobilized equipment for the
preventative maintenance schedule and other mechanical equipment used in underground and open pit mining operations.
Safety focused with analytical approach to using risk matrix evaluations.
• Comprehensive knowledge of failure parts analysis, evaluate parts for reusability and assemble for pre
load test to ensure smooth operations of every component.
• Organized and Design for component rebuild tooling specifically in workshop area as well as in the fields
of operation.
CORE COMPETENCIES
Mechanical Engineering High Risk Work GI Safety Induction for Industry Workplace
Caterpillar Electronic Technician Work Safety at Heights Conduct Lifting Operations Operate a
Loading Crane Caterpillar Contamination System Component Rebuild System (Caterpillar)
KEY SKILL AREAS
Complete Caterpillar Engine Overhaul from 3300, 3400 and 3500 series Engine.
Dis –assemble and rebuild Brake Caliper System for Komatsu, Terex and Euclid Off Highway Trucks.
All types of earthmoving and operations of all other earthmoving equipment.
Planning and scheduling of earthmoving equipment maintenance service (Preventive Maintenance).
Installation and Test for major component.
PROFESSIONAL EXPERIENCE
HASTINGS DEERING (AUST) LTD. Mackay Queensland Australia SEPT. 2012 – AUG. 2014
Diesel Fitter
Actively participate a toolbox meeting and comply safety guidelines in area of responsibility, Share knowledge to workmate
for Safety and manipulation of special tooling that apply in workshop area. Coordinate to Leading Hand during the start to
finish of every task, Always follow dis assembly and assembly guidelines for every component to be rebuild, Crack test every
major parts prior to assembly and used proper tooling for every step of the job.
Accomplishments:
• Complete rebuild 2 units per week Caterpillar Transmission System for Off Highway Trucks and Dozer
Clarito A. Plaza Page 2
• Meet to complete the task before deadline.
• Keep brand new parts in storage area to prevent contamination thus to minimize trouble and reduce its cost.
HSE MINING PTY. LTD., Emerald Queensland Australia SEPT. 2008 AUG. 2012
Diesel Fitter
Collaborate with sub contractors, operators and workshop supervisor for scheduling of equipment in replacing major
component, follow up warehouse parts availability and ensure all service kit must be completed.
Developed solutions for easy and safe reliable installation of Track Link Dozer, and lay out of lubrication system from Oil Tank
to servicing area. Coordinate to Safety Supervisor and open pit mines Supervisor before field service.
Accomplishments:
• Saved labor cost by performing major Engine Valve Lash for every equipment instead of hiring sub
contractors.
• Saved cost of parts by evaluating used mechanism in assembly of Brake Caliper and lines in Off Highway
Trucks.
• Deliver and complete service of earthmoving equipment ahead of time projection from Mines Operations.
MONARK EQUIPMENT CORP. ( Caterpillar Dealer –Philippines ) JAN. 2005 – AUG. 2008
Sr. Mechanic
Mobilized brand new Generator Set for every customer and discuss the product safety and operations in their premises,
Developed on Site retain Technician at the fields to ensure monitoring maintenance operations and rapidly response in the
event of trouble for every mining equipment., Train and discuss customers version about using an Electronic Troubleshooting
Technician. Dealing contract in repair allied product like Okada Jack Hammer and non Cat equipment.
Organized Safety Program at the workshop premises by wearing complete PPE and safety work precautions.
Accomplishments:
• Closed a margin revenue of about Php 2.6M by completing overhaul of 3500 series Caterpillar Engine for
5 units and 3400 series for 3 units.
• Fabricate and Design special tooling for workshop used that saved almost Php 50K in cost.
• Complete and closed Job Order at specified timeframe schedule.
ADDITIONAL EXPERIENCE
Maintenance Engineer – M&S COMPANY INC. Recodo Zamboanga City Philippines FEB. 2003 – NOV. 2004
Jr. Site Engineer – CHALAROSA CONSTRUCTION CORP., Makati City,Philippines JUN. 1994 – JAN. 1998
Clarito A. Plaza Page 3
EDUCATION, PROFESSIONAL DEVELOPMENT & AFFILIATIONS
Cebu Institute of Technology, Cebu City Philippines
Bachelor of Science in Mechanical Engineering
Hastings Deering Institute of Technology, Paget, West Mackay Queensland Aust.
• Risk Management Refresher Course (Work Health & Safety Act 2011)
• Basic Fire Awareness
• Certificate II in Warehousing Operations(Licence to operate Forklift Truck)
• Caterpillar Electronic Technician
• Caterpillar Service Information System
• Caterpillar Contamination System
• Undertake Manual Handling
IML International, Emerald Queensland Aust.
• Operate Elevating Work Platform
• Certificate II in Surface Coal Operations
• Operate a Loading Crane
• Certificate III in Surface Extraction Operations
• Conduct lifting Operations
St. John Ambulance Australia
• Course in Electrical Safety & Low Voltage Rescue
• Perform CPR
LENNON TRAINING CENTER, Emerald Queensland Aust.
• Conduct Local Risk Assessment
• Apply Initial Response First Aid
• Prepare to work in a Surface Coal Mining Environment
• Course in Generic Induction to Coal Mines
TESDA REGION IX, Zamboanga City, Philippines
• Engine Tune – Up and Troubleshooting (Craftsman Level – 40 Hrs )
PILIPINAS SHELL PETROLEUM CORP., Davao City, Philippines
• Basic Fire Fighting Seminar
PSME CAGAYAN – Cagayan De Oro City, Philippines
• 47TH Annual PSME National Convention (Philippine Society of Mechanical Engineers).
DUTCHBOY PHILIPPINES, Cebu City Philippines
• Technical Lecture on Corrosion and Pipe Technology