Kumar Vishwajeet
Email: -*****.**********@*****.*** Contact # 971- 52-8856968[pic]
TELECOM ENGINEER
Offering an experience of 1+ years on GSM Project across the industry
Leader, Nokia Siemens & Huawei
[pic]
PROFILE & STRENGTHS
. Installation, Integration, Commissioning and Troubleshooting of 2G, and
LTE System and Transmission.
. Adept ability to learn the core technologies of New Systems in Projects.
. Knowledge on BSS Troubleshooting, Commissioning, Validation.
. Conducted research and gave suggestions in solving different problems and
interferences as well as errors and commissions.
Academic Back Ground
Bachelor Degree in Electronics & Communication Engineering
Present Employer
Presently, Working As Project Engineer for Telecom Projects at "Desert
wheel" since June-2014.
[pic]
PROFESSIONAL EXPERIENCE
Team Leader June- 2014- Till now
. Huawei 2G and LTE System Implementation in Dubai for DU Project
. Indoor Installation for 4G Sites BBU, DCDU, Arrester and GPS Antenna.
. Outdoor Installation for 4G Sites RRU, OCB Box, Fiber Cable and Power
Cable.
. 4G Integration and Trouble Shooting.
. Installation, Commissioning and Huawei Transmission Equipment RTN 950.
. Cross Connection, IP Configuration, RSL (Receive Signal Level) Link.
. (1+0), (2+0)
. Installation of RRU BTS 3900 DBS.
. Installation of Huawei OPTIX RTN 605, RTN620, RTN950 indoor units (IDU),
outdoor unit (ODU), coupler with configuration 1+0,1+1 links.
. Installation & Commissioning of MW (0.3, 0.6, 1.2 and 2.0)
. Check the IDU alarms and monitor the power level.
. Power configuration, battery bank, and complete site handover.
Previous Employment
. ALTEL TELECOMMUNICATION INDIA (PVT.LTD).
April-2013 to June-2014
Job Responsibility
To Lead a Team of 4 Technician and deliver the Site (Nokia/IDEA Cellular)
On Air with full activity installation, commissioning and Integration.
GSM Antenna:
* Installation of Katherine & Andrew GSM antennas,
* Orientation and tilting (mechanical) of GSM antennas.
* RF Feeder Cable Connectrisation.
MICROWAVE Equipment:
* Installation of Nokia 0.3m,0.6m,1.2m & 1.8m M/W antennas,
* Worked with 7 & 15 GHz ODU's,
* Microwave Commissioning of RRI and FIU,
* Alignment of 0.3m,0.6m,1.2m & 1.8m M/W antennas,
* Checking receiving level while alignment
NSN BTS:
* Installation of Nokia Ultra site BTS (Outdoor, Indoor) & Metro hub,
* Worked with PWSB, BB2F, BOIA, E1/T1, RRI, ETRX card's etc,
* Worked with WCGA, DVGA, M2LA card's,
* Cable connections between BTS units,
* Commissioning the BTS,
* Software Loading in to the BTS Locally,
* Synchronization in the Chain configuration,
* Traffic allocation for ETRX's in the Traffic Manager,
* E1 bypassing using RRI, FIU and E1/T1 cards,
* E1 Sharing using RRI & E1/T1 cards,
* Integrating the Site with MSC,
* Alarm connections and Verifying Alarm's,
* Troubleshooting in Various aspects to make Site on Air,
* Running the ATP.
P Personal Details:
Name : KUMAR VISHWAJEET
Father's Name : BALMIKI PRASAD
Date of Birth : 16 SEP 1992
Sex : Male
Marital status : Unmarried
Mother Tongue : HINDI
Languages : Hindi, English, (to Read, Write, Speak)
Permanent Address : IMAMWARA GALI STATION ROAD,
P.S+P.O+DIST: NAWADA
: DIST:-Nawada,
STATE:-Bihar, 805110
I hereby declare that all the above facts are true to the best of my
knowledge and I will be responsible for any discrepancy.
KUMAR
VISHWAJEET