CURRICULUM VITAE
Personal Data
Age: ** (D.O.B: 27th-Jul-1979)
Address : Rozelor no.33, 905500 Mangalia,
.
Romania
Civil Status : Married with children
Driving License : Valid European License
Personal Strength: I am self motivated,competent and professional
in my field. With excellent communication and
organisational skills I am able to liase with clients and sub-contractors
alike to ensure projects. Through experience I am well versed in
construction techniques, fabrication and installation methods and
commissioning. Involved with all aspects of projects from planning stages
through fabrication /erection .With 10 years experience in many
construction and fabrication activities including the supervision and
management for the shipbuilding industry I believe this experience would be
an asset to any future employers. Can work autonomously or as part of a
team structure.
Educational Qualifications
1999-2004 Polytechnic University,,Transylvania" from Brasov,
Material Science and Engineering (5 years)
Qualification: Welding Diplomat Engineer
1995-1999,, Ion Banescu" high school from Mangalia, Mechanical profile
Computer skills
Microsoft Office: Excel, Word, PowerPoint, Outlook
AutoCAD
Courses
Daewoo Shipbuilding and Marine Engineering, Okpo Shipyard (South Korea):
- Two weeks with Korean specialists from erection stage I changed
experience in EGW ( Electrogas continuous vertical welding process) for
a new project 4860 TEU containership
Daewoo Mangalia Heavy Ind. Shipyard:
- TPM, TPS, 5S, KAIZEN
Languages English (good written and spoken, extensive technical
vocabulary)
Reference
Cristian Nicolae in capacity as Senior Manager ~ Daewoo Mangalia Heavy
Ind
Tel. +40-730-***-*** or e-mail:
********.*******@****.**.**
Dragos Mihaila in capacity as Pipe Engineer ~ Reinertsen Bergen Norway
. mobil: +47 968 89
926 ******.*******@**********.***
Valentin Stepanov in capacity as Surveyor ~ Lloyd's Register Group
Tel. +97-433-***-*** or e-mail:
********.********@**.***
Work Experience -- Daewoo Mangalia Heavy Ind.
- Outdoor Div./Cargo Hold Section
Deputy Manager
Jan 2009 - till date
Coordination steel outfitting and piping activities on cargo
hold/main deck, hatch-cover install and commissoning. Give the work order
from monthly schedule. Control if foremen respect specification, assuring
are loud at their capacity. Start action of mobilization foremen,
regarding work in shifts and make over time for keeping delivery date.
Participate to meetings with all section for solving production problem.
Key person in relation with Cargotec (MacGregor) also between Owner and
Production for ongoing projects : AHT's: Fairplay Towage
Schleppdampfschifss-Reedere, Bulk Carrier: Larus, Tsakos, Anangel ;
Containers: NSB, Hamburg Sud. Replace the manager in his absence.
- Outdoor Div./ Inspection Section Senior
Assistant Manager
Aug 2007- Jan 2009
Technical inspection and pressure test of tanks, finally
delivery to owner/class representative. Direct collaboration with QA/QC,
Design, Planning and Production sections. Conduct in-process and final
inspection during pressure test of tanks. In charge with fairing (solve all
deformation). Install steel outfitting (hand grip, hand rail, vertical
ladder) and pipe in tanks for cargo hold systems (ballast, bilge, overflow,
anti-heeling). Check the procurement of materials necessary for production.
- Outdoor Div./Erection
Hull surveyor/ Dock stage
Jul 2006-Aug 2007
Monitoring all fitting and welding of subcontractors and ensuring
that all standards and specifications requirements are strictly adhered
during execution and final inspection. Checking on board the
rework/nonconformity for each project in dock/quay stage and include them
in weekly and monthly reports Preparing inspection and test plan for each
project. Performing quality control, inspections and tests at erection
stage in accordance with client construction specification and drawings.
Coordination with client/class inspector. Make nonconformity reports,
correction and preventive action, issue patrol report.
- Outdoor Div./Erection
Welding Engineer
Aug 2004-Jun. 2006
Verifying welds in erection stage are produced in conformance with
the approved WPS. Identify defective works; prepare NCR and follow-up.
Offer drawings, technical support and translate technical documentation to
senior foreman, assuring these are load at their capacity. . Direct
collaboration with Design, Planning and Production sections. Supervise
the Welding Procedures and welders qualification test of sub-contractors.
Coordinate with field QC inspector, scheduling of Non-destructive testing.
Witnessing preheating and post weld heat treatment activities.
ro.linkedin.com/pub/anatoli-chiselev/46/374/59/