Dewan Abd El- Gawad St;
El Saff Elbalad,El Saff, Giza, Egypt
Mobile : +2-012-********
Email : ***.********@*****.***
******.******@*****.***
Bassam Ghreeb Abd El Fattah
Career Objective:
I am seeking a challenging position in a progressive organization that satisfies my potentials &offers opportunities for an advanced &promising career by effectively utilizing and improving my technical/practical skills within a dynamic work group
Education:
* Msc candidate in Cairo university
* Bachelor degree of Engineering – metallurgy and material engineering dept – petroleum and mining faculty - Suez Canal University (2004-2009).
* Major : metallurgical and materials engineering
* Overall grade : Good (70.29%)
* The BS.C project(welding and Inspection of pressure vessels in petrojet company): very good
* Secondary school : High School (98.04%)
Occupation:
* Company : The Petroleum Projects and Technical Consultation CO (PETROJET)
* Department : QA/QC
* Current Position : QA/QC Engineer
Certificates:
* ASNT LEVEL III in Radiographic Testing ID#207246
* ASNT LEVEL III in Liquid Penetrant Testing ID#207246
* ASNT LEVEL III in Magnetic Particle Testing ID#207246
* ASNT LEVEL III in Ultrasonic testing ID #207246
* EDDY CURRENT TESTING Level II
* API 570 Authorized Piping Inspector Certification API Number:43051
* CSWIP Welding Inspector 3.1 Certification No: 85715 (Expiry Date:07-MAR-2019)
* AWS-Certified Welding Inspector (CWI) :AWS- QC1, Certification NO.11071491
* IELTS (the International English Language Testing System) score 5
* The Test of English as a Foreign Language (TOEFL) by Cairo University
* Welding fundamentals from American university in Cairo(AUC)
* Corrosion in petroleum industries certification from high technology institute
* The International Computer Driving License (ICDL).
* Training in Occupational health and safety and secure work environment
* Welding Training course from ITC.
Work History:
A total of 5 years experience in Welding,Inspection, NDT, Quality Control & Quality Assurance in Refineries, Petrochemicals and Oil & Gas industries.
July 2009 – Current
Period
SEP,2014 Till Now
Project Name
South October Petro-Nefertiti Project
Location
Sinai -Egypt
Owner /Client
Zeitco&DANA
Project description
Pipeline and Piping unit construction
Project duties
Responsible for assuring compliance of all construction, welding & quality control activities of the fuel hydrant system construction.
Witness, review & approve all activities procedures.
Material identification, traceability, storage & handling supervisions.
Approve WPS, Witness PQR & WPQ.
Verify electrodes & consumables correctness, storage conditions.
Follow up the implementation of all activities procedure during construction (surveying, stringing, welding, NDT inspection, excavation, lowering & testing).
Complete, update & approve Inspection & Test Plan (ITP) of the project different phases & steps.
Review & approve all the related documents of the project as an approved third party for the consultant final approval.
Attend & approve network blowing, flushing and testing
Period
AUG.2014 TO SEP 2014
Project Name
Reformer plant Shut down
Location
Suez -Egypt
Owner /Client
Suez oil processing company (S.O.P.C)
JOB description
Reformer plant Shut down
Project duties
Performing different methods of NDT during normal operation and shutdowns of REFORMER PLANT including reviewing and verification of inspection procedures according to international specifications
Visual Inspection
Thickness Measurement
NDT for New Welding and Repair
Corrosion Rate Calculation
Hydrostatic Test
Permanent or Temporary Repair Procedure
Period
May.2014 to JUL 2014
Project Name
Crude fired heater and coking fired heater Project
Location
Suez -egypt
Owner /Client
Suez oil processing company (s.o.p.c)
Project description
Construction, Welding, Testing and Inspection of fired heater
Project duties
Responsible for welding and inspection activities in the piping process unit according to ASME B31.3 and steel structure according to AWS D1.1
Period
Apr 2014 to may 2014
Project Name
Distalliation plant Shut down
Location
Suez -egypt
Owner /Client
Suez oil processing company (s.o.p.c)
Project description
Distalliation plant and fired heater tie in
Project duties
Performing different methods of NDT during normal operation and shutdowns of REFORMER PLANT including reviewing and verification of inspection procedures according to international specifications
Visual Inspection
Thickness Measurement
NDT for New Welding and Repair
Corrosion Rate Calculation
Hydrostatic Test
Permanent or Temporary Repair Procedure
Period
Mar.2014 to apr 2014
Project Name
Alkayle banzine unit shutdown
Location
Alex - egypt
Owner /Client
Amrya petroleum refining company (aprc),egypt, alexandria
Project description
Alkayle banzine unit shutdown
Project duties
Performing different methods of NDT during normal operation and shutdowns of REFORMER PLANT including reviewing and verification of inspection procedures according to international specifications
Visual Inspection
Thickness Measurement
NDT for New Welding and Repair
Corrosion Rate Calculation
Hydrostatic Test
Permanent or Temporary Repair Procedure
Period
Feb,2014 TO Mar 2014
Project Name
piping unit construction in Suez Steel Company
Location
Performing all QA/QC activities
Owner /Client
Danieli
Project description
Construction, Welding, Testing and Inspection for piping unit construction
Project duties
Responsible for assuring compliance of all construction, welding & quality control activities of the fuel hydrant system construction.
Witness, review & approve all activities procedures.
Material identification, traceability, storage & handling supervisions.
Approve WPS, Witness PQR & WPQ.
Verify electrodes & consumables correctness, storage conditions.
Follow up the implementation of all activities procedure during construction (surveying, stringing, welding, NDT inspection, excavation, lowering & testing).
Complete, update & approve Inspection & Test Plan (ITP) of the project different phases & steps.
Apr 2013 to Feb 2014
Project Name
Pharaonic Petroleum Company
Location
Suez Central Work Shop
Owner /Client
Bureau Veritas Egypt
Project description
Construction, Welding, Testing and Inspection for Steel Structure
Project duties
Responsible for welding and inspection activities for Steel Structure
Period
JUN 2011 TO APR2013
Job title
Welding engineer
Location
Suez Central Work Shop
Role description
Responsible for all welding activities, Welding Procedure Qualifications and
Welding Performance Qualifications
Period
July 2009 to may 2011
Project Name
E-Styrenics Polysytrene Project
Location
Alex -Egypt
Owner /Client
E-Styrenics
Project description
Piping unit construction: for petrochemical industries
Project duties
Responsible for welding and inspection activities in the piping process unit according to ASME B31.3
Job Description
* Develops welding techniques, procedures, and application of welding equipment to problems involving fabrication of metals, utilizing knowledge of production specifications, properties and characteristics of metals and metal alloys, and engineering principles: Conducts research and development investigations to develop and test new fabrication processes and procedures, improve existing or develop new welding equipment, develop new or modify current welding methods, techniques, and procedures, discover new patterns of welding phenomena, or to correlate and substantiate hypotheses.
* Prepares technical reports as result of research and development and preventive maintenance investigations.
* Establishes welding procedures to guide production and welding personnel relating to specification restrictions, material processes, pre- and post-heating requirements which involve use of complex alloys, unusual fabrication methods, welding of critical joints, and complex postheating requirements.
* * Evaluates new developments in welding field for possible application to current welding problems or production processes.
* Directs and coordinates technical personnel in performing inspections to ensure workers' compliance with established welding procedures, restrictions, and standards; in testing welds for conformance with national code requirements; or testing welding personnel for certification.
* Contacts personnel of other agencies, engineering personnel, or clients to exchange ideas, information, or offer technical advice concerning welding matters.
* perform experimental welding to evaluate new equipment, techniques, and materials.
Computer Skills
* Windows : excellent command on windows 7.
* MS Office : good command on office package.
* Internet Use : good researcher on internet.
Languages
* Arabic : mother tongue
* Englis : excellent reading, writing and speaking
* France : fair
Personnel Data
* Nationality : Egyptian
* Marital : married
* Military service : exempted