Career Objective:

I am seeking a challenging position in a progressive organization that satisfies my potentials &offers opportunities for an advanced &promising career by effectively utilizing and improving my technical/practical skills within a dynamic work group

Education:

* Msc candidate in Cairo university

* Bachelor degree of Engineering – metallurgy and material engineering dept – petroleum and mining faculty - Suez Canal University (2004-2009).

* Major : metallurgical and materials engineering

* Overall grade : Good (70.29%)

* The BS.C project(welding and Inspection of pressure vessels in petrojet company): very good

* Secondary school : High School (98.04%)

Occupation:

* Company : The Petroleum Projects and Technical Consultation CO (PETROJET)

* Department : QA/QC

* Current Position : QA/QC Engineer

Certificates:

* ASNT LEVEL III in Radiographic Testing ID#207246

* ASNT LEVEL III in Liquid Penetrant Testing ID#207246

* ASNT LEVEL III in Magnetic Particle Testing ID#207246

* ASNT LEVEL III in Ultrasonic testing ID #207246

* EDDY CURRENT TESTING Level II

* API 570 Authorized Piping Inspector Certification API Number:43051

* CSWIP Welding Inspector 3.1 Certification No: 85715 (Expiry Date:07-MAR-2019)

* AWS-Certified Welding Inspector (CWI) :AWS- QC1, Certification NO.11071491

* IELTS (the International English Language Testing System) score 5

* The Test of English as a Foreign Language (TOEFL) by Cairo University

* Welding fundamentals from American university in Cairo(AUC)

* Corrosion in petroleum industries certification from high technology institute

* The International Computer Driving License (ICDL).

* Training in Occupational health and safety and secure work environment

* Welding Training course from ITC.

Work History:

A total of 5 years experience in Welding,Inspection, NDT, Quality Control & Quality Assurance in Refineries, Petrochemicals and Oil & Gas industries.

July 2009 – Current

Period

SEP,2014 Till Now

Project Name

South October Petro-Nefertiti Project

Location

Sinai -Egypt

Owner /Client

Zeitco&DANA

Project description

Pipeline and Piping unit construction

Project duties

Responsible for assuring compliance of all construction, welding & quality control activities of the fuel hydrant system construction.

Witness, review & approve all activities procedures.

Material identification, traceability, storage & handling supervisions.

Approve WPS, Witness PQR & WPQ.

Verify electrodes & consumables correctness, storage conditions.

Follow up the implementation of all activities procedure during construction (surveying, stringing, welding, NDT inspection, excavation, lowering & testing).

Complete, update & approve Inspection & Test Plan (ITP) of the project different phases & steps.

Review & approve all the related documents of the project as an approved third party for the consultant final approval.

Attend & approve network blowing, flushing and testing

Period

AUG.2014 TO SEP 2014

Project Name

Reformer plant Shut down

Location

Suez -Egypt

Owner /Client

Suez oil processing company (S.O.P.C)

JOB description

Reformer plant Shut down

Project duties

Performing different methods of NDT during normal operation and shutdowns of REFORMER PLANT including reviewing and verification of inspection procedures according to international specifications

Visual Inspection

Thickness Measurement

NDT for New Welding and Repair

Corrosion Rate Calculation

Hydrostatic Test

Permanent or Temporary Repair Procedure

Period

May.2014 to JUL 2014

Project Name

Crude fired heater and coking fired heater Project

Location

Suez -egypt

Owner /Client

Suez oil processing company (s.o.p.c)

Project description

Construction, Welding, Testing and Inspection of fired heater

Project duties

Responsible for welding and inspection activities in the piping process unit according to ASME B31.3 and steel structure according to AWS D1.1

Period

Apr 2014 to may 2014

Project Name

Distalliation plant Shut down

Location

Suez -egypt

Owner /Client

Suez oil processing company (s.o.p.c)

Project description

Distalliation plant and fired heater tie in

Project duties

Performing different methods of NDT during normal operation and shutdowns of REFORMER PLANT including reviewing and verification of inspection procedures according to international specifications

Visual Inspection

Thickness Measurement

NDT for New Welding and Repair

Corrosion Rate Calculation

Hydrostatic Test

Permanent or Temporary Repair Procedure

Period

Mar.2014 to apr 2014

Project Name

Alkayle banzine unit shutdown

Location

Alex - egypt

Owner /Client

Amrya petroleum refining company (aprc),egypt, alexandria

Project description

Alkayle banzine unit shutdown

Project duties

Performing different methods of NDT during normal operation and shutdowns of REFORMER PLANT including reviewing and verification of inspection procedures according to international specifications

Visual Inspection

Thickness Measurement

NDT for New Welding and Repair

Corrosion Rate Calculation

Hydrostatic Test

Permanent or Temporary Repair Procedure

Period

Feb,2014 TO Mar 2014

Project Name

piping unit construction in Suez Steel Company

Location

Performing all QA/QC activities

Owner /Client

Danieli

Project description

Construction, Welding, Testing and Inspection for piping unit construction

Project duties

Responsible for assuring compliance of all construction, welding & quality control activities of the fuel hydrant system construction.

Witness, review & approve all activities procedures.

Material identification, traceability, storage & handling supervisions.

Approve WPS, Witness PQR & WPQ.

Verify electrodes & consumables correctness, storage conditions.

Follow up the implementation of all activities procedure during construction (surveying, stringing, welding, NDT inspection, excavation, lowering & testing).

Complete, update & approve Inspection & Test Plan (ITP) of the project different phases & steps.

Apr 2013 to Feb 2014

Project Name

Pharaonic Petroleum Company

Location

Suez Central Work Shop

Owner /Client

Bureau Veritas Egypt

Project description

Construction, Welding, Testing and Inspection for Steel Structure

Project duties

Responsible for welding and inspection activities for Steel Structure

Period

JUN 2011 TO APR2013

Job title

Welding engineer

Location

Suez Central Work Shop

Role description

Responsible for all welding activities, Welding Procedure Qualifications and

Welding Performance Qualifications

Period

July 2009 to may 2011

Project Name

E-Styrenics Polysytrene Project

Location

Alex -Egypt

Owner /Client

E-Styrenics

Project description

Piping unit construction: for petrochemical industries

Project duties

Responsible for welding and inspection activities in the piping process unit according to ASME B31.3

Job Description

* Develops welding techniques, procedures, and application of welding equipment to problems involving fabrication of metals, utilizing knowledge of production specifications, properties and characteristics of metals and metal alloys, and engineering principles: Conducts research and development investigations to develop and test new fabrication processes and procedures, improve existing or develop new welding equipment, develop new or modify current welding methods, techniques, and procedures, discover new patterns of welding phenomena, or to correlate and substantiate hypotheses.

* Prepares technical reports as result of research and development and preventive maintenance investigations.

* Establishes welding procedures to guide production and welding personnel relating to specification restrictions, material processes, pre- and post-heating requirements which involve use of complex alloys, unusual fabrication methods, welding of critical joints, and complex postheating requirements.

* * Evaluates new developments in welding field for possible application to current welding problems or production processes.

* Directs and coordinates technical personnel in performing inspections to ensure workers' compliance with established welding procedures, restrictions, and standards; in testing welds for conformance with national code requirements; or testing welding personnel for certification.

* Contacts personnel of other agencies, engineering personnel, or clients to exchange ideas, information, or offer technical advice concerning welding matters.

* perform experimental welding to evaluate new equipment, techniques, and materials.

Computer Skills

* Windows : excellent command on windows 7.

* MS Office : good command on office package.

* Internet Use : good researcher on internet.

Languages

* Arabic : mother tongue

* Englis : excellent reading, writing and speaking

* France : fair

Personnel Data

* Nationality : Egyptian

* Marital : married

* Military service : exempted



Contact this candidate