Abdul Khodor
**** ******* ***, ********, ** *****, 313-***-****, *******@*****.***
Professional Summary & Skills:
Obtained a Certificate in Hybrid Vehicle Systems, and High density Advanced Energy Storage
•
Systems.
Designed electrical wiring Topology according to system Schematics, routing, and assembly plant
•
guidelines
•Lead several wire harnesses rework and testing projects at Suppliers and OEM Plants
•Extensive knowledge of building wire harnesses and associated components
• Proficient in using: Oscilloscope, Logic probe/analyzer, and Scan tools
• Familiar with CAN and LIN Protocols, CANoe, Diagnostics, CANalyzer & Vehicle Spy
Education:
Wayne State University Detroit, MI 12/1998
B.S. Electrical Engineering Technology G.P.A. 3.2/4.0
Professional Experience:
Ford Motor Company Flat Rock, MI
Electrical Functional PVT Engineer 9/2013 – 2/ 2015
Assist troubleshooting vehicles that fail in plant, closure of Electrical Distribution System
EDS and non EDS AIMS issues
Conduct electrical system anomaly/functional testing
Software update: Re flash PCM’s, BCM’s, and IP Clusters using Ford IDS
Liaison for Program Management Team PMT with Product Specialist/plant personnel
Review and drive closure of Fresh Eyes Campaign
Represent Electrical team at Vehicle Quality Reviews Manage Balanced Single Agenda
for Quality BSAQ projects and update system with status regularly
Lead Analytical Warranty System AWS and Early Claims Binning ECB claims analysis
Identify and align to plant internal QLS measurable
Establish interim containment and permanent corrective actions by raising and leading
BSAQ projects to completion
Analyze feedback in the quality system and lead changes to address issues including
buck reviews, internal trends to external warranty/TGW.
Manage glide path, identify and align ECB’s to internal plant QFS
Update form 4 regularly Support Chiefs quality meeting on a weekly basis and Functional
Quality Review FQR meetings
Design Release Engineer, Saturn Engineering, Rochester Hills 05/2012 – 05/2013
Direct CATIA/NX activities for pertinent vehicle wiring design and packaging to meet customer
•
expectations and timing.
Review vehicle system requirements and analyze circuit pin outs
•
Update Battery and vehicle harnesses DFMEA documents
•
Interact with customer from various departments in support of design requirements
•
Design & Release for Battery Harnesses for VF,PF,LX Platforms
•
In and Out Energy Management, Dearborn Hts, MI 09/2011 – 05/2012
• Problem/Issue resolution in timely manner
• Wiring single and three phase and electrical control for heating/cooling systems, Planning view studies,
and writing work schedules
Applied Failure Mode and Effects Analysis (FMEA) of overload occurrences.
•
Construction Delivery Group (C.D.G.), Dubai, U.A.E. 08/2005 05/2011
MEP Engineer
• Managed Progress of Mechanical, Electrical & Pluming activities
• Inspected Electrical, A/C, and Plumbing workmanship and functionality of various Villas’ appliances
and devises
• Ensured engineering work meets specification and quality standards by snag process
• Managed a team of 5 technicians and generated their progress reports
• Implementation of new control technologies ( Building Management System )
LEAR CORPORATION, Southfield, MI 05/2004 06/2005
Product Engineer
• Responsible for updating Wire Harness design and verification of Hyundai Santa Fe and Sonata
Platforms for the NA markets.
• Performed test planning, verification and validation of performance
Applied engineering authorized revisions on wire harnesses to meet blue prints specs and OEM
•
requirements
• Engineering team associate for assigned programs to ensure cost and products meet customer and
company specifications
• Developed a close working relationship & interfaced with multiple departments from South Korea to
ensure proper operations and high customer satisfaction
• Provided project progress reports to project management
ALCOA FUJIKURA Ltd. (AFL) Automotive Division, Dearborn, MI 03/1999 03/2004
Design Release Engineer (DRE)
Participate in customer meetings (PDTs, Zone Reviews, Scroll Reviews and product reviews) on
•
regular basis
• Prepared electrical wire harness design according to system schematics
• Communicated product information to Application and Manufacturing teams
• Updated OEMs engineers with new design changes
Worked in the prototype department mainly on assembling, reworking, and inspecting pre
•
production wire harnesses
Release & support design reviews of 2D wire harness drawings at customer locations
•
Problem/Issue resolution on released parts in timely manner
•
• D&R Engineer for various harnesses Engine, Body, IP – F250 / F350
DAIMLER CHRYSLER CORP, Auburn Hills, MI 10/1998 02/1999
Design Release Liaison Engineer (Contract Engineer)
• Responsible for design, development and release activities including design feasibility, DFMEA
creation, creating functional and performance requirements and specifications
• Conveyed plants issues to design department and updated wire harness release accordingly
Maintained and improved process efficiency and quality standards adherence
•
Engineering support to other functional areas
•