V ignesh Chandramohan
*** * ********* ******, ****** TX – 75203
Email: *******.************@****.***.*********: 682-***-****
SK I L LSET
Certifications Distribution and Logistics Management, Six Sigma Green Belt, SolidWorks & CATIA
Design Packages AutoCAD, Catia, ANSYS, SolidWorks
Simulation Packages Witness Simulation Package
RFID & Research Packages Ubisense, Alien, Impinj
Document Packages Microsoft Excel, PowerPoint, Word
E D UCAT IO NAL QUAL I F ICAT IO NS
M.S., Industrial Engineering (May 2015)
University of Texas at. Arlington
• Specializing in Logistics & Distribution in SCM, Manufacturing & Production planning, Inventory
control, Quality control, Simulation and Facilities Planning, Automation, Metrics, commercialization of
innovative technologies and market analysis.
B.E Mechanical Engineering (June 2013)
Anna University, India
WORK EXPER I E NCE
Engineering Intern January 2013– May
2013
Nissan Motors
• Optimization of a warehouse using supply chain management and logistics principles
• Master Schedule planning for Engineering Trail, Project Trail, Parts Warranty Submission, Purchase
Order, Parts Supply Warrant and divisions
• Prepare Process Schedule for the Handover Job.
Project Trainee June 2011 – July 2011
Hyundai Motors
• Training on the casting, welding, painting, assembling and Transmission divisions
• Specialized training in Spot welding, Chassis Assembly, Material Handling and Automation.
ACADE M I C PROJECTS
Redesigning of a Logistics Distribution Center using Facilities planning October 2014 -
December 2014
• Redesigning the layout to increase throughput and efficiency of Direct-to-Customer products from
their picking\storing zones.
• Achieved increase in distribution by 12% using Pareto’s analysis for products based on demand and
by implementing Material Handling Principles.
Establishing Quality control in a production center using control charts October 2014 – December
2014
• Determined various issues in the center that had affected the quality of the end products.
• Traced the causes and effects of malfunctioning of each process with the help of fishbone diagram
and suggested solutions based on historical data and current trends.
• Established control in each section of the center by using various quality concepts like 5W2H
analysis, Histograms, flow process charts and Control charts (Xbar and Range charts).
Simulation of Steel Nugget Production Facility July
2014
• Simulated the production facility using Witness Simulation Software Package
• Enhance the output of the facility by 13% using optimization procedure and allocating additional
resources
Selection of Straight Line Gain Factor for Differential Drive Mobility Platform December
2013
• Designed the Power and Control Systems for a Mini Tank
• Devised Close Loop and Open Loop Strategy with varying ktsf factor and deviation as output
variable
Designed and Fabrication of Portable Hydraulic press December 2011 – May
2012
• Utilized and converted fluid energy to mechanical work for small operations like pressing, punching,
piercing and bending operations with a pressure of 130 kg/cm 2 and a load capacity of 0.25 tons.
• This was achieved using a hydraulic press with a single acting cylinder controlled by a DCV
assembled together