Seeking assignments in the field of HVAC site execution under Project
Management with a company of reputed organisation.
Snapshot
< A Qualified Mechanical Engineer, with experience of about 2.5 years in
the field of execution of HVAC projects - errection, testing
commissioning and handling over of intrigrated system - presently
working with Sterling & Wilson Ltd Industrial HVAC Division, at Steel
Authority of India Ltd.,Burnpur, Asansol as a Project Engineer (In-
Charge).
< Exposure in implementing HVAC equipments - Splits, Air cooled package AC,
water cooled Package AC, Water cooled condenser units, with related
ancillary equipments like - booster fan,air handling unit, Humidity
control systems, Building Management System, Site monitoring, job
scheduling and planning of job execution at project site, Resource
management, testing of individual equipment as well as the integrated
system, commissioning of individual equipment as well as handing over the
integrated system.
< Abilities in handling multiple priorities, with a bias for action and a
genuine interest in personal and professional development.
< Excellent communication & interpersonal skills with ability to grasp new
concepts quickly and utilise the same in a productive manner.
Career Contour
Till date with M/s Sterling And Wilson Limited - Industrial HVAC Division
as a Project Engineer posted at Steel Authority of India Ltd, Asansol, West
Bengal.
Role/Job Responsibilities:
As an Project Engineer Responsible for Planning / Erection Execution /
Testing & Commissioning of the Intrigrated system :
< It includes complete implementation of quality plan set by QA/QC
department, safety plan made by EHS department and implementation of
erection methodology given by our design methodology team.
< Best Utilisation of man power and resources to get maximum productivity.
< Review of daily job progress with site team, reviewing of the progress of
activities and discussion of weekly progress with our client, consultant
and planning team to achieve set mile stone.
< Ensures everyone understands the group objectives and assists others to
meet business objectives when required.
< Comply with all applicable health, safety and environment laws,
regulation and statutory obligation at all times and ensures work area
housekeeping is managed to provide a safe and healthy environment at all
times with zero accident.
< Attending site meetings, appraising of the site developments to the
Client team and our own management
< Monitoring the commercial issues including the stores and maintain
liaison with the customer for collecting the payments.
< Site co-ordination in terms of getting the errection activities certified
by the consultants and maintain reports thereon.
< Arrange for final hand over of the site by attending to the snags s
pointed out by the customer consultants
< Previous Work Experience
<
< 1.TEESTA LOW DAM PROJECT (NHPC),SIKKIM under M/S TECHNO TRADE
(3 MACHINES OF 20Mw)
< Involvement:-planning & management,maintainance of turbine alongwith
pipeline,synchronization & final checking of machine in running condition
from 2009oct to 2010 jan,site engineer
<
< 2. TEESTA LOW DAM PROJECT (NHPC),DARJEELING under M/S TECHNO TRADE(RADIAL
GATE)
< Involvement:-planning & management,erection of radial gate at dam
site,erection of hydaullic cylinder,pipeline work,in the team of final
checking of the gate from 2010feb to2010 april
3.WEST BENGAL ELECTRICITY BOARD(JALDHAKA)DARJEELING under M/S TECHNO
TRADE (erection of turbine of 9Mw)
< Involvement:-planning,survey of site,foundation layout,checking the
machinery equipments,cetre & baseline checking,erection of draft tube
liner & draft tube elbow,erection of draft tube cone,erection of spiral
casing,currently the wrk of rotar & stator going on,final checking of
all the erection work from MAY 2010 to DEC 2011
Major Milestone Highlights:
< Executed the inspection of all ancillary materials, equipments and core
HVAC equipments at site by customer consultant - M/s Mecon Ltd..
< Executed the Inspection as well as co-ordinated for the welding of MS
pipe at SAIL.
< Executed the Erection of HVAC systems on the foundation as per suit to
site conditions and arranged for approval of the same by the consultant.
< Arranged various in process tests - hydro test of the chilled water /
condenser water pipes, smoke testing / light test of all SA ducts,
activating the fire dampers by annunciation panel and air balancing of
the entire system.
< Commissioned 675 TR HVAC equipments within a time frame of 2 years.
Major Strengths
< An analytical mind with the ability to think clearly and logically.
< Ability to work accurately and pay attention to details.
< A fast learner with excellent problem solving skills.
Education
< B.Tech. (Mechanical) from Rajasthan Institute of Engineering &
Technology, Jaipur; Affiliated to Rajasthan University, Jaipur in 2009
(Secured DGPA of 6.30)
Academic Project
< B.E. Project at RIET,JAIPUR on the topic "To Design Gear Box."
Industrial Trainings
< Training at Durgapur Steel Plant (SAIL), West Bengal.
< Training at NPTI, West Bengal.
IT Skill Set
Languages : C
Operating System : Windows XP, Windows Vista
Packages : MS Office,
Personal Details
Contact Address : BANKER'S COLONY, RAHAMGANJ
DIST-DARBHANGA, STATE-BIHAR,
PIN-846004
Permanent Address : BANKER'S COLONY, RAHAMGANJ
DIST- DARBHANGA, STATE-BIHAR,
PIN-846004
Date of Birth : 25TH JUNE 1987.
Languages Known : English & Hindi