As a Foreman Linesman (United Kingdom - Balfour Beatty)
. Trained and competent on all works of refurbish 275kV overhead
lines.
. Can work as a team to achieve timely completion, safety
regulations and quality standards and project specification.
. Trained as a Chargehand on all works on a towers, platforms, and
deck
. Experienced on different type of conductors (Sorbus and Gap
Conductors.)
. Awarded a Level 2 Diploma in Electrical Power Engineering -
Overhead Lines 600/1673/5 (The City and Guild of London
Institute)
. Ability to interpret drawings, develop / interpret work,
instructions, and plan projects for self and others;
. Ability to climb poles and towers, work at heights, and work in
extreme weather conditions for extended periods of time.
. Trained and experienced on different kinds of overhead line
works
. Earthing, Blocking out and clipping in
. Catching Off and back hanging
. Fitting and joining conductor stockings, Jointing,
pressing and Jumpering
. Spacering (spacer trolley)
. Can work with minimum supervision.
As a Design and Transmission Line Engineer (Philippines - Meralco)
. High experience in design, construction, operation and
maintenance of 115 and 69kV sub- transmission line facilities.
. Ability on timely completion, implementation and processing of
115 and 69kV sub-transmission line projects and maintenance
activities.
. Has knowledge in cost estimation and billing of materials.
. Good background in electrical engineering
. Good working knowledge of a CAD system with significant fulltime
experience on using AUTOCAD.
. Ability to provide ideas and creative solutions to design
problems.
. Excellent working knowledge of engineering drawings and working
to specifications for controls and electrical designs.
. Demonstrate self-motivation.
. Demonstrate ability and initiative to get to the heart of a
problem and take it efficiently through to completion.
. Demonstrate good oral and written communication skills with
peers, subordinates, customers and suppliers.
. Experience of working in a team, discussing work with other team
members and presenting ideas and solutions to engineers or
customers.
. Background in the use of computers and data handling including
Microsoft office systems, Word, Excel, Power point, Visio and
Project.
o WORK EXPERIENCE AT UNITED KINGDOM
Company : BALFOUR BEATTY UTILITY SOLUTIONS (BBUSL)
Division : Overhead Line
Position : Foreman Linesman 2 - also function as
Chargehand
Period Covered : July 29, 2012 - December 18, 2014
Job Summary
. Construction and refurbishment of overhead line 275
transmission line projects of the company.
Job Description
1. Ensure timely completion of overhead transmission line
projects that comply to design specifications and
construction standards.
2. Correctly use and maintain the general and special tools of
the trade including power tools, test equipment and measuring
instruments.
3. Run out, tension, sag, bind in, joint, bond and terminate all
commonly used conductors and service cables.
4. Supervising Groundmen and Apprentices.
5. Install insulators, fastening components and accessories.
6. Operating specialized plant ( Winches, Capstan Tractors and
John Deere 5090)
7. Conduct joint pole staking with design engineer.
WORK EXPERIENCE AT PHILIPPINES
Company : MANILA ELECTRIC COMPANY (MERALCO)
Division : Sub-transmission Line - Line Construction
Position : Transmission Line Engineer
Period Covered : April 27, 2013 - May 1, 2008
September 30, 2003 - December 31, 2005
Job Summary
. Construction of overhead and underground 115 and 69kV sub-
transmission line projects of the company.
Job Description
1. Ensure timely completion of transmission and sub-transmission
line projects that comply to design specifications and
construction standards.
2. Interpret engineering plan and conducts field survey to
identify.
a. Obstructions and accessibility to worksite(s).
b. Required tools and equipment.
c. Affected sub-transmission and distribution line
circuits.
8. Conduct field survey to assess feasibility of the engineering
plan.
9. Conduct joint pole staking with design engineer.
1. Ensure timely completion of transmission and sub-transmission
line projects that comply to design specifications and
construction standards.
2. Interpret engineering plan and conducts field survey to
identify.
a. Obstructions and accessibility to worksite(s).
b. Required tools and equipment.
c. Affected sub-transmission and distribution line
circuits.
10. Conduct field survey to assess feasibility of the engineering
plan.
11. Conduct joint pole staking with design engineer.
12. Assign electrical capital projects or work orders to
contractor (LSCP or Bid project).
13. Monitoring compliance of transmission and sub-transmission
line construction crews to design specifications,
construction and safety procedure and guidelines.
a. Pole locations
b. Constructive units
c. Electrical clearances
14. Perform substation or line switching during pre-arranged
interruptions
15. Identify affected sub-transmission and distribution line
circuits for:
a. Caution tagging
b. Pre-arranged interruption
c. Isolation
16. Assist in materials handling (requisition and return).
a. Manual
b. WOMS(Work Order Management System)
17. Conduct regular field inspections to monitor work progress
and schedule.
18. Prepare work plan for daily line construction activities.
19. Recommend modification of constructive units to address
changes in field condition or non-availability of line
materials.
20. Determine and implement solution to complex construction and
maintenance problems
21. Check Stores Requisition for surplus and salvage materials to
be returned.
22. Conduct inspection of completed projects prior to
energization.
a. Grounding
b. Armoring
c. Connections
d. Electrical clearances
23. Recommend sub-transmission and distribution line
sectionalizing schemes to:
a. Provide safe working area
b. Minimize affected customers
c. Minimize duration of repair works
24. Prepare monthly reports.
a. Project Status
b. Budget Utilization
c. Other reports
25. Prepare as-built engineering plan for the completed
Electrical Capital Project.
Company : MANILA ELECTRIC COMPANY (MERALCO)
Division : Sub-transmission Line - Central Operation and
Maintenance
Position : Transmission Line Engineer
Period Covered : January 1, 2007 - April 31, 200
Company : MANILA ELECTRIC COMPANY (MERALCO).
Division : Sub-transmission Line - North Operation and
Maintenance
Position : Transmission Line Engineer
Period Covered : January 1, 2006 - December 31, 2006
Job Summary
. Operation, inspection and maintenance of 115 and 69kV sub-
transmission line facilities.
Job Description
1. Receive trouble call from System Control regarding system
line trouble.
a. Respond to trouble call from System Control.
a. Locate trouble site
. Gather qualitative data necessary to evaluate source
of line trouble, e.g. pole and line condition,
location, environment, weather condition, etc.
b. Dispatch line personnel to patrol or locate trouble
site.
c. Determine required resources in responding to line
troubles.
d. Document response time and other vital information for
record purposes.
e. Interpret, report and reset relay targets at affected
substations
f. Perform actual substation switching operations to
isolate line trouble
g. Develop plan of action to address system line trouble.
h. Develop new maintenance activities to prevent recurrence
of line troubles.
2. Plan, develop, schedule and implement annual maintenance
plans.
a. Conduct resource analysis and leveling
b. Cost benefit analysis
c. Prioritize maintenance activities by level of urgency
3. Schedule planned corrective maintenance works and create
maintenance work activities in Maintenance Work Monitoring
System (MWMS)
4. Prepare work plan for daily line maintenance activities.
5. Conduct field inspections:
a. To spot defective and hazardous components
b. To monitor work progress and schedule.
c. To identify existing constructive units that does not
conform to current design and construction standards.
6. Initiate immediate corrective maintenance works without pre-
arranged power interruption
7. Coordinate with:
a. Logistics Office to reserve available equipment for
scheduled maintenance works.
b. Sectors regarding affected distribution line facilities.
c. Telecommunication office regarding foreign attachments.
8. Create planned maintenance work activities in Maintenance
Work Management System (MWMS)
9. Update completed maintenance activities in MWMS
10. Performs ultrasonic detection tests on sub-transmission line
circuits for overheating line components.
11. Prepare maintenance work report.
Company : MANILA ELECTRIC COMPANY (AIMSTAFF seconded)
Division : Transmission Design
Position : Design Engineer
Period Covered : January 28, 2003 - September 30, 2003
Job Summary
. Designs and prepares plans involving extensions, revamp and
maintenance of transmission, distribution and street lighting
facilities of the company.
.
Job Description
1. Determining the technical requirements of the project.
2. Conducts field survey to establish existing facilities and
plan the design of the proposed extension or improvement.
3. Conducts field surveys to ascertain details of construction
and determine other data, such as obstruction and clearances
not indicated on maps, measures distance by pacing, using
rolatape or through other means, and notes down other
observations necessary for finalizing designing scheme.
4. Responsible for the preparation of the detailed design of the
transmission and distribution facilities.
5. Encoding the design specification in WOMS.
6. Conduct pole staking after due consultation with the lot
owners and governments agencies (e.g. MMDA, DPWH, LGU'S and
Barangays).
7. Coordinate various phases of design and related activities
with other design and working units to ensure smooth
workflow, adjust engineering schedules when necessary delays,
performs related duties such as meeting with the contractors,
and/or applicant to verify details and other technical data
affecting projects.
8. Conducts occasional field inspection during construction of
projects to ensure that design specification are followed and
renders on-the-spot decisions to effect field revisions when
necessary to avoid delays in completion of the projects
9. Prepares line / route diagram that will serve as a basis of
the transmission line design AutoCAD released 2008, 2010 and
2012
10. Prepares monthly status report and customer related report
using Microsoft Excel.
11. Prepares bill of materials based on engineering plan.
12. Assists and teaches new Design Engineers basic knowledge in
MSOffice and AutoCAD to be used for the preparation of the
design.
PERSONAL DATA
Provincial Address: San Jose, San Miguel, Bulacan
Date of Birth: September 10, 1980
Place of Birth: Manila
Age: 34 years old
Civil Status Married
Nationality: Filipino
Religion Roman Catholic
Height 182 cm
Weight 75 kg
o EDUCATION:
College: UNIVERSITY OF SANTO TOMAS
Espa a, Manila
1997 - 2002
Degree: Bachelor of Science in Electrical
Engineering
Secondary: Our Lady of Perpetual Succor College
Concepcion, Marikina City
1993 - 1997
Elementary: Our Lady of Perpetual Succor College
Concepcion, Marikina City
1991-1993
Angelicum College
Sto. Domingo Church, Quezon Ave, Quezon City
1987-1991
o LICENSURE EXAMINATION:
Registered Electrical Engineer Registered Master Electrician
Board Rating: 87.75 Board Rating: 76.00
o SEMINARS ATTENDED:
Balfour Beatty Years:
BBUS Philippines Training Center
OHLT/PH12-89 (May 14, 2012 - June 8, 2012)
Attended the following:
. Climbing and use of PPE
. Health and Safety
. Demarcating work areas and danger zones
. Using and Transporting Working Platforms
. Spacer trolley
. Method statements, risk assessments and work instructions
. Using of fall prevention system
. Using of fall arrest system
. Lifting and lowering operation with signaling
. Blocking out - all conductors and bundle types
. Catching off and backhanging
. Fitting and joining conductor stockings
. Phase and earthwire conductor running
. Jointing
. Jumpering
. Installing spacers
. Behavioral training
. Tower assembly and erection
. Basic earthing
. SHEA electric
. Tower Rescue
. Manual Handling
. Slinger Signaller
Tower Rescue (Milan Kit)
PL2091
(May 25, 2012)
BBUS Philippines Training Center
Vehicle Marshalling
PL2051
(July 31, 2012)
Newton Training Center (United Kingdom)
Plant Foundation Training
PL2071
(May 25, 2012)
Newton Training Center (United Kingdom
Meralco Years:
My Career In Meralco
July 7 - 8, 2009
Meralco, Training and Development
MMLDC, Antipolo City
Elementary ABC Work \shop
June 25 - 26, 2008
Meralco, Training and Development
Meralco Ortigas
Power Cable Termination II
November 27 - 30, 2007
The Association of Overseas Technical Scholarship (AOTS)
3M Building, South Expressway
Enhancing Communication At Work II
June 20 - 23, 2007
Meralco, Training and Development
Meralco Ortigas
Awakening The Leader In You
WOMS Enhancement Training for
Sub-Transmission
July 27 - 28, 2006
Meralco, Training and Development
Meralco Ortigas
Maintenance Work Management System User's For Sub-Transmission (Team
Leaders)
June 28, 2006
Meralco, Training and Development
Meralco San Joaquin, Pasig City
ISO 9000:2000
Orientation and Documntation Seminar
May 24 - 25, 2006
Meralco, Training and Development
Meralco Ortigas
Enhancing Communication At Work I
May 17 - 19, 2006
Meralco, Training and Development
Meralco Ortigas
Trainor's Training
April 25 - 26, 2006
Meralco, Training and Development
Meralco Ortigas
Defensive Driving Seminar
February 2 - 4, 2005
Meralco, Training and Development
Meralco Ortigas
College Years:
Wiring System Design
August 20 - 22, 2002
Powerline Review Center
Espa a, Manila
Electrical Estimate
August 27 - 29, 2002
Powerline Review Center
Espa a, Manila
Electrical Layout and Design
University of Santo Tomas
Espa a, Manila
Basic Estimate on Electrical Control
University of Santo Tomas
Espa a, Manila
Electrical Estimate
University of Santo Tomas
Espa a, Manila
.
o REFERENCES
Engr. Mon De Ramos
Head, BBUSL Philippine Branch
Cellphone No. +639*********
Kelly Bevins
BBUSL General Foreman (UK)
Cellphone No. +447*********
Engr. Armin M. Del Rosario
Head, STL - Line Construction
Manila Electric Company
Tel.# 16220 local: 4534 - 771
Antonio U. Talattad
Head, Flux Power Contractor
Flux Power Contractor
Cellphone No. +639*********
Engr. Renato O. Maala
Head, STL - North O&M
Manila Electric Company
Tel.# 16220 local: 8208
Engr. Lewis R. Reyes
Superintendent, STL - Line Construction
Manila Electric Company
Tel.# 16220 local: 4534 - 718
[pic]